Loading...
TIA.pdf04-110 PREPARED FOR: �ftQ- �I- PREPARED BY: heffron r . a 6544 NE 61st Street, Seattle, WA 98115 ph: (206) 523-3939 ®fx: (206) 523-4949 Walgreens — Edmonds Way Transportation Impact Analysis • TABLE OF CONTENTS 1. INTRODUCTION........................................................................................................................... 1 I.I. Project Description....................................................................................................................1 ............................................................ 1.2. Study Area................................................................................................................................. 1 2. BACKGROUND CONDITIONS.................................................................................................... 4 2.1. Roadway Network..................................................................................................................... 4 2.2. Traffic Volumes........................................................................................................................ 4 2.3. Level of Service....................................................................................................................... 10 2.4. Traffic Safety........................................................................................................................... 11 2.5. Transit......................................................................................................................................12 2.6. Non -Motorized Facilities........................................................................................................ 12 2.7. Parking.................................................................................................................................... 12 3. PROJECT IMPACTS ..................................................... 3.1. Roadway Network .................................................... 3.2. Trip Generation........................................................ 33. Trip Distribution and Assignment ............................ 3.4. Traffic Operations.................................................... 3.5. Site Access and Sight Distance ................................ 3.6. Queuing.................................................................... 3.7. Safety........................................................................ 3.8. Parking Demand and Supply .................................... 3.9. Transit....................................................................... 3.10. Non -Motorized Facilities ......................................... ............................................................ 13 ............................................................ 13 ............................................................ 13 ............................................................ 18 ............................................................ 22 ............................................................ 23 ............................................................ 24 ............................................................ 26 ............................................................ 26 ............................................................ 26 ............................................................ 26 4. MITIGATION............................................................................................................................... 27 4.1. Traffic Impact Fees................................................................................................................. 27 4.2. Other Mitigation...................................................................................................................... 27 APPENDIX A — Level of Service Definitions - i - February 28, 2012 Walgreens — Edmonds Way heffron Transportation Impact Analysis • FIGURES Figure1. Site Vicinity Map.................................................................................................................... 2 Figure2. Proposed Site Plan.................................................................................................................. 3 Figure 3. Hourly Traffic Volumes on Edmonds Way, east of 100`x' Avenue W ..................................... 5 Figure 4. Hourly Traffic Volumes on 100"' Avenue W, north of Edmonds Way .................................. 5 Figure 5. Existing (2012) Traffic Volumes - PM Peak Hour................................................................. 7 Figure 6. Future (2014) Without -Project Traffic Volumes - PM Peak Hour ......................................... 8 Figure 7. Future (2019) Without -Project Traffic Volumes - PM Peak Hour ......................................... 9 Figure 8. Net New Project Trip Distribution and Assignment — PM Peak Hour ................................. 19 Figure 9. Future (2014) With -Project Traffic Volumes — PM Peak Hour ............................................ 20 Figure 10. Future (2019) With -Project Traffic Volumes — PM Peak Hour .......................................... 21 TABLES Table 1. Level of Service Summary — Background Conditions — PM Peak Hour ............................... 11 Table 2. Collision History (January 1, 2008 to December 31, 2010) ................................................... 12 Table 3. ITE Trip Generation Rates..................................................................................................... 14 Table 4. Total Person Trips Generated by Program............................................................................. 15 Table 5. Primary and Pass -by Trip Percentages................................................................................... 16 Table 6. Proposed Project's Vehicle Trip Generation.......................................................................... 16 Table 7. Existing Site Vehicle Trip Generation................................................................................... 17 Table 8. Net Change in Vehicular Trip Generation.............................................................................. 17 Table 9. Level of Service Summary — 2014 & 2019 Without- and With -Project Conditions .............. 22 Table 10. Design Intersection Sight Distance...................................................................................... 23 Table 11. Existing and Forecast Queues at Edmonds Way/ 100"' Avenue W ....................................... 25 Table 12. Project Impact Fee Estimate................................................................................................. 27 - ii - February 28, 2012 Walgreens — Edmonds Way Transportation Impact Analysis tr"ansf ortation, nc. This report evaluates the transportation impacts associated with the proposed Walgreens store and drive-in bank at 9801 Edmonds Way (State Route 104 [SR 104]) in Edmonds, Washington. It documents the existing conditions in the site vicinity, presents estimates of project -related traffic, and evaluates the anticipated impacts to the surrounding transportation system including access and circulation, safety, transit, and pedestrian facilities. The methodology for this analysis follows the City of Edmonds' guidelines for traffic impact analyses.' 1.1. Project Description The project site is located on Edmonds Way, just east of 100th Avenue W, as shown on Figure 1. The site is currently occupied by the Robin Hood Lanes bowling alley and has one existing access driveway at its eastern edge on Edmonds Way. The site is located directly east of the PCC Natural Market and All the Best Pet Care (together referenced in this report as the PCC site), which has two access driveways on Edmonds Way and one driveway at 100`' Avenue W. The westernmost PCC driveway on Edmonds Way is restricted to right -turns -in and out; the easternmost PCC driveway on Edmonds Way is unrestricted. The PCC driveway on 100`' Avenue W is unrestricted. Vehicle access is allowed between the two sites, which also share the parking lot, so trips generated by both sites utilize all four of the existing driveways described. The proposed project would remove the existing bowling alley (24,336 square feet [sf]) and construct a Walgreens (14,490 sf) with a pharmacy drive-through window and a bank (up to 4,000 sf) with a drive- through window. Figure 2 shows the proposed site plan. The project would reconfigure parking on the site, resulting in a reduction of about 39 parking spaces. When complete, the combined project site and PCC site would have a total of 238 parking spaces in the shared surface parking lot. The project would widen and re- pave the east and center driveways that currently exist at Edmonds Way. Construction is planned to begin in 2013 and be completed by 2014. 1.2. Study Area The study area for this analysis was coordinated with City of Edmonds staff.Z It includes the three City analysis intersections3 located nearest the site, and the four access driveways that serve the project and PCC sites. The analysis intersections are summarized as follows: ® Edmonds Way/ 100`" Avenue W ® Edmonds Way / 95`' Place W ® 100th Avenue W (9th Avenue S) / 220th Street (Elm Way) ® Edmonds Way / East Driveway ® Edmonds Way / Center Driveway ® Edmonds Way / West Driveway ® 100th Avenue W / 100th Avenue W Driveway 1 City of Edmonds, Development Information, Traffic Impact Analysis Requirements, updated June 24, 2010. 2 Bertrand Hauss, City of Edmonds Public Works, February 2012. 3 Analysis intersections are defined in the City of Edmonds Comprehensive Transportation Plan, November 2010. - 1 - February 28, 2012 N Not to Scale Figure 1 VICINITY MAP r a n 's' o r a o n sF.n c< N Not to Scale Figure 2 heffron SITE PLAN ' 0.2E 2012 Walgreens — Edmonds Way Transportation Impact Analysis heffron trans.• ort;at�on rrrc. This section describes the existing roadway network, traffic volumes, traffic operations at the study intersections, parking conditions, safety, and transit and pedestrian facilities in the site vicinity. It also describes how these conditions may change in the future without the proposed project. The project is expected to be complete and occupied in year 2014. The City of Edmonds requires both a future `year -of -opening' analysis and a `five-year after year -of -opening analysis.' Therefore, both years 2014 and 2019 were evaluated for future without- and with- project conditions. No major transportation improvements are planned in the study area.`' Therefore, existing roadway conditions were assumed for all future -year analyses. 