TIA - 20730 76th Ave W.pdfCity of Edmonds
Traffic Impact Analysis Worksheet
e ie
Name of Proposed Project: VJ Irt L Ci7�-
Owner/Applicant
'Iv .° lir
Name
Street/Mailing Address
Applicant Contact Person:
Name
Street/Mailing Address
City State Zip City
Telephone:.. _ Telephone:
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
J,A-
Firm Name Contact Name
Telephone:
E-mail:
State Zip
THRESHOLD LEVELS OF ANALYSIS
Proiect Traffic Levels Sections to Complete
I. Less than 25 peak -hour trips generated 1 and 7 only (Worksheet/Checklist)
........ -._._._................._............
II. More than 25 peak -hour trips generated All sections
1. PROJECT DESCRIPTION
a. Location - Street address:,
(Attach a vicinity map and site plan.)
b. Specify existing land use:
0�
c. Specify proposed type and size of development: _....... �..._ -, ,1 r � nzve)
..... -..._................ µµµwww „ (# of residential units and/or square footage of building)
Revised on 6/24/10 E82 - Traffic Impact Analysis Worksheet Page 1 of 5
7. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts. Traffic
impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached)
and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations
in ECDC 18.82.130.
❑ CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If the
previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04),
the 2004 ECDC 18.82.120 impact fee shall be used.
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use
.� .. $ % X
Prior Use $ X
New Use Fee: $ - Prior Use Fee: $ — $ '
, ,: NEW DEVELOPMENT
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use $ X
❑ OTHER
INDEPENDENT FEE CALCULATION: $200.00 (+ consultant fee) $
TOTAL TRAFFIC IMPACT FEE $1009# q S—
rids, Engineering Division Approval Date
1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
Revised on 6/24/10 E82 - Traffic Impact Analysis Worksheet Page 5 of 5