CITY OF EDMONDS
121 STH AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 • FAX (425} 771-0221
Website: www.d.edmonds.wa.us
DEVELOPMENT SERVICES DEPARTMENT
Planning • Building • Engineering
December 20, 2007
Stephen Murakami, Project Manager
Hutteball & Oremus Architecture
4010 Lake Washington BLVD, Suite 320
Kirkland, Washington 98033
RE: Harbor View Plaza @ 152 3rd Avenue South
Building Permit BLD2007-0135
Technically Infeasible request Door No. 5 Plan Sheet A3.1
Dear Mr. Murakami,
GARY HAAKENSON
MAYOR
After review of your request for technical infeasibility from accessibility requirements for
Door No. 5 shown on Sheet A3.1 of approved plans under building permit BLD2007-
0315, the request to keep the existing 32 inch door is hereby granted due to the presence
of existing structural elements that prevent full code compliance.
Sincerely,
4ftgz)
Jeannine L. Graf
Building Official, CBO
• Incorporated August 11, 1890 •
Sister C'itu - HPkinan..Tanan
U Hutteball& remus
December 19, 2007
Anne Bullis, Assistant Building Official
City of Edmonds -- Building Division
121 5"' Avenue North
Edmonds, VITA 98020
RE: Harborview Plaza -- Inferior Remodel
BLD2007-0315
Dear Ms. Bullis,
E
OC,6i1a
"U'L
Ali 3.§�
The general contractor for the €2atelco Properties Tenant Improvement at Harbor View
Plaza has brought to our attention an unforeseen structural condition that will pose
complications for the widening of Door No. 5 (refer to Sheet A3.1). Upon removing the
existing door and frame, the General Contractor, Mike Motland, of Possibilities Unlimited
has uncovered structural tie -downs at each jamb of the existing doorway. in reviewing the
original documents, it is our opinion that it is technically infeasible to remove these hold
downs, as it will pose structural implications to the integrity of the existing structure.
In light of these unforeseen conditions, we are requesting that you allow the existing door
width of thirty-two inches to remain. Per section 104 of the IBC, we are requesting that you
review and approve this modification.
Please do not hesitate to contact me it you have any questions or concerns.
Sincerely,
Stephen Murakami,
Project Manager
Hutteball & Orernm Architecture
smurakamiCcDhoarch.com
425-828-8948
. aHutteba&Ore `mus
December 19, 2007
Anne Bullis, Assistant Building Official
City of Edmonds - Building Division
121 5'" Avenue North
Edmonds, WA 98020
RE: Harborview Plaza — Interior Remodel
BLD2007-0315
Dear Ms, Bullis,
C 41 Ty Or. EDMO�iDS I
The general contractor for the Ratelco Properties Tenant Improvement at Harbor View
Plaza has brought to our attention an unforeseen structural condition that will pose
complications for the widening of Door No. 5 (refer to Sheet A3.1). Upon removing the
existing door and frame, the General Contractor, Mike Motland, of Possibilities Unlimited
has uncovered structural tie -downs at each jamb of the existing doorway. In reviewing the
original documents, it is our opinion that it is technically infeasible to remove these hold
downs, as it will pose structural implications to the integrity of the existing structure.
In light of these unforeseen conditions, we are requesting that you allow the existing door
width of thirty-two inches to remain. Per section 104 of the IBC, we are requesting that you
review and approve this modification.
Please do not hesitate to contact me if you have any questions or concerns.
Sincerely,
Stephen Murakami,
Project Manager
Hutteball & Oremus Architecture
smurakami hoarch.com
425-828-8948
Building Division Comments Page 1 of 1
Bullis, Ann
From: Stephen Murakami [smurakami@hoarch.com]
Sent: Wednesday, December 19, 2007 9:16 AM
To: Bullis, Ann
Cc: scottj@ratelcoproperties.com
Subject: Harbor View Plaza - Tenant Improvement [BLD2007-03151
Dear Ms. Bullis, please find the request for approval of a field modification for the above referenced project attached.
Thank you,
r-
-}�1D 1�41ee Gro- 1xv A 3z&
ltuI.-d V8033
5-2
12/19/2007