2.1. Roadway Network The project is located on the northwest corner of 100t" Avenue W and Edmonds Way (SR 104). These roadways are described as follows: Edmonds Way (SR 104) is a principal arterial that provides regional access for the City of Edmonds, connecting to the Edmonds -Kingston ferry terminal to the west, and to SR 99, Interstate 5 (I-5), and SR 522 to the east. It has an east -west orientation adjacent to the site but generally has a northwest - southeast orientation through the city. Adjacent the project site, it has two travel lanes in each direction and a center -two-way left -turn lane. It has a speed limit of 35 mph. Curbs, gutters and sidewalks are provided along both sides of the roadway. No on -street parking is provided on this roadway. 100'h Avenue W is a north -south minor arterial. North of 200th Street SW, this roadway is called 9"' Avenue S as it continues north to SR 524. To the south it transitions to 8"' Avenue NW (south of NW 205"' Street). Adjacent to the site, this roadway has two travel lanes in each direction and a center - two -way left -turn lane. North of Edmonds Way it has a speed limit of 30 mph and south of Edmonds Way it has a speed limit of 35 mph. Curbs, gutters and sidewalks are provided along both sides of the roadway. No on -street parking is allowed in the site vicinity. 2.2. Traffic Volumes New 24-hour machine counts were commissioned for this project and conducted on Tuesday, January 24 and Wednesday January 25, 2012, on the streets adjacent to the site. The 24-hour traffic data were compiled to confirm Average Daily Traffic (ADT) on the adjacent streets, and also the times at which the peak periods occur. Figure 3 shows the hourly volumes on Edmonds Way, which currently has an ADT of about 20,300 vehicles. The peak volumes occur in the evening between about 4:30 and 5:30 P.M. Traffic volumes on this roadway do not reflect typical AM and PM peaks; after the AM peak hour, volumes decrease slightly, but then build steadily from about 10:00 A.M. until the PM peak period. Volumes in the eastbound and westbound directions are fairly evenly split throughout a typical day, with slightly higher eastbound volumes in the morning, and slightly higher westbound volumes in the evening. Figure 4 shows the hourly volumes on 100"' Avenue W, which currently has an ADT of about 12,300 vehicles. The peak volumes occur in the evening between about 4:30 and 5:30 P.M. Traffic volumes on this roadway exhibit more distinct peaks, with higher southbound volumes in the morning, and higher northbound volumes in the evening. 4 City of Edmonds, Six Year Transportation Improvement Program (2012-2017) - 4 - February 28, 2012 Walgreens — Edmonds Way heffron Transportation Impact Analysis • Figure 3. Hourly Traffic Volumes on Edmonds Way, east of 100th Avenue W 1,800 1,600 1,400 1,200 0 x 1,000 a a) 75 800 c a) 600 400 200 0 0 0 0 0 0 0 0 0 o O O O o 0 0 0 o O o o O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (V N M V '0 O r M M M V' cD I— M M O Weekday - Time Beginning Source: Quality Counts, LLC, January 2012. Figure 4. Hourly Traffic Volumes on 100th Avenue W, north of Edmonds Way 1,200 1,000 800 0 x 400 200 0 0 0 0 0 0 0 0 0 0 0 0 C. 0 0 0 0 o O o 0 0 o O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 V' Lo (D I- M m O Weekday - Time Beginning Source: Quality Counts, LLC, January 2012. -5 - February 28, 2012 Walgreens — Edmonds Way heffron Transportation Impact Analysis • • New PM peak period traffic counts were conducted at all seven study area intersections by Quality Counts, LLC on Tuesday, January 24, 2012. The existing PM peak hour volumes for the study area intersections are shown on Figure 5. To estimate future background (without project) traffic conditions, a compound annual growth rate of 1.2% was applied to existing volumes. The growth rate was derived by comparing existing and 2025 traffic volumes from the Comprehensive Transportation Plans for the Edmonds Way/100t" Avenue W intersection. Next, trips associated with pipeline projects (development projects that have been permitted, but not yet constructed) in the area were added to the future baseline volumes. The pipeline projects included in this analysis are: • 23014 Edmonds Way Property6 • Key Bank at the southwest corner of Edmonds Way/ 100"' Avenue W' By 2014, Edmonds Way is projected to have an ADT of 20,800 vehicles; 100"' Avenue W is projected to have an ADT of 12,600 vehicles.$ Figure 6 shows the projected PM peak hour volumes at the study intersections for 2014 without -project conditions. By 2019, Edmonds Way is projected to have an ADT of 22,100 vehicles; 100`" Avenue W is projected to have an ADT of 13,400 vehicles. Figure 7 shows the projected PM peak hour volumes at the study intersections for 2019 without -project conditions. 5 City of Edmonds, Comprehensive Transportation Plan, November 2009. 6 Gibson Traffic Consultants, 23014 Edmonds Way Property Traffic Impact Analysis, February 2011. Jake Traffic Engineering, Inc., Edmonds Key Bank Traffic Impact Analysis, July 2011. 8 Future ADTs estimated by applying the estimated average annual growth rate of 1.2% to existing ADTs. - 6 - February 28, 2012 51 +-104 114 274 a— 54 X126 1 f 32--+ 458137 2 3-+3: 3: 3: 3: 0) � 03 40 +-71 y 0 00 Q � � m 362 m-1 ®jL 44 39 � �j 3 --p.( 575 58 52 -y 62 47 248 63 �--600 ®1 1 f--145 61---+ � 618— 423128 159 -a 205 PCC 26 1+-48 ®1 ®— 930 909 --b. 13 25 +- 20 41 14---965 10----+ 899—� LEGEND Traffic Signal - —XX PM Peak Hour Volume as 17 0 10 m-963 a1 5 F" 919 d 0 5 5-+ 5 i N Not to Scale SW 224th Street SW Street SW 39 X72 108 0 868 j--2 122— I� 786 0 3 1� 2 Edmonds Walgreens EXISTING 112) TRAFFIC VOLUMES d' o 1 i II _`HOURrents or= a vn rnG 50 +-105 � 2�90�55 ,130 15-----+ T F 35 —1- 480140 5� 5 / ' 4014 384 ® 1 44 39----+ T [* 3 600 58 52 z 62 ' +-215 \ 50 255175 ®--615 41 � X150 60----+ 41 t r* — 635 445130 170. 220 26 '- 48 ®J a— 954 940 —t� LEGEND Traffic Signal �+—XX PM Peak Hour Volume PCC 10 +_0 13 2I5 20 (17 0 +--987 4-1 4--989 5 10 ----+ 0----+ T I" 930—® 950—) 5 0 5 5-11 , N Not to Scale 224th Street SW Sw 40 t-- 75 1 5 4-- 900 4] 1 4 f--5 125 �t r"' 810—p- 5 5 Edmonds 1 i 1 ,- 2014 -WITHOUT -PROJECT TRAFFICVOLUMES dmonds Way& 100 Avenue W PM PEAK HOUR I n or aAXIMANNIM, (U U C (6 > > <t Q L L O000) L C LO 0) PCC 10 +_0 13 2I5 20 (17 0 +--987 4-1 4--989 5 10 ----+ 0----+ T I" 930—® 950—) 5 0 5 5-11 , N Not to Scale 224th Street SW Sw 40 t-- 75 1 5 4-- 900 4] 1 4 f--5 125 �t r"' 810—p- 5 5 Edmonds 1 i 1 ,- 2014 -WITHOUT -PROJECT TRAFFICVOLUMES dmonds Way& 100 Avenue W PM PEAK HOUR I n or aAXIMANNIM, 55 '115 1310 x-60 X135 15�T f 35 — ® 510150 5- 5 i � 4014 409 L +7-44 39 ----# �T f 3 645 58 52 � 62 50 270185 x--655 X160 65---+ T f 675-* 470140 180 -j 235 i 26 It— 48 41 ®-1019 1000--l'. LEGEND Traffic Signal - —XX PM Peak Hour Volume PCC 13 25 1 +--20 41 L ®-1054 �dy 1 01I 10 7 1052 ai 5 1010—� 5 0 5 N Not to Scale 220th 224th Street SW Sw t 80 115 5 40 4---955 41 � F-- 5 135 T F 860 --® 5 5 5 Edmonds Walgreens Figure 7 2019 -WITHOUT -PROJECT TRAFFIC VOLUMEs, heffron Edmonds , i 1 10 " Avenue W PM PEAK HOUR k r o11*.a on ane: 03 7 N > 00 LO O O O PCC 13 25 1 +--20 41 L ®-1054 �dy 1 01I 10 7 1052 ai 5 1010—� 5 0 5 N Not to Scale 220th 224th Street SW Sw t 80 115 5 40 4---955 41 � F-- 5 135 T F 860 --® 5 5 5 Edmonds Walgreens Figure 7 2019 -WITHOUT -PROJECT TRAFFIC VOLUMEs, heffron Edmonds , i 1 10 " Avenue W PM PEAK HOUR k r o11*.a on ane: Walgreens — Edmonds Way heffron Transportation Impact Analysis 5- • 2.3. Level of Service Level of service (LOS) analysis was performed to document PM peak hour traffic operations in the study area. The PM peak hour is the focus of this analysis because it is typically the most congested hour of the day. Level of service is a qualitative measure used to characterize traffic operating conditions of roadways and intersection. Six letter designations, "A" through "F," are used to define level of service. LOS A is the best and represents good traffic operations with little or no delay to motorists. LOS F is the worst and indicates poor traffic operations with long delays. Appendix A presents the level of service criteria for signalized and unsignalized intersections. The City has adopted a standard of LOS D for signalized intersections of principal or minor arterials; levels of service that are worse than LOS D (LOS E or LOF F) are considered to be deficient operations. Since Edmonds Way (SR 104) is a Highway of Statewide Significance, it is not subject to City standards. However, the Edmonds Way/100t" Avenue W intersection is monitored by the City. The City standards do not apply to driveway intersections; for this analysis, operations at driveways were considered to be acceptable if all stop -controlled movements operate at LOS E or better. Levels of service were calculated using methodologies based on those presented in the Highway Capacity Manual (HCM).9 All level of service calculations were performed using Trafficware's Synchro 8.0 analysis software. The analysis results are reported from the Synchro calculation module, which refines the HCM methods to account for more detailed driving behavior. Results for unsignalized intersections were reported using the HCM Unsignalized module. Intersection geometry, traffic signal timing, and signal phasing for this analysis were verified through field observation. Table 1 summarizes the level of service results for existing (2012), future 2014 -without -project, and future 2019 -without -project conditions. As shown, the Edmonds Way/100"' Avenue W intersection currently operates at LOS D and the other two City analysis intersections operate at LOS B. All three intersections are expected to remain at these levels of service in 2014 and 2019 without the Walgreens project. All movements at the four existing driveways currently operate at LOS C or better, and are expected to remain so in 2014 and 2019 without the project. 9 Transportation Research Board, 2010. - 10- February 28, 2012 Walgreens - Edmonds Way Transportation Impact Analysis n - � transportation. rnc. Table 1. Level of Service Summary - Background Conditions - PM Peak Hour Source: Heffron Transportation, February 2012. All level of service analyses were performed using the Synchro 8.0 analysis software and methodology. 1. Level of service. 2. Average seconds of delay per vehicle. 3. Unsignalized intersection. Level of service and delay are reported for the stop -controlled movements onto the main street and for the overall intersection average. 