Loading...
Swedish Phase 2 Precon Meeting Minutes.pdf PRECONSTRUCTION MEETING AGENDA Swedish Edmonds Ambulatory Care Center City of Edmonds Phase 2 th October 8 2014 1:15pm Swedish Edmonds Ambulatory Care Center th Jobsite Office: 21727 76 Ave, Suite F, Edmonds, WA 98026 Scott Solberg Sellen JoAnne Zulaf City of Edmonds Mark Bucek Sellen Patrick Lawler City of Edmonds Dan Schnebele Sellen Kevin Zweber City of Edmonds Jenna Shope Sellen John Westfall City of Edmonds David Wachob Swedish Todd Wirtz Mayes Testing Bryan Hall Swedish Mike Dolder Mayes Testing Tyler Howren Swedish Jennifer Hempel Mayes Testing Sage Shingle KPFF Robert Metcalfe GeoEngineers Rachel Jenner NBBJ Wade Watkinson KPFF Andris Lapins NBBJ Leif Bjorback City of Edmonds Jim Norman Sellen INTRODUCTIONS A.City of Edmonds a.Patrick is primary inspector, may be backed up by Chuck or Leif if needed. B.Swedish Medical Center a.GeoEngineers Geotechical Inspections b.Mayes Testing Structural Special Inspections i.Todd is project manager, will have several inspectors during construction C.Sellen Construction General Contractor SAFETY A.PPE is required for all visitors on the jobsite. B.All site visitors are requested to attend safety orientation (20 min), schedule with Norm (206) 255- 2163. Design Team safety orientation tentatively scheduled for 11/04/14. C.Work Hours: M-F 7:00-6:00, Sat 10-6. No work Sundays or Holidays. Minimal off hours work is allowed if not exceeding noise ordanance. D.Fire Dept Access: a)All hospital FDCs will remain accessible and unobstructed during construction. b)Shut down hydrants used for temp water every night. Ok to leave meter on. PRECONSTRUCTION MEETING AGENDA Swedish Edmonds Ambulatory Care Center City of Edmonds Phase 2 PROJECT SCOPE & SCHEDULE A. Phases: a)Phase 1: Parking Lot D improvements Schedule Completion 10/17/14 b)Phase 2: Construction of new Ambulatory Care Center & surrounding site improvements. October 20, 2014 thru October 2015 c)Phase 3: Renovation inside existing Hospital. Sept 2015 thru April 2016 PERMIT STATUS A.Building Permit Issued 9/29/14 B.Electrical Permit Pending submittal to L&I C.Elevator Permit Pending submittal to L&I D.Mechanical Permit In City Review. E.Deferred Approvals: (Separate Permits) a)Site Work (obtained 7/15/14) b)Fire Sprinkler Note on shop drawings separation between renovation area and new construction. c)Fire Alarm d)Fire Protection Footprint e)Side Sewer f)Water Meter g)Right of way h)Signage i)Fire Connection j)DAS (Antenna) Provide subcontractor test report to Fire Dept for final approval. F.Deferred Submittals: a)Submit to city electronically, submit per spec and plan requirements. b)Add firestopping systems (products, ULs & EJs) PRECONSTRUCTION MEETING AGENDA Swedish Edmonds Ambulatory Care Center City of Edmonds Phase 2 INSPECTION PROCEDURES A.Inspection Request Protocol a) Scheduling inspections City Inspections: Schedule online, or directly with Pat as backup. If multiple systems are being inspection, only submit 1 request online. Notify Pat ASAP if date/time changes for requeted inspections, preferably in the office before 8:00am. Fire Dept: Schedule via email to John W. & Kevin Z. Back up phone: (425) 775-7720 B.Inspection Reports a)Each special inspection firm to submit to city weekly, copy distribution list C.Sign-off process a)Tracking progress of inspections (highlight