Loading...
SW_Review_Comments2.pdf City of Edmonds TH 121 5 AVENUE NORTH EDMONDS, WA 98020 (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Stormwater Review Comments Permit : Date: # BLD20070789 10/17/2007 Project Name/Address: Edmonds Magic Toyota Parking Garage/21300 Hwy 99 Contact Person/Address/Fax: David Broadus/130 Lakeside Suite 250, Seattle, WA 98122/(206)325-2553, ext. 111. Reviewer: Division Blaine Chesterfield : Engineering During review of the subject submittal it was found that the following information, corrections, or clarifications will need to be addressed: 1.Only meadows (CN 85) or young second growth forest (CN 79) may be assumed for the predevelopment condition. Other land use conditions, such as landscaping or impervious surface, may not be used for the predevelopment condition. The land use selected for the predevelopment condition (either meadows or young second growth forest) shall be that which most closely represents the existing site condition. In this case that would likely be meadows. In other words where additional area is to be added to an existing structure or new impervious area is to be put over gravel, vegetation, dirt, etc… then the predevelopment condition is considered meadow or young second growth forest. If you have any questions on this feel free to give me a call. 2.The assumptions and calculations look good and do not need to be developed condition adjusted. 3.On sheet C4 the GRADING AND STORM DRAINAGE PLAN, label SDMH #4, as a in the plan view and catch basin list. flow splitter 4.The restrictor plate on the side (elev. 351.82) of the control structure in the vault needs to be an orifice on the bottom of an elbow. That is not clearly shown on the plans. 5.Make a note of the detention and on the plans near the detention requiredprovided profile on sheet C7 the NOTES AND DETAILS. 6.Remove the cap on the tee that directs flow to the bypass system from SDMH #4 W/ Flow Splitter. 7.Any construction activity on a site larger that one acre requires a DOE Construction Notice of Intent (NOI). As part of the City of Edmonds NPDES (National Pollutant Discharge Elimination System) Phase II Permit we are required to notify applicants of the need to get a construction NOI. The NOI is a DOE requirement and any questions regarding it should be directed to them. Here is the link to the DOE's NOI website http://www.ecy.wa.gov/programs/wq/stormwater/construction/ The website has information on the NOI, the application form, and contact information. Please resubmit three copies of the revised plans/documents to a Development Services Coordinator. You may contact me at 425-771-0220 if you have specific questions regarding these plan corrections.