Loading...
SW_Review_Comments_23609_74thAveW.pdf Stormwater Review Comments for th 23609 74 Avenue W. 1)Make a note of detention volume required and provided on the plans near the detention profile. 2)A profile view of the drainage system is needed. 3)The site is 0.84 acres but the drainage calculations only take into account 0.40 acres. Please provide a description in the drainage report indicating the logic behind reducing the drainage area from 0.84 to 0.40 acres in the drainage calculations. 4)Show where the footing drain connects to the drainage system.