plans, inspection log, etc) b)Note grids/locations in inspection log for sign off, or include highlighted plan/map. D.Special Inspections: PRECONSTRUCTION MEETING AGENDA Swedish Edmonds Ambulatory Care Center City of Edmonds Phase 2 a) b)City will issue phased occupancy, no TCO. RECORD DOCUMENTS & CHANGE REVIEW PROCESS A.Record Documents a)Sellen will maintain city approved documents at jobsite office b)RFI Posted record set will be available in PDF format c)Sellen will provide half-size drawing sets for City and Mayes inspectors. B.Changes PRECONSTRUCTION MEETING AGENDA Swedish Edmonds Ambulatory Care Center City of Edmonds Phase 2 a)When are RFI changes required to go through plan check? potential? Clarifications are OK for field review only, sizeable changes will required city review. Pat will advise, Sellen will flag major changes early. Sellen to cc Todd-Mayes on structural RFI responses. b) c)Addendum Structural Revisions Need to be submitted to City ASAP. NBBJ to submit hard copy plans and calcs by end of week. SITE LOGISTICS / ACCESS A.See attached site logistics plan QUESTIONS / COMMENTS Todd-Mayes: -Inspection and deficiency logs to remain on site. Todd will bridge current issues if inspectors change. Notify Sage-KPFF of deficiencies in addition to regular inspection reports. -Shop Inspections: Yakima needs to provide AISC cert to team for record. Shop welding must be inspected, Yakima to schedule with Mayes. Sellen to send Yakima contact info to Mayes. Yakima to submit welding procedures prior to fabrication. Bob-GeoEngineers: Mud slabs are recommended for footings during winter. Inspection Report Distribution List: Scott Solberg Sellen Scott.Solberg@sellen.com Mark Bucek Sellen Mark.Bucek@sellen.com Jenna Shope Sellen Jenna.Shope@sellen.com David Wachob Swedish David.Wachob@providence.org Bryan Hall Swedish Bryan.Hall@providence.org Sage Shingle KPFF Sage.Shingle@kpff.com Tom Hudgins KPFF Tom.Hudgings@kpff.com Wade Watkinson KPFF Wade.Watkinson@kpff.com Scott Meurn KPFF Scott.Meurn@kpff.com Rachel Jenner NBBJ rjenner@nbbj.com Andris Lapins NBBJ alapins@nbbj.com Patrick Lawler City of Edmonds Patrick.Lawler@edmondswa.gov Leif Bjorback City of Edmonds leif.bjorback@edmondswa.gov Todd Wirtz Mayes Testing TWirtz@MAYESTESTING.com Robert Metcalfe GeoEngineers rmetcalfe@geoengineers.com EmergencyEvacuation Area Phase 2 Temporary CurbCut/Drive Apron forParking Garage andLot H & J Vehicle Access J & H to L d na e gar aG gn ikra P ot etu oR sse ccA elc ihe V Routes from New Pedestrian Garage Lot D (Phase 1) Open During Phase 2 Construction Construction Area9/18/14 - 9/21/15 Primary Phase 2Construction Gate (New ACC Building) Entrance t Phase 2 S h e t u t o 6 R g 1 n i k 2 c f u r T o n o i t e c t Routes from NewParking Lot D u Pedestrianr t u s ConstructionLaydown Area n o o C R Phase 2 w e N n oi t a c n o Construction Fence L ko ci a Temporary ht s ka a e rc B Extent of Phase 2 o (Typ) L Build out k c a h s k a e r B - Additional Filters installed- Filters monitored regularly- Add fans as necessary Existing Hospital Air ) D ( tiE x h Et .u no oiSs r t r o co d o uhd r ett ssr o on l n o C Co yt g r t ni n r E u g D ni t si x E Intakes. Swedish Edmonds ACC Ambulance Routing - Additional Filters installed- Filters monitored regularly- Add fans as necessary Phase 2 Site Plan Existing Hospital Air Intakes. 7/24/14