2.4. Traffic Safety The three most recent years of available collision data were obtained from the Washington State Department of Transportation (WSDOT) for the intersections and roadway segments in the study area. These data were examined to determine if there are any unusual traffic safety conditions that could impact or be impacted by the proposed project. The data cover the period from January 1, 2008 through December 31, 2010 and are summarized in Table 2. The highest number of collisions (29) occurred at the Edmonds Way/100t" Avenue W intersection, with over 75% (22) occurring as rear -end collisions. When considering the volume of traffic served by the intersection, the rate of collisions (approximately 0.81 collisions per million entering vehicles) is not unusual for a high-volume signalized intersection. None of the collisions reported during the analysis period resulted in fatalities. The collision data for the study area intersections and roadway segments do not indicate unusual safety conditions. - 11 - February 28, 2012 Existing 2014 Without Project 2019 Without Project LOS 1 Delay 2 LOS Delay LOS Delay Signalized Intersections Edmonds Way/100th Avenue W D 37.1 D 38.8 D 41.8 Edmonds Way/95th Place W B 11.1 B 11.6 B 12.4 100th Avenue W/2201h Street SW B 15.5 B 16.1 B 16.8 Unsignalized Intersections 3 Edmonds Way/East Driveway (overall) A 0.3 A 0.3 A 0.3 Northbound movement B 13.8 B 14.0 B 14.6 Southbound movement B 12.7 B 12.8 B 13.0 Edmonds Way/Center Driveway (overall) A 0.4 A 0.4 A 0.3 Southbound movement B 14.9 C 15.1 C 15.4 Edmonds Way/West Driveway (overall) A 0.2 A 0.2 A 0.1 Southbound movement B 12.4 B 12.5 B 12.9 100th Ave W/1 00th Ave Driveway (overall) A 2.6 A 2.5 A 2.4 Eastbound movement B 12.5 B 12.7 B 12.9 Westbound left -turn movement C 16.3 C 16.6 C 17.2 Westbound right -turn movement A 9.3 A 9.3 A 9.4 Source: Heffron Transportation, February 2012. All level of service analyses were performed using the Synchro 8.0 analysis software and methodology. 1. Level of service. 2. Average seconds of delay per vehicle. 3. Unsignalized intersection. Level of service and delay are reported for the stop -controlled movements onto the main street and for the overall intersection average. 2.4. Traffic Safety The three most recent years of available collision data were obtained from the Washington State Department of Transportation (WSDOT) for the intersections and roadway segments in the study area. These data were examined to determine if there are any unusual traffic safety conditions that could impact or be impacted by the proposed project. The data cover the period from January 1, 2008 through December 31, 2010 and are summarized in Table 2. The highest number of collisions (29) occurred at the Edmonds Way/100t" Avenue W intersection, with over 75% (22) occurring as rear -end collisions. When considering the volume of traffic served by the intersection, the rate of collisions (approximately 0.81 collisions per million entering vehicles) is not unusual for a high-volume signalized intersection. None of the collisions reported during the analysis period resulted in fatalities. The collision data for the study area intersections and roadway segments do not indicate unusual safety conditions. - 11 - February 28, 2012 Walgreens — Edmonds Way Transportation Impact Analysis heffron tram ortat�on inc.' Table 2. Collision History (January 1, 2008 to December 31, 2010) Source: Compiled by Heffron Transportation, Inc., from data provided by Washington State Department of Transportation, February 2012. 2.5. Transit Community Transit provides transit service to the study area with routes along Edmonds Way and 100"' Avenue W. Route 130 provides daily local bus service between Edmonds Station and the Lynnwood Transit Center, with stops in downtown Edmonds, Shoreline, and Mountlake Terrace, with 30 minute headways throughout most of the day. Route 416 provides weekday commuter service between Edmonds Station and downtown Seattle, with four buses from Edmonds to Seattle in the morning, and four buses from Seattle to Edmonds in the evening. Bus stops near the site include: • Edmonds Way, just west of 100"' Avenue W, serves westbound routes 130 and 416 ® Edmonds Way, just east of 100t" Avenue W, serves eastbound route 416 ® 100"' Avenue W, just south of Edmonds Way, serves southbound route 130 2.6. Non -Motorized Facilities Sidewalks exist along both frontage streets in the site vicinity. There are marked crosswalks on all legs of the adjacent signalized intersection at Edmonds Way/100"' Avenue W. North of the site, 100"' Avenue W is designated as a bicycle route, but does not include any dedicated bicycle facilities. 2.7. Parking The existing combined PCC and project sites have about 277 parking spaces. On -street parking is not available along the two adjacent streets (Edmonds Way and 100t" Avenue W) near the site. - 12- February 28, 2012 Head- Rear- Side- Right Left Right Peds/ Total for Average/ Intersection On End Swipe Turn Turn Angle Cycle Other 3 Years Year Edmonds Wayl100th Ave W 0 22 2 1 1 1 0 1 29 9.7 Edmonds Way/97th Ave W 0 1 0 0 2 0 0 0 3 1.0 Edmonds Way/95th Place W 0 5 0 2 2 2 1 3 15 5.0 100th Ave W/1 51h St SW 0 1 0 0 0 0 0 1 2 0.7 100th Ave W1224th St SW 0 1 0 0 0 0 0 0 1 0.3 100th Ave W/9th Ave/Elm/220th St 0 4 0 0 2 0 0 1 7 2.3 Head- Rear- Side- Right Left Right Peds/ Total for Average/ Roadway Segment & Limits On End Swipe Turn Turn Angle Cycle Other 3 Years Year Edmonds Way: 97th Ave to 100th Ave 0 1 0 0 7 0 0 1 9 3.0 Edmonds Way: 95th PI to 97th Ave 0 0 0 0 2 0 0 0 2 0.7 100th Ave: Edmonds Way to 151h Ave 0 1 1 1 5 0 0 0 8 2.7 100th Ave: 15th Ave to 224th St 0 0 0 0 0 0 0 1 1 0.3 100th Ave: 220th St to 224th St 0 1 0 0 0 0 0 2 3 1.0 Source: Compiled by Heffron Transportation, Inc., from data provided by Washington State Department of Transportation, February 2012. 2.5. Transit Community Transit provides transit service to the study area with routes along Edmonds Way and 100"' Avenue W. Route 130 provides daily local bus service between Edmonds Station and the Lynnwood Transit Center, with stops in downtown Edmonds, Shoreline, and Mountlake Terrace, with 30 minute headways throughout most of the day. Route 416 provides weekday commuter service between Edmonds Station and downtown Seattle, with four buses from Edmonds to Seattle in the morning, and four buses from Seattle to Edmonds in the evening. Bus stops near the site include: • Edmonds Way, just west of 100"' Avenue W, serves westbound routes 130 and 416 ® Edmonds Way, just east of 100t" Avenue W, serves eastbound route 416 ® 100"' Avenue W, just south of Edmonds Way, serves southbound route 130 2.6. Non -Motorized Facilities Sidewalks exist along both frontage streets in the site vicinity. There are marked crosswalks on all legs of the adjacent signalized intersection at Edmonds Way/100"' Avenue W. North of the site, 100"' Avenue W is designated as a bicycle route, but does not include any dedicated bicycle facilities. 2.7. Parking The existing combined PCC and project sites have about 277 parking spaces. On -street parking is not available along the two adjacent streets (Edmonds Way and 100t" Avenue W) near the site. - 12- February 28, 2012 Walgreens — Edmonds Way heffron Transportation Impact Analysis • M 0 • This section of the report describes the conditions that would exist with full occupancy of the proposed Walgreens and bank. The net difference between the without -project and with -project conditions was evaluated. The net increase in project -generated site trips was added to the 2014 without -project traffic volumes to estimate with -project traffic. Finally, level of service analysis was performed to determine the proposed project's impact on traffic operations in the study area. Impacts to traffic safety, transit, non -motorized facilities and parking were also determined. The following sections describe the methodology used to determine these impacts. 3.1. Roadway Network The project would improve the existing center and west driveways on Edmonds Way; the center driveway would be widened to include both an outbound right -turn and left -turn lane. The west driveway would be widened and paved, but would still have one outbound lane. The project would upgrade the frontages, including new sidewalk and landscaping along Edmonds Way. No off-site roadway improvements are proposed with the project. 3.2. Trip Generation The potential redevelopment would include two actions that would influence traffic near the site: 1. Removal of the existing bowling alley, and 2. Construction of the proposed new Walgreens store and bank. Traffic analysis was performed using the net change in site -generated trips, which is the difference between the trips generated by the existing and the proposed uses. The following describes the methods used to determine the change in traffic anticipated from the proposed project. 3.2.1. Trip Rates Trip generation for the proposed redevelopment was estimated using rates published by ITE, which compiles trip generation counts throughout the country for a variety of land -use types. Trip generation rates and equations from Trip Generation10 were applied based on the existing and proposed types of uses at this site. Table 3 summarizes the trip generation rates used for this analysis. 10 Institute of Transportation Engineers (ITE), 81h Edition, 2008. - 13 - February 28, 2012 Walgreens — Edmonds Way heffron Transportation Impact Analysis • Table 3. ITE Trip Generation Rates ITE Land Use Code Land Use Daily PM Peak 437 BowlingAlley y 33.33 trips/1,000 sf 3.54 trips/1,000 sf 50% in, 50% out 35% in, 65% out 881 Pharmacy/DrugStore with Drive-Thru Window 88.16 trips/1,000 sf 10.35 trips/1,000 sf 50% in, 50% out 50% in, 50% out 912 Drive -In Bank 148.15 trips/1,000 sf 25.82 trips/1,000 sf 50% in, 50% out 50% in, 50% out Source: Institute of Transportation Engineers, 8th Edition, 2008. 3.2.2. Person Trips Person trip estimates were estimated by multiplying rates in Trip Generation by the estimated number of persons per vehicle (average vehicle occupancy [AVO]) for each specific land -use type. To determine the total number of person trips that the project would generate, an AVO rate for each land use was applied. Trip Generation does not include an AVO rate for either of the proposed land uses, so an average retail rate of 1.20 persons per vehicle was selected based on evaluation of other retail rates. The total number of person trips includes "internal trips," or trips made between different uses on the site. The proposed Walgreens and bank will be adjacent to each other, and adjacent to the existing PCC Natural Market; therefore, it is reasonable to assume some amount of internal trips would occur between these three land uses. An example of an internal trip would be if a patron drove to the bank and then parked the car and walked to Walgreens. If the Walgreens were located on a different site, the patron would exit the bank driveway and drive to a different location. The internal trips between uses on the site are assumed to occur primarily on foot, and would not create new vehicle trips at the site driveways. Chapter 7 of the Trip Generation Handbook" is devoted to estimating trip generation for multi -use developments, and provides a methodology to estimate the number of internal trips that can be expected at specific types of sites. This method is based on the type and size of various land uses. The more balanced the mix of uses, the higher the percentage of internal trips. Developments with a predominance of one type of use (e.g., mostly office, or mostly residential) typically have lower percentages of internal trips. ITE's methodology to determine internal trips has four steps: 1. Determine the number of trips generated by each land use as if each was on a separate site. 2. Determine the number of internal trips from capture rates in the Trip Generation Handbook. 