Loading...
Temp Shoring Final PE Letter.pdfMICROFILM CITY OF EDMONDS Development Services Department Building Division 121 — 5t Avenue North Edmonds, Washington 98020 Consulting Architectural Attn: Ms. Ann Bullis, Plans Examiner and Engineering Services Subject: final Temporary Shoring Letter Old Milltown Building Renovation Old Milltown Building (Phase I) 201-5 1h Avenue South Edmonds, Washington Dear Ms. Bullis: JRP ENGINEERING, INC. This letter is in response to the City of Edmonds request for an update to our letter dated June 30, 2008 regarding the removal of the temporary shoring that was installed along the concrete retaining wall situated along the east property line at the Old Milltown Building located at 201 — 5th Avenue South in Edmonds, Washington. The temporary shoring for the east foundation wall was installed to brace the wall during the renovation of the building in anticipation of renovation work to be performed in the east portion of the building. The structural renovation of the Phase I west portion of the building consisting of new floor and roof diaphragms and braced steel frames has been completed in accordance with the approved plans. The Phase II east po> pion of the building has been restored to its original condition and is in equal or better condition than it was originally. It is our opinion the concrete wall along the east property line of the building has been restored to the condition and configuration it was in prior to the renovation project and the temporary shoring may be removed from the building. 06089C 1tr I Ldoc 2150 North 107th Street, Suite 375 • Seattle, Washington 98133 1 Tei. (206) 361-7100 • Fax {206) 362-3234 Toll Free (877) 229-5009 Please call if you have any questions or require additional information. Very truly yours, JRP Engineering, Inc. ames R. Perrault, P.E., S.E. President cc: Mr. Ralph Allen, Grace Architects, PLLC 06089c ltr I I.doc 2