SW_Review_Comments_23609_74thAveW.pdf
Stormwater Review Comments for
th
23609 74 Avenue W.
1)Make a note of detention volume required and provided on the plans near the
detention profile.
2)A profile view of the drainage system is needed.
3)The site is 0.84 acres but the drainage calculations only take into account 0.40 acres.
Please provide a description in the drainage report indicating the logic behind
reducing the drainage area from 0.84 to 0.40 acres in the drainage calculations.
4)Show where the footing drain connects to the drainage system.