3. Balance the number of internal trips to and from all land uses at the site. 4. Subtract internal person trips based on the percentages determined. The Trip Generation Handbook provides internal trip capture percentages for retail, office, and residential uses for daily and PM peak hour conditions. These were applied to the person trip estimates for each development alternative. Using guidelines set forth in the Trip Generation " Ibid. - 14- February 28, 2012 Walgreens – Edmonds Way Transportation Impact Analysis r trans sortation 1nC. Handbook" about 10% of the daily trips and 10% of the PM peak hour trips generated by the proposed project are expected to be internal trips. Note, while internal trips would also be expected to occur between the proposed land uses and the PCC site, no reductions were assumed for the existing trips generated by the PCC site. This results in a conservatively high estimate of the total trips generated by the combined project and PCC sites. Table 4 summarizes the total internal and external person trips expected to be generated by the proposed project. Table 4. Total Person Trips Generated by Program Person Trip Summary Size Daily PM Peak Hour In Out Total Pharmacy/Drugstore w/Drive-Thru Window (LU 881) Drive-in Bank (LU 912) 14,490 sf 4,000 sf 1,530 710 90 90 180 62 62 124 152 152 304 Total Person Tris 2,240 Adjustment for Internal Person Trips Total External Person Tris -210 -15 -15 -30 137 137 274 2,030 Source: Heffron Transportation, Inc., February 2012. 3.2.3. Vehicle Trips To estimate the number of vehicle trips that would be generated by the project, the total number of external person trips (expected to be made in vehicles) was divided by the 1.20 AVO rate described previously. It is important to recognize that a portion of the site's vehicular driveway trips would not be new to the local area roadway network. For the proposed uses, the external trips would consist of two different types—pass-by and primary trips—that would affect local roadways differently. Each of these trip types is described as follows: ® Pass -by trips are attracted from roadways immediately adjacent to the site. For example, trips to the site made by drivers already using Edmonds Way or 100`" Avenue W past the site for trips home from work or other origins would be considered pass -by trips. ® Primary trips are single -purpose trips generated by the site. Primary trips are generally assumed to begin and end at home, although some new trips could originate at work or other locations. The proportions of these trip components were estimated using information in ITE's Trip Generation Handbook. The average pass -by trip percentages for Pharmacy/Drugstore with Drive -Through Window (Table 5.18) and Drive-in Bank (Table 5.20) were applied to those uses. The primary and pass -by trip percentages applied for the proposed uses are shown in Table 5. 12 Institute of Transportation Engineers [ITEO, 2 n Edition, June 2004. - 15 - February 28, 2012 Walgreens — Edmonds Way Transportation Impact Analysis Table 5. Primary and Pass -by Trip Percentages heffron trans" ortat�on rnc.i Trip Component Pharmacy/Drugstore 1 Drive -In Bank 2 Primary Trips 51% 53% Pass -by Trips 49% 47% 1. Percentages reflect average of pass -by trip percentage data presented in Table 5.18 in ITE's Trip Generation Handbook for Pharmacy/Drug Store with Drive -Through Window (Land Use 881), 2. Percentages reflect average of pass -by trip percentage data presented in Table 5.20 in ITE's Trip Generation Handbook for Drive -In Bank (Land Use 9121, All of the assumptions described above were used to determine the number of vehicle trips that would be generated by the proposed project and the net increase compared to existing conditions. Table 6 presents the daily and PM peak hour vehicular trips that would be generated by the proposed project. Table 6. Proposed Project's Vehicle Trip Generation Source: Heffron Transportation, Inc., February 2012. 1. Based on Trip Generation Handbook, 2nd Edition, June 2004. 3.2.4. Trip Generation for Existing Uses Trip generation estimates for the existing bowling alley on the project site were determined using ITE trip generation rates as described previously. However, since the existing use is a single development, no adjustments were made to account for internal trips. In addition, since a bowling alley tends to serve as a primary destination, ITE does not provide pass -by trip rates for this land use. The resulting trip estimates for the existing site use are presented in Table 7. - 16- February 28, 2012 PM Peak Hour Trips In Out Total % of Trips Daily Tris Proposed Land Use Walgreens (14,490 sf Primary Trips 51% 650 35 35 70 Pass -by Trips 49% 630 33 68 33 68 66 136 Total Tris 100% 1,280 Bank (4,000 so Primary Trips 53% 220 25 25 50 Pass -by Trips 47% 200 23 48 23 48 46 96 Total Tris 100% 420 Total Primary Trips 870 60 60 120 Total Pass -by Trips 830 56 56 112 1,700 Total Vehicle Trips - Proposed 116 116 232 Source: Heffron Transportation, Inc., February 2012. 1. Based on Trip Generation Handbook, 2nd Edition, June 2004. 3.2.4. Trip Generation for Existing Uses Trip generation estimates for the existing bowling alley on the project site were determined using ITE trip generation rates as described previously. However, since the existing use is a single development, no adjustments were made to account for internal trips. In addition, since a bowling alley tends to serve as a primary destination, ITE does not provide pass -by trip rates for this land use. The resulting trip estimates for the existing site use are presented in Table 7. - 16- February 28, 2012 Walgreens — Edmonds Way Transportation Impact Analysis Table 7. Existing Site Vehicle Trip Generation 3 =transportation. enc. Existing Land Use Size Daily Tris PM Peak Hour Trips In Out Total Bowling Alley 24,336 sf 810 30 56 86 Source: Heffron Transportation, Inc., February 2012. 3.2.5. Net Change in Site Trips The net change in vehicle trips within the site vicinity is calculated as the difference between existing and proposed conditions. Table 8 summarizes the total net change in traffic due to the project. As shown, the redevelopment is expected to result in a net increase of 890 total vehicle trips, but only 60 trips would be new to the local street system; 830 driveway trips would come from traffic already passing the site. Similarly, the project would result in a net increase of 146 PM peak hour driveway trips, but only 34 would be new primary trips on the local roadway network. The remaining 112 PM peak hour driveway trips would come from traffic already passing the site. Table 8. Net Change in Vehicular Trip Generation Source: Heffron Transportation, Inc., February 2012. - 17- February 28, 2012 PM Peak Hour Vehicle Trips In Out Total Land Use / Trip Component Size Daily Tris Proposed Walgreens and Bank 18,490 sf Total Primary Trips 870 60 60 120 Total Pass -by Trips 830 56 56 112 116 116 232 Total Vehicle Tris 1,700 Removed Bowling Alley 24,336 sf Total Primary Trips 810 30 56 86 Total Pass -by Trips 0 0 0 0 30 56 86 Total Vehicle Tris 810 Net Change Total Primary Trips 60 30 4 34 Total Pass -by Trips 830 56 56 112 86 60 146 Total Vehicle Tris 890 Source: Heffron Transportation, Inc., February 2012. - 17- February 28, 2012 Walgreens — Edmonds Way heffron Transportation Impact Analysis 3.3. Trip Distribution and Assignment The inbound and outbound trip distribution patterns for this project were derived from trip origin and destination data obtained from the City of Edmonds travel demand forecasting model. Data for Transportation Analysis Zone (TAZ) 35, the zone in which the project site is located, were used. Figure 8 shows the projected distribution of net new project trips throughout the study area, based on the referenced model data. The forecasted net changes in project -generated traffic were added to the 2014 and 2019 without - project traffic volumes to estimate future with -project traffic volumes. In 2014, the project is expected to increase the ADT on Edmonds Way from 20,800 to 20,840 vehicles, and on 100th Avenue W from 12,600 to 12,620 vehicles. The projected 2014 with -project PM peak hour volumes at the study intersections are shown on Figure 9. In 2019, the project is expected to increase the ADT on Edmonds Way from 22,100 to 22,140 vehicles, and on 100th Avenue W 13,400 to 13,420 vehicles. The projected 2019 with -project PM peak hour volumes at the study intersections are shown on Figure 10. - 18- February 28, 2012 2 2 ) (-9) (9 5 0 0 (9) r3 0 3 =9 WN (D LO C) 00 PCC 22% 22% A., (10) (12) 2 ' +_8(12) t- 8 ( 3 414*-- 3 (10) 4 , (-10) 2 (5) t5 (6) '\ (6) 0 4---11(-6) 0 (5) 2 F" (-5) 2 Traffic Signal 4-- XX Net New Primary Trips (XX) Net New Pass -By Trips Edmonds Walgreens Figure 8 NET NEW PROJECT TRIP Edmonds Way& 100th Avenue W DISTRIBUTION AND ASSIGNMENT PM PEAK HOUR N Not to Scale SW 224th Street SW Street SW -N 6 10 aql­ — Inbound Trip % Outbound Trip % rans or iAj on ind. Traffic Signal 4—XX PM Peak Hour Volume Edmonds Walgreens Figure 2014 -WITH -PROJECT TRAFFIC VOLUMES heffran Edmonds Way & 100th Avenue W PM PEAK HOUR 55 '115 15 312 � 4--60 X137 35 511150 6 5 i ' 54 X83 ` 14 400 L d--1 ,1 53 39---+ r► 3 ® 634 72 52 --i 62 ' 50 2701851+-230 ,--655 .41 � X161 66—x' �j ? f 678 1472143 180 235 29 t- 54 ®J 4--- 1017 1006 —�- LEGEND Traffic Signal --*--XX PM Peak Hour Volume PCC 26 37 40 4J ®®-1045 24----+ 982 15 X1123 0 ` <a-1057 �-5 1007---,� 0 5 5--+ 5 i N Not to Scale 220th Street SW 224th Street SW SW / 40 1�-- 80 5 e 965 1� � 1j-- 5 136 1 1 F 861—® 5 5 5 E A 'd _t gFigure 10 •�• JECT TRAFFIC VOLUMES heffron Edmonds Wa& I ON Avenue W PM PEAK HOUR I c :rnc C:) °' - l PCC 26 37 40 4J ®®-1045 24----+ 982 15 X1123 0 ` <a-1057 �-5 1007---,� 0 5 5--+ 5 i N Not to Scale 220th Street SW 224th Street SW SW / 40 1�-- 80 5 e 965 1� � 1j-- 5 136 1 1 F 861—® 5 5 5 E A 'd _t gFigure 10 •�• JECT TRAFFIC VOLUMES heffron Edmonds Wa& I ON Avenue W PM PEAK HOUR I c :rnc Walgreens - Edmonds Way heffron Transportation Impact Analysis • 3.4. Traffic Operations Table 9 shows the levels of service for study area intersections that were calculated for the 2014 and 2019 with -project conditions, using the methodologies described previously. Levels of service for without -project conditions are shown for comparison. As shown, the project is expected to add a small amount of delay at the study area intersections. However, it is not expected to degrade levels of service. All study area intersections (and unsignalized movements) are expected to operate at or better than the LOS D standard. Therefore, no mitigation would be required to accommodate the proposed project. Table 9. Level of Service Summary - 2014 & 2019 Without- and With -Project Conditions Source: Heffron Transportation, February 2012. All level of service analyses were performed using the Synchro 8.0 analysis software and methodology. 