Loading...
TIA - 20732 76th Ave W.pdfOV EQA1 City of Edmonds Traffic Impact Analysis Worksheet Name of Proposed Project: Owner/Applicant Name Street/Mailing Address Applicant Contact Person: Name Street/Mailing Address City State Zip City Telephone: Telephoner Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name..._..................................�..................................... Contact Name Telephone: THRESHOLD LEVELS OF ANALYSIS E-mail: State Zip Project Traffic Levels Sections to Complete I Less than 25 peak -hour trips generated 1 and 7 only (Worksheet/Checklist) ............... ............... ........................................ . .............�... II. More than 25 peak -hour trips generated All sections 1. PROJECT DESCRIPTION a. Location - Street address: — b. Specify existing land user a vicinity map and site plan.) c. Specify proposed type and size of develoPmenta.. 1....Z� -f ............................................................................... (# of residential units and/or square footage of building) Revised on 6124110 E82 - Traffic Impact Analysis Worksheet Page I of 5 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfzp,, etc. Use" New U e $ (l��7• &s— X J U® �'O�d,d.............._._.................................... Prior Use $ X New Use Fee: $ Prior Use Fee: $ = $ 1 f"'.f"'V NEW DEVELOPMENT ITE Land Use CategoryI Per Unit Fee Rate New Use 1.1 OTHER Units to square feet, Fee # of dwelling, vfp, etc. X� = $ 3149, ly1TTT(--ATT()l� FFF RF (�MMFNT) TT —L INDEPENDENT FEE CALCULATION: $200.00 (+ consultant fee) $ TOTAL TRAFFIC IMPACT FEE $ ,Op `p City of . m. nds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. Revised on 6/24/10 E82 - Traffic Impact Analysis Worksheet Page 5 of 5