Loading...
SW_Review_Comments_24112_114_116_118_84thAveW.pdf Stormwater Review Comments for th 24112/114/116/118 84 Avenue W. 1)Make a note of detention volume required and provided on the plans near the detention profile. (Can red line on plans if necessary) 2)Show where the footing drains connect to the drainage system.