1. Level of service. 2. Average seconds of delay per vehicle. 3. Unsignalized intersection. Level of service is reported for the stop -controlled movements onto the main street and for the average overall intersection. 4. The center driveway at Edmonds Way currently has one outbound lane; it is proposed to be widened to provide two lanes (left -turn and right -turn) with the project. -22- February 28, 2012 2014 Conditions 2019 Conditions Without Project With Project Without Project I With Project LOS' Delay2 LOS Delay LOS Delay ' LOS Delay Signalized Intersections Edmonds Way / 100th Avenue W D 38.8: D 38.9 D 41.8 D 41.9 Edmonds Way / 95th Place W B 11.6 B 11.7 B 12.4 B 12.6 100th Avenue W / 220th Street SW B 16.1 i B 16.2 B I 16.8 B 17.0 Unsignalized Intersection3 i E Edmonds Way / East Driveway (overall) A 0.3 A 0.5 A 0.3 A 0.5 Northbound movement B 14.0 ' B 14.4 B 14.6 j B 14.9 Southbound movement B 12.8 B 13.4 B 13.0 € B 13.7 Edmonds Way /Center Driveway (overall) a A 0.4 ' A 0.6 A 0.3 A 0.6 Southbound movement (left and right turns) C 15.1 C 15.4 i Southbound left -turn movement --- C 17.5 --- --- C 18.1 Southbound right turn movement B 11.0 --- --- B 10.8 Edmonds Way / West Driveway (overall) A 0.2 1 A 0.2 A 0.1 A 0.2 Southbound movement B 12.5 1 B 12.6 B 12.9 ; B 13.0 100th Ave W / 100th Ave Driveway (overall) A 2.5 A 2.8 A i 2.4 A 2.7 Eastbound movement B 12.7 ' B 12.9 B 12.9 B 13.2 Westbound left -turn movement C 16.6: C 17.2 C 17.2 C 17.9 Westbound right -turn movement A 9.3 d A 9.4 A 9.4 A 9.5 Source: Heffron Transportation, February 2012. All level of service analyses were performed using the Synchro 8.0 analysis software and methodology. 1. Level of service. 2. Average seconds of delay per vehicle. 3. Unsignalized intersection. Level of service is reported for the stop -controlled movements onto the main street and for the average overall intersection. 4. The center driveway at Edmonds Way currently has one outbound lane; it is proposed to be widened to provide two lanes (left -turn and right -turn) with the project. -22- February 28, 2012 Walgreens — Edmonds Way Transportation Impact Analysis 3.5. Site Access and Sight Distance f y trans" ortatontrc.+ Intersection sight distance was assessed at the site driveways according to guidelines established by the American Associate of State Highway and Transportation Officials (AASHTO).13 AASHTO determines intersection sight distance (ISD) according to the following formula: ISD = 1.47 Vmajor ty Where, ISD = intersection sight distance (length of the leg of sight triangle along the major road) (feet) V,najor— design speed of major road (mph) tg_ time gap for minor road vehicle to enter the major road (seconds) Table 10 summarizes the design intersection sight distance for the study area roadways. Desired sight distance was calculated for passenger cars, which are expected to be the majority of vehicles accessing the site, and single unit trucks, which are expected to be used for deliveries to the site. As shown, the desired intersection sight distance to accommodate both passenger cars and delivery trucks is 510 feet on Edmonds Way, and 420 feet on 100"' Avenue W. Stopping sight distance (the distance needed for a vehicle traveling at the roadway design speed to stop before reaching a stationary object in its path) is about 250 feet for vehicles approaching the site driveways on Edmonds Way, and about 165 feet for vehicles approaching the site on 100"' Avenue W.14 Table 10. Design Intersection Sight Distance Source: Heffron Transportation, February 2012. 1. 8,9h percentile speed, as measured by the 24-hour machine counts on January 24 and 25, 2012. 2. Provided by AASHTO. For passenger cars, 7.5 seconds plus 0.5 seconds for each lane crossed greater than one. For single unit trucks, 9.5 seconds plus 0.7 seconds for each lane crossed greater than one. 3. ISD = 1.47 z Vmajor * Ig Sight distance along Edmonds Way is constrained by the horizontal curvature of the road; 100"' Avenue W has no topographical constraints in the site vicinity. Adequate stopping sight distance (greater than 400 feet) exists at all four driveways. Intersection sight distance at the four site driveways was measured as follows: 13 American Association of State Highway and Transportation Officials (AASHTO), Geometric Design of Highways and Streets, Fifth Edition, 2004. 14 Ibid. -23 - February 28, 2012 Vmajor (mph) I tg (seconds) 2 IS (feet) 3 Edmonds Way Passenger Car- Left Turn 34 8.0 400 Single Unit Truck - Left Turn 34 10.2 510 100th Avenue W Passenger Car - Left Turn 26 8.5 325 Single Unit Truck - Left Turn 26 10.9 420 Source: Heffron Transportation, February 2012. 1. 8,9h percentile speed, as measured by the 24-hour machine counts on January 24 and 25, 2012. 2. Provided by AASHTO. For passenger cars, 7.5 seconds plus 0.5 seconds for each lane crossed greater than one. For single unit trucks, 9.5 seconds plus 0.7 seconds for each lane crossed greater than one. 3. ISD = 1.47 z Vmajor * Ig Sight distance along Edmonds Way is constrained by the horizontal curvature of the road; 100"' Avenue W has no topographical constraints in the site vicinity. Adequate stopping sight distance (greater than 400 feet) exists at all four driveways. Intersection sight distance at the four site driveways was measured as follows: 13 American Association of State Highway and Transportation Officials (AASHTO), Geometric Design of Highways and Streets, Fifth Edition, 2004. 14 Ibid. -23 - February 28, 2012 Walgreens — Edmonds Way heffron Transportation Impact AnalysisMOW-10"'MOMOS • Edmonds Way east driveway — Sight distance to the east is approximately 460 feet, which exceeds the desired sight distance for passenger cars but not for single unit trucks. The sight distance provided is greater than the minimum stopping sight distance. Sight distance to the west exceeds 700 feet, extending past the Edmonds Way/100t" Avenue W intersection. ® Edmonds Way center driveway — Sight distance to the east is approximately 520 feet, which exceeds the desired sight distance for passenger cars and meets the desired distance for single unit trucks. Sight distance to the west exceeds 700 feet, extending past the Edmonds Way/100th Avenue W intersection. ® Edmonds Way west driveway — Since this driveway is restricted to right turns only (in and out), the left -turn sight distance is a conservative measure for this location. However, sight distance to the east is greater than 600 feet, which exceeds the desired sight distance for both passenger cars and single unit trucks. Sight distance to the west exceeds 600 feet, extending past the Edmonds Way/100t' Avenue W intersection. ® 100t' Avenue W driveway — Sight distance in both directions is greater than 600 feet; to the south this extends past the Edmonds Way/100t' Avenue W intersection. This exceeds the desired sight distance for both passenger cars and single unit trucks. Sight distance at all four site driveways exceed the desirable distance for passenger cars; it meets or exceeds the desirable sight distance for single unit trucks at all locations except the east driveway on Edmonds Way. Since minimum stopping sight distance also exists at all site access driveways, no adverse impacts to safety are expected. However, to avoid operational impacts associated with slower moving trucks entering the traffic stream, it is recommended that delivery trucks exiting the site utilize the center or west Edmonds Way driveways, or the 100t" Avenue W driveway. It is noted that trucks serving the existing PCC site likely already use these three driveways to exit the site. The project would maintain all existing driveway locations, and would improve the center and east driveways on Edmonds Way. Landscaping and frontage improvements would meet City standards and would not include obstacles to sight distance. Sight distance with the project would remain the same as it is under existing conditions. Therefore, no adverse sight distance impacts are anticipated at the site driveways with the project. 3.6. Queuing Vehicle queue estimates are also generated by the Synchro traffic operations models. Table 11 summarizes the calculated 50t" -percentile and 95"' -percentile queues for the traffic movements at the Edmonds Ways/100"i Avenue W intersection that are adjacent to the project site. Westbound queues on Edmonds Way extend eastward in the direction of the three Edmonds Way site driveways shared by the PCC and project sites. Southbound queues on l 00t" Avenue W extend northward in the direction of the 100t1i Avenue W site driveway. If queued vehicles extend past the site driveways, they can delay site -generated vehicles entering and exiting one or more driveways. Currently, the westbound 50t1i-percentile through -right queue and the 95t" -percentile left -turn queue extend past the west (right-in/right-out) site driveway on Edmonds Way. The data indicate that westbound queues on Edmonds Way do not typically extend past the center and east site driveways. The southbound 95t" -percentile left -turn queue currently extends past the site driveway on 100"' Avenue W. Field observation confirmed these findings. Westbound queues on Edmonds Way regularly extend past the west site driveway, and southbound queues in the left -turn lane on 100th -24- February 28, 2012 Walgreens — Edmonds Way heffron Transportation Impact Analysis NOW3118e • Avenue W occasionally extend past the site driveway on that roadway. However, it was observed that queues clear within each signal cycle, so drivers waiting do not typically need to wait long for the queues to clear. Queues do not typically extend past the other two driveways on Edmonds Way, so drivers may also opt to use these alternative access points. Table 11. Existing and Forecast Queues at Edmonds Way/100th Avenue W Traffic Movement 50th -Percentile Queue feet 95th -Percentile Queue feet Distance to Site Driveways Existing Conditions Westbound left turn 96 158 120 feet (west driveway) Westbound through -right 253 315 360 feet (center driveway) 570 feet (east driveway) Southbound left turn 110 208 160 feet Southbound through -right 92 135 2014 Conditions Westbound left turn 99 (without project) 163 (without project) 120 feet (west driveway) 101 (with project) 164 (with project) 360 feet (center driveway) Westbound through -right 261 (without project) 324 (without project) 570 feet (east driveway) 261 (with project) 324 (with project) Southbound left turn 120 (without project) 229 (without project) 160 feet 121 (with project) 229 (with project) Southbound through -right 96 (without project) 140 (without project) 96 (with project) 140 (with project) 2019 Conditions Westbound left turn 107 (without project) 173 (without project) 120 feet (west driveway) 108 (with project) 175 (with project) 360 feet (center driveway) Westbound through -right 285 (without project) 353 (without project) 570 feet (east driveway) 285 (with project) 353 (with project) Southbound left turn 130 (without project) 248 (without project) 160 feet 130 (with project) 248 (with project) Southbound through -right 103 (without project) 146 (without project) 103 (with project) 146 (with project) Source: Heffron Transportation, Inc., February 2012. For future conditions, Table 11 shows that the proposed project is expected to have negligible effect on typical queue lengths at the Edmonds Way/100t" Avenue W intersection. With or without the project, future traffic growth is expected to increase queue lengths on both Edmonds Way and 100"' Avenue W, but they are not expected to substantially change the driveway access patterns compared to existing conditions. Analysis shows that the westbound 95"' -percentile through -right queue on Edmonds Way could extend almost to the center site driveway in 2019, so it is possible that drivers using this driveway could occasionally need to wait for queues to clear. This type of pattern is commonly found in developed areas surrounding major intersections, and the project is not expected to affect overall queuing conditions near the site. Therefore, no adverse queuing impacts are anticipated at the site driveways under future with -project conditions. -25- February 28, 2012 Walgreens — Edmonds Way heffron Transportation Impact Analysis I• 3.7. Safety The project is expected to add vehicle trips to the surrounding street network, which could increase the potential for conflicts. However, historical collision data in the site vicinity do not indicate any unusual safety concerns, and the project is not expected to have an adverse impact on vehicular or non -motorized safety. 3.8. Parking Demand and Supply Edmonds Community Development Code (ECDC) requires that the project include a minimum parking supply of 1 space per 300 sf (or 48 spaces) for the Walgreens pharmacy and 1 space per 200 sf (or up to 20 spaces, depending on the size that is built) for the bank. The proposed project will provide eight spaces directly near the Walgreens building, 11 spaces directly near the bank, and 145 spaces in a shared parking lot with the PCC site, for a total of 164 parking spaces. The PCC site has an additional 75 spaces on its west side. Combined, the total site would have 239 parking spaces with the project. The parking areas can be accessed from any of the four driveways serving the site. Peak parking demand for the proposed project was determined using information from the Institute of Transportation Engineers (ITE) Parking Generation. 1' Based on the published ITE rates, the peak parking demand for the Walgreens would be 35 vehicles (2.39 vehicles per 1,000 sf); the peak parking demand for the bank would be 16 vehicles (4.00 vehicles per 1,000 sf). These totals do not reflect any adjustments for other modes of transportation (such as transit) or reductions for internal trips. In addition, the peak parking times for each of these types of uses is typically different. The Walgreens peak parking time is likely close to the PM peak hour (4:00 to 5:00 P.M. based parking accumulation data in Parking Generation) while the peak parking time for a bank is typically midday (10:00 A.M. to 2:00 P.M.). The estimated parking demand generated by the two new uses is expected to be accommodated by the proposed on-site parking supply. No off-site parking impacts are anticipated as a result of the proposed project. 3.9. Transit The proposed project is not estimated to generate a significant number of transit trips. However, any transit ridership would be considered positive, since fewer vehicles would be using the local roadway system. The routes serving this area could accommodate this additional ridership; therefore, the proposed change of use would not adversely affect transit in the site vicinity. 3.10. Non -Motorized Facilities As part of redevelopment, the project would provide frontage improvements along Edmonds Way that would include new sidewalks and landscaping. These improvements would enhance the non - motorized facilities and environment for pedestrians in the site vicinity. Therefore, the proposed change of use would not adversely affect non -motorized facilities in the site vicinity. 15 Institute of Transportation Engineers, Parking Generation, 4th Edition, 2010. -26- February 28, 2012 Walgreens — Edmonds Way Transportation Impact Analysis 4.1. Traffic Impact Fees 0a trarrs artat The City of Edmonds requires new developments and change -of -use developments to pay traffic impact fees, calculated from the Edmonds Road Impact Fee Rate Study Table 416 and as identified in ECDC Section 18.82.120. Impact fees are to be assessed based upon the road impact fee rates at the time of issuance of building permits. For a change -in -use; the impact fee shall be the applicable impact fee for the ITE land use of the new use, less an amount equal to the applicable impact for the ITE land use of the prior use established at the time the prior use was permitted. If the previous use was permitted prior to September 12, 2004, the 2004 Impact Fee Rate Table 4 shall be used. Not all of the land uses associated with the project site are listed on the Edmonds Road Impact Fee Rate Study Table 4. However, the Edmonds Road Impact Fee Rate Study Table 4 shows that the end cost of the impact fee is $1,049.41 per new trip with adjustments for trip length. Therefore, the primary trip generation estimates were used to calculate the impact fees for land use categories not included in the City's fee schedule. The proposed and existing primary trip generation was shown in Table 6 of this report. Table 12 summarizes the impact fee for this project, which is estimated to be $29,097. Table 12. Project Impact Fee Estimate ITE Code Land Use Per Unit Fee Rate Unit Total Proposed Land Use 881 Drugstore/Pharmacy with Drive -Through Window 1 $556.19 / trip 120 primary trips $66,743 912 Drive -In Bank 2 $7.00 / sf 4,000 sf $28,000 Existing Land Use 437 BowlingAlle 3 $763.33 I trip 86 primary trips -$65,646 Total Estimate Impact Fee 1 1 $29,097 Source: Heffron Transportation, Inc., February 2012. 1. This land use type is not included in the City's fee schedule. The per trip' impact fee was derived by multiplying the City's per trip fee of $1.049.41 by a trip length factor of 0.53 (assumed to be the same as Shopping Center). 2. Obtained directly from the 2009 impact fee rate table. 3. This land use type is not included in the City's fee schedule. Because the existing use was permitted prior to 2004, the 2004 impact fee rate table applies. The 'per trip' impact fee was derived by multiplying the City's per trip fee of $763.33 by a trip length factor of 1.00 (assumed to be the same as other recreational uses such as Golf Course). 4.2. Other Mitigation To avoid operational impacts associated with slower moving trucks entering the traffic stream at the east Edmonds Way driveway, it is recommended that delivery trucks exiting the site utilize the center or west Edmonds Way driveways, or the 100t" Avenue W driveway. 16 City of Edmonds, 2009 Impact Fee Rate Table, effective May 1, 2010. -27- February 28, 2012 Levels of service (LOS) are qualitative descriptions of traffic operating conditions. These levels of service are designated with letters ranging from LOS A, which is indicative of good operating condi- tions with little or no delay, to LOS F, which is indicative of stop -and -go conditions with frequent and lengthy delays. Levels of service for this analysis were developed using procedures presented in the Highway Capacity Manual (Transportation Research Board, 2010). Level of service for signalized intersections is defined in terms of delay. Delay can be a cause of driver discomfort, frustration, inefficient fuel consumption, and lost travel time. Specifically, level of service criteria are stated in terms of the average delay per vehicle in seconds. Delay is a complex measure and is dependent on a number of variables including: the quality of progression, cycle length, green ratio, and a volume -to -capacity ratio for the lane group or approach in question. Table A -I shows the level of service criteria for signalized intersections from the Highway Capacity Manual. Table A-1. Level of Service Criteria Level of Service Average Delay Per Vehicle A Less than 10.0 Seconds B 10.1 to 20.0 seconds C 20.1 to 35.0 seconds D 35.1 to 55.0 seconds E 55.1 to 80.0 seconds F Greater than 80.0 seconds Source: Transportation Research Board, Highway Capacity Manual, 2010. General Free flow Stable flow (slight delays) Stable flow (acceptable delays) Approaching unstable flow (tolerable delay— occasionally wait through more than one signal cycle before proceeding. Unstable flow (approaching intolerable delay) Forced flow lammed) For unsignalized intersections, level of service is based on the average delay per vehicle for each turning movement. The level of service for a two-way, stop -controlled intersection is determined by the computed or measured control delay and is defined for each minor movement. Delay is related to the availability of gaps in the main street's traffic flow, and the ability of a driver to enter or pass through those gaps. The delay at an all -way, stop -sign (AWSC) controlled intersection is based on saturation headways, departure headways, and service time using procedures in Chapter 17 — Unsignalized Intersections, Applications —AWSC Intersections of the Highway Capacity Manual 2010 (Transportation Research Board (TRB), 2010). Table A-2 shows the level of service criteria for unsignalized intersections from the Highway Capacity Manual. Table A-2. Level of Service Criteria for Unsignalized Intersections Average Delay Level of Service A Less than 10.0 B 10.1 to 15.0 C 15.1 to 25.0 D 25.1 to 35.0 E 35.1 to 50.0 F Greater than 50.0 Source: Transportation Research Board, Highway Capacity Manual, 2010. EXISTING CONDITIONS Edmonds Walgreens Existing 1 T 100th Ave W/9th Ave S & Elm Wy/220th St SW Lanes, Volumes, Timings Lane Grou EBL EBT EBR WBL WBT WBR NBL NBT Lane Configurations f' r NBR SBL SBT SBR Lane Configurations f' r 4 r 4 r 1 Volume (vph) 15 32 3 126 54 104 2 458 137 51 274 14 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 65 0 235 0 0 200 120 0 Storage Lanes 0 1 0 1 0 1 1 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 1.00 1.00 Frt 0.850 0.850 0.850 0.993 Flt Protected 0.985 0.966 0.950 Satd. Flow (prot) 0 1668 1439 0 1636 1439 0 1693 1439 1608 1679 0 Flt Permitted 0.985 0.966 0.999 0.322 Satd. Flow (perm) 0 1668 1439 0 1636 1439 0 1691 1439 545 1679 0 Right Turn on Red No Yes No No Satd. Flow (RTOR) 114 Link Speed (mph) 25 30 30 30 Link Distance (ft) 663 721 3020 811 Travel Time (s) 18.1 16.4 68.6 18.4 Confl. Peds. (#/hr) 1 1 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% Adj. Flow (vph) 16 35 3 138 59 114 2 503 151 56 301 15 Shared Lane Traffic (%) Lane Group Flow (vph) 0 51 3 0 197 114 0 505 151 56 316 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 50 50 50 50 50 50 50 50 50 50 50 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Split NA Prot Split NA Prot Perm NA Perm Perm NA Protected Phases 4 4 4 8 8 8 2 6 Permitted Phases 2 2 6 Detector Phase 4 4 4 8 8 8 2 2 2 6 6 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 5 Edmonds Walgreens Existing 17: 100th Ave W/9th Ave S & Elm M/220th St SW Lanes, Volumes, Timings --* f Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 21.0 21.0 21.0 21.0 21.0 21.0 21.0 21.0 21.0 25.0 25.0 Total Split (s) 21.0 21.0 21.0 21.0 21.0 21.0 33.0 33.0 33.0 33.0 33.0 Total Split (%) 28.0% 28.0% 28.0% 28.0% 28.0% 28.0% 44.0% 44.0% 44.0% 44.0% 44.0% Maximum Green (s) 16.0 16.0 16.0 16.0 16.0 16.0 28.0 28.0 28.0 28.0 28.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lead/Lag Lead -Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None None Min Min Min Min Min Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 15.0 15.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0 0 Act Effct Green (s) 10.5 10.5 14.2 14.2 26.2 26.2 26.2 26.2 Actuated g/C Ratio 0.20 0.20 0.26 0.26 0.49 0.49 0.49 0.49 v/c Ratio 0.16 0.01 0.45 0.24 0.61 0.22 0.21 0.39 Control Delay 24.4 23.7 22.9 6.4 16.7 11.8 13.9 12.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 24.4 23.7 22.9 6.4 16.7 11.8 13.9 12.9 LOS C C C A B B B B Approach Delay 24.4 16.8 15.5 13.1 Approach LOS C B B B Queue Length 50th (ft) 16 1 59 0 135 32 12 73 Queue Length 95th (ft) 47 8 128 35 271 75 40 152 Internal Link Dist (ft) 583 641 2940 731 Turn Bay Length (ft) 200 120 Base Capacity (vph) 606 523 595 596 1025 872 330 1018 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.08 0.01 0.33 0.19 0.49 0.17 0.17 0.31 Intersection Summa Area Type: CBD Cycle Length: 75 Actuated Cycle Length: 53.7 Natural Cycle: 70 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.61 Intersection Signal Delay: 15.5 Intersection LOS: B Intersection Capacity Utilization 71.3% ICU Level of Service C Analysis Period (min) 15 plits and Phases: 17: 100th Ave W/9th Ave S & Elm Wy/220th St SW t o2 o4 08 # 06 331 JAB Page 6 Edmonds Walgreens Existing 18: 100th Ave W & Edmonds Wy Lanes, Volumes, Timings Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 0 fiT tT +I Volume (vph) 61 618 159 145 600 211 205 423 128 163 248 47 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 Ped Bike Factor 1.00 1.00 0.99 1.00 Frt 0.969 0.961 0.965 0.976 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 3429 0 1787 3423 0 1787 3449 0 1787 3477 0 At Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1769 3429 0 1787 3423 0 1777 3449 0 1787 3477 0 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 35 35 30 30 Link Distance (ft) 801 262 706 259 Travel Time (s) 15.6 5.1 16.0 5.9 Confl. Peds. (#/hr) 1 1 6 6 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Heavy Vehicles (%) 2% 2% 2% 1% 1% 1% 1% 1% 1% 1% 1% 1% Adj. Flow (vph) 69 702 181 165 682 240 233 481 145 185 282 53 Shared Lane Traffic (%) Lane Group Flow (vph) 69 883 0 165 922 0 233 626 0 185 335 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 50 50 50 50 50 50 50 50 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.0 32.5 21.0 32.5 20.0 25.5 9.0 25.5 Total Split (s) 12.0 33.0 21.0 42.0 20.0 29.0 17.0 26.0 Total Split (%) 12.0% 33.0% 21.0% 42.0% 20.0% 29.0% 17.0% 26.0% 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 7 Edmonds Walgreens Existing 18: 100th Ave W & Edmonds Wy Lanes, Volumes, Timings Intersection Area Type: Other Cycle Length: 100 Actuated Cycle Length: 91.8 Natural Cycle: 100 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.82 Intersection Signal Delay: 37.1 Intersection LOS: D Intersection Capacity Utilization 68.3% ICU Level of Service C Analysis Period (min)15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 18: 100th Ave W & Edmonds Wy 01 I 02 03 A Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Maximum Green (s) 8.0 27.5 17.0 36.5 16.0 23.5 13.0 20.5 Yellow Time (s) 3.0 4.0 3.0 4.0 3.0 4.0 3.0 4.0 All -Red Time (s) 1.0 1.5 1.0 1.5 1.0 1.5 1.0 1.5 Lost Time Adjust (s) -1.0 -2.5 -1.0 -2.5 -1,0 -2.5 -1.0 -2.5 Total Lost Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None Min None Min None None None None Walk Time (s) 7.0 7.0 5.0 5.0 Flash Dont Walk (s) 20.0 20.0 15.0 15.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 8.5 28.7 14.3 37.0 15.8 23.3 13.3 20.8 Actuated g/C Ratio 0.09 0.31 0.16 0.40 0.17 0.25 0.14 0.23 v/c Ratio 0.42 0.82 0.59 0.67 0.76 0.71 0.71 0.43 Control Delay 50.7 38.0 46.5 26.7 54.6 37.1 56.1 33.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 50.7 38.0 46.5 26.7 54.6 37.1 56.1 33.2 LOS D D D C D D E C Approach Delay 38.9 29.7 41.9 41.4 Approach LOS D C D D Queue Length 50th (ft) 41 264 96 253 137 182 110 92 Queue Length 95th (ft) 85 #350 158 315 #248 245 #208 135 Internal Link Dist (ft) 721 182 626 179 Turn Bay Length (ft) Base Capacity (vph) 176 1138 356 1477 336 992 277 885 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.39 0.78 0.46 0.62 0.69 0.63 0.67 0.38 Intersection Area Type: Other Cycle Length: 100 Actuated Cycle Length: 91.8 Natural Cycle: 100 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.82 Intersection Signal Delay: 37.1 Intersection LOS: D Intersection Capacity Utilization 68.3% ICU Level of Service C Analysis Period (min)15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 18: 100th Ave W & Edmonds Wy 01 I 02 03 A m5 06 o7 o8 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 8 Edmonds Walgreens Existing 30: Driveway/95th PI . & Edmonds Wy Lanes, Volumes, Timings Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +T# +T r I '+ Volume (vph) 122 786 1 2 868 72 2 0 3 39 0 108 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 10 10 10 12 12 12 Storage Length (ft) 250 0 250 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 1 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 1.00 0.99 Frt 0.988 0.919 0.850 Flt Protected 0.950 0.950 0.980 0.950 Satd. Flow (prot) 1770 3539 0 1787 3531 0 0 1597 0 1787 1576 0 At Permitted 0.191 0.258 0.939 0.754 Satd. Flow (perm) 356 3539 0 485 3531 0 0 1529 0 1418 1576 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 26 3 125 Link Speed (mph) 35 35 15 15 Link Distance (ft) 1068 446 262 685 Travel Time (s) 20.8 8.7 11.9 31.1 Confl. Peds. (#/hr) 2 2 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Heavy Vehicles (%) 2% 2% 2% 1% 1 % 1 % 0% 0% 0% 1 % 1 % 1 % Adj. Flow (vph) 139 893 1 2 986 82 2 0 3 44 0 123 Shared Lane Traffic (%) Lane Group Flow (vph) 139 894 0 2 1068 0 0 5 0 44 123 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.09 1.09 1.09 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 2 1 2 1 2 Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (ft) 20 100 20 100 20 100 20 100 Trailing Detector (ft) 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 20 6 20 6 20 6 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 94 Detector 2 Size(ft) 6 6 6 6 Detector 2 Type CI+Ex CI+Ex CI+Ex CI+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 9 Edmonds Walgreens Existing 30: Driveway/95th P1. & Edmonds Wy Lanes, Volumes, Timings Intersection Area Type: Other Cycle Length: 60 Actuated Cycle Length: 49.5 Natural Cycle: 60 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.78 Intersection Signal Delay: 11.1 Intersection LOS: B Intersection Capacity Utilization 50.4% ICU Level of Service A 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 10 --* --t i- "- T r* Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 2 2 6 6 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 Total Split (s) 40.0 40.0 40.0 40.0 20.0 20.0 20.0 20.0 Total Split (%) 66.7% 66.7% 66.7% 66.7% 33.3% 33.3% 33.3% 33.3% Maximum Green (s) 36.0 36.0 36.0 36.0 16.0 16.0 16.0 16.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead -Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode Min Min Min Min Max Max Min Min Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 Act Effct Green (s) 24.7 24.7 24.7 24.7 16.5 16.5 16.5 Actuated g/C Ratio 0.50 0.50 0.50 0.50 0.33 0.33 0.33 v/c Ratio 0.78 0.51 0.01 0.60 0.01 0.09 0.20 Control Delay 42.0 8.8 5.0 9.6 12.8 15.9 5.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 42.0 8.8 5.0 9.6 12.8 15.9 5.1 LOS D A A A B B A Approach Delay 13.3 9.6 12.8 8.0 Approach LOS B A B A Queue Length 50th (ft) 29 78 0 97 0 8 0 Queue Length 95th (ft) #115 107 2 133 7 33 30 Internal Link Dist (ft) 988 366 182 605 Turn Bay Length (ft) 250 250 Base Capacity (vph) 268 2660 365 2661 513 474 610 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.52 0.34 0.01 0.40 0.01 0.09 0.20 Intersection Area Type: Other Cycle Length: 60 Actuated Cycle Length: 49.5 Natural Cycle: 60 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.78 Intersection Signal Delay: 11.1 Intersection LOS: B Intersection Capacity Utilization 50.4% ICU Level of Service A 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 10 Edmonds Walgreens Existing 30: Driveway/95th PI . & Edmonds Wy Lanes, Volumes, Timings Analysis Period (min)15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 30: Driveway/95th PI . & Edmonds Wy 1 02 m4 40� ; 06 08 2i�..: 1/24/2012 5:00 pm Synchro 7 - Report SAB Page 11 Edmonds Walgreens Existing 1: 100th Ave W & 100th Av Dwy HCM Unsignalized Intersection Capacity Analysis Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Vi T+ 0 Vii tT+ Volume (veh/h) 39 3 52 44 1 71 62 575 58 40 362 14 Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.89 0.89 0.89 0.98 0.98 0.98 Hourly flow rate (vph) 42 3 57 48 1 77 70 646 65 41 369 14 Pedestrians 3 1 2 1 Lane Width (ft) 10.0 10.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 4.0 Percent Blockage 0 0 0 0 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 259 pX, platoon unblocked 0.87 0.87 0.87 0.87 0.87 0.87 vC, conflicting volume 1002 1313 197 1145 1287 358 387 712 vC1, stage 1 conf vol 461 461 819 819 vC2, stage 2 conf vol 541 852 326 468 vCu, unblocked vol 700 1057 197 865 1028 0 387 366 tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 90 99 93 87 100 92 94 96 cM capacity (veh/h) 437 346 815 367 360 946 1173 1038 Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total 102 48 78 70 431 281 41 246 137 Volume Left 42 48 0 70 0 0 41 0 0 Volume Right 57 0 77 0 0 65 0 0 14 cSH 582 367 925 1173 1700 1700 1038 1700 1700 Volume to Capacity 0.18 0.13 0.08 0.06 0.25 0.17 0.04 0.14 0.08 Queue Length 95th (ft) 16 11 7 5 0 0 3 0 0 Control Delay (s) 12.5 16.3 9.3 8.3 0.0 0.0 8.6 0.0 0.0 Lane LOS B C A A A Approach Delay (s) 12.5 11.9 0.7 0.8 Approach LOS B B Intersection Summary Average Delay 2.6 Intersection Capacity Utilization 43.4% ICU Level of Service A Analysis Period (min) 15 1/24/2012 5:00 pm Synchro 7 - Report JAB Pagel Edmonds Walgreens Existing 2: Edmonds Wy & West Dwy HCM Unsignalized Intersection Capacity Analysis .11* k. Movement EBL EBT WBT WBR SBL SBR Lane Configurations EB 1 tt tl,� WB 2 if Volume (veh/h) 0 909 930 48 0 26 Sign Control 0 Free Free Stop 0 Grade 0 0% 0% 0% 28 Peak Hour Factor 0.77 0.77 0.97 0.97 0.93 0.93 Hourly flow rate (vph) 0 1181 959 49 0 28 Pedestrians 0 0 0 2 4 Lane Width (ft) 0.0 0.0 0.0 10.0 12.4 Walking Speed (ft/s) 4.0 B Percent Blockage 0.0 0.0 0 12.4 Right turn flare (veh) B Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 262 37.2% ICU Level of Service A pX, platoon unblocked 15 0.78 vC, conflicting volume 1010 1576 506 vC1, stage 1 conf vol 986 vC2, stage 2 conf vol 590 vCu, unblocked vol 1010 1176 506 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s) 5.8 tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 95 cM capacity (veh/h) 687 309 516 Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 Volume Total 590 590 639 369 28 Volume Left 0 0 0 0 0 Volume Right 0 0 0 49 28 cSH 1700 1700 1700 1700 516 Volume to Capacity 0.35 0.35 0.38 0.22 0.05 Queue Length 95th (ft) 0 0 0 0 4 Control Delay (s) 0.0 0.0 0.0 0.0 12.4 Lane LOS B Approach Delay (s) 0.0 0.0 12.4 Approach LOS B Intersection Summary Average Delay 0.2 Intersection Capacity Utilization 37.2% ICU Level of Service A Analysis Period (min) 15 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 2 Edmonds Walgreens Existing 3: Edmonds Wy & Center Dwy HCM Unsignalized Intersection Capacity Analysis 4•,. Movement EBL EBT WBT WBR SBL SBR Lane Configurations EB 1 tt 0 WB 1 WB 2 Volume (veh/h) 10 899 965 20 25 13 Sign Control 47 Free Free Stop 0 Grade 0 0% 0% 0% 0 Peak Hour Factor 0.77 0.77 0.97 0.97 0.81 0.81 Hourly flow rate (vph) 13 1168 995 21 31 16 Pedestrians 0.34 0.34 0.39 1 0.11 Lane Width (ft) 1 0 0 10.0 0 Walking Speed (ft/s) Control Delay (s) 10.0 0.0 4.0 0.0 Percent Blockage 14.9 Lane LOS B 0 Right turn flare (veh) B Approach Delay (s) 0.1 Median type 0.0 TWLTL TWLTL Approach LOS Median storage veh) 2 2 B Intersection Summary Upstream signal (ft) 528 1298 pX, platoon unblocked 0.92 0.4 0.83 0.92 vC, conflicting volume 1016 1616 509 vC1, stage 1 conf vol 15 1006 vC2, stage 2 conf vol 610 vCu, unblocked vol 854 931 305 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s) 5.8 tF (s) 2.2 3.5 3.3 p0 queue free % 98 91 98 cM capacity (veh/h) 727 344 644 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 SB 1 Volume Total 13 584 584 663 352 47 Volume Left 13 0 0 0 0 31 Volume Right 0 0 0 0 21 16 cSH 727 1700 1700 1700 1700 409 Volume to Capacity 0.02 0.34 0.34 0.39 0.21 0.11 Queue Length 95th (ft) 1 0 0 0 0 10 Control Delay (s) 10.0 0.0 0.0 0.0 0.0 14.9 Lane LOS B B Approach Delay (s) 0.1 0.0 14.9 Approach LOS B Intersection Summary Average Delay 0.4 Intersection Capacity Utilization 37.3% ICU Level of Service A Analysis Period (min) 15 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 3 Edmonds Walgreens Existing 4: Dwy/East Dwy & Edmonds Wy HCM Unsignalized Intersection Capacity Analysis 1/24/2012 5:00 pm Synchro 7 - Report SAB Page 4 i Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t'l +'+ Volume (veh/h) 0 919 5 5 963 0 5 0 5 10 0 17 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.77 0.77 0.77 0.97 0.97 0.97 0.68 0.68 0.68 0.68 0.68 0.68 Hourly flow rate (vph) 0 1194 6 5 993 0 7 0 7 15 0 25 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 758 1068 pX, platoon unblocked 0.88 0.81 0.87 0.87 0.81 0.87 0.87 0.88 vC, conflicting volume 993 1200 1728 2200 600 1607 2203 496 vC1, stage 1 cont vol 1197 1197 1003 1003 vC2, stage 2 conf vol 532 1003 604 1200 vCu, unblocked vol 728 772 926 1470 29 786 1474 166 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 100 99 97 100 99 95 100 97 cM capacity (veh/h) 776 683 284 265 845 323 262 756 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 SB 1 Volume Total 0 796 404 5 662 331 15 40 Volume Left 0 0 0 5 0 0 7 15 Volume Right 0 0 6 0 0 0 7 25 cSH 1700 1700 1700 683 1700 1700 425 505 Volume to Capacity 0.00 0.47 0.24 0.01 0.39 0.19 0.03 0.08 Queue Length 95th (ft) 0 0 0 1 0 0 3 6 Control Delay (s) 0.0 0.0 0.0 10.3 0.0 0.0 13.8 12.7 Lane LOS B B B Approach Delay (s) 0.0 0.1 13.8 12.7 Approach LOS B B Intersection Summary Average Delay 0.3 Intersection Capacity Utilization 36.6% ICU Level of Service A Analysis Period (min) 15 1/24/2012 5:00 pm Synchro 7 - Report SAB Page 4 • ��• • I • Edmonds Walgreens 2014 Without Project 17: 100th Ave W/9th Ave S & Elm Wy/220th St SW Lanes, Volumes, Timings Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations *' r 4 r 4 r I T Volume (vph) 15 35 5 130 55 105 5 480 140 50 290 15 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 65 0 235 0 0 200 120 0 Storage Lanes 0 1 0 1 0 1 1 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 1.00 1.00 Frt 0.850 0.850 0.850 0.993 Flt Protected 0.985 0.966 0.950 Satd. Flow (prot) 0 1668 1439 0 1636 1439 0 1693 1439 1608 1679 0 Flt Permitted 0.985 0.966 0.997 0.302 Satd. Flow (perm) 0 1668 1439 0 1636 1439 0 1688 1439 511 1679 0 Right Turn on Red No Yes No No Satd. Flow (RTOR) 115 Link Speed (mph) 25 30 30 30 Link Distance (ft) 663 721 3020 811 Travel Time (s) 18.1 16.4 68.6 18.4 Confl. Peds. (#/hr) 1 1 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% Adj. Flow (vph) 16 38 5 143 60 115 5 527 154 55 319 16 Shared Lane Traffic (%) Lane Group Flow (vph) 0 54 5 0 203 115 0 532 154 55 335 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 50 50 50 50 50 50 50 50 50 50 50 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Split NA Prot Split NA Prot Perm NA Perm Perm NA Protected Phases 4 4 4 8 8 8 2 6 Permitted Phases 2 2 6 Detector Phase 4 4 4 8 8 8 2 2 2 6 6 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 5 Edmonds Walgreens 2014 Without Project 17: 100th Ave W/9th Ave S & Elm W 20th St SW Lanes, Volumes, Timings Intersection Summa Area Type: CBD Cycle Length: 75 Actuated Cycle Length: 54.6 Natural Cycle: 70 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.64 Intersection Signal Delay: 16.1 Intersection LOS: B Intersection Capacity Utilization 70.7% ICU Level of Service C Analysis Period (min)15 Splits and Phases: 17: 100th Ave W/9th Ave S & Elm Wy/220th St SW m2 m4 7,8 4 ...;`. �. 2 a M. . " 06 JAB Page 6 r0. ./ Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 21.0 21.0 21.0 21.0 21.0 21.0 21.0 21.0 21.0 25.0 25.0 Total Split (s) 21.0 21.0 21.0 21.0 21.0 21.0 33.0 33.0 33.0 33.0 33.0 Total Split (%) 28.0% 28.0% 28.0% 28.0% 28.0% 28.0% 44.0% 44.0% 44.0% 44.0% 44.0% Maximum Green (s) 16.0 16.0 16.0 16.0 16.0 16.0 28.0 28.0 28.0 28.0 28.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lead/Lag Lead -Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None None Min Min Min Min Min Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 15.0 15.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0 0 Act Effct Green (s) 10.6 10.6 14.5 14.5 26.8 26.8 26.8 26.8 Actuated g/C Ratio 0.19 0.19 0.27 0.27 0.49 0.49 0.49 0.49 v/c Ratio 0.17 0.02 0.47 0.25 0.64 0.22 0.22 0.41 Control Delay 24.8 23.8 23.5 6.4 17.6 11.9 14.4 13.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 24.8 23.8 23.5 6.4 17.6 11.9 14.4 13.2 LOS C C C A B B B B Approach Delay 24.7 17.3 16.3 13.4 Approach LOS C B B B Queue Length 50th (ft) 18 2 64 0 148 33 12 80 Queue Length 95th (ft) 49 11 132 35 293 77 40 163 Internal Link Dist (ft) 583 641 2940 731 Turn Bay Length (ft) 200 120 Base Capacity (vph) 594 513 583 587 1003 855 304 997 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.09 0.01 0.35 0.20 0.53 0.18 0.18 0.34 Intersection Summa Area Type: CBD Cycle Length: 75 Actuated Cycle Length: 54.6 Natural Cycle: 70 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.64 Intersection Signal Delay: 16.1 Intersection LOS: B Intersection Capacity Utilization 70.7% ICU Level of Service C Analysis Period (min)15 Splits and Phases: 17: 100th Ave W/9th Ave S & Elm Wy/220th St SW m2 m4 7,8 4 ...;`. �. 2 a M. . " 06 JAB Page 6 Edmonds Walgreens 2014 Without Project 18: 100th Ave W & Edmonds Wy Lanes, Volumes, Timings Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Vii 0. tT 0 1 0 Volume (vph) 60 635 170 150 615 215 220 445 130 175 255 50 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 Ped Bike Factor 1.00 1.00 0.99 1.00 Frt 0.968 0.961 0.966 0.975 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 3426 0 1787 3423 0 1787 3453 0 1787 3473 0 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1769 3426 0 1787 3423 0 1777 3453 0 1787 3473 0 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 35 35 30 30 Link Distance (ft) 801 262 706 259 Travel Time (s) 15.6 5.1 16.0 5.9 Confl. Peds. (#/hr) 1 1 6 6 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Heavy Vehicles (%) 2% 2% 2% 1% 1% 1% 1% 1% 1% 1% 1% 1% Adj. Flow (vph) 68 722 193 170 699 244 250 506 148 199 290 57 Shared Lane Traffic (%) Lane Group Flow (vph) 68 915 0 170 943 0 250 654 0 199 347 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 50 50 50 50 50 50 50 50 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.0 32.5 21.0 32.5 20.0 25.5 9.0 25.5 Total Split (s) 12.0 33.0 21.0 42.0 20.0 29.0 17.0 26.0 Total Split (%) 12.0% 33.0% 21.0% 42.0% 20.0% 29.0% 17.0% 26.0% 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 7 Edmonds Walgreens 2014 Without Project 18: 100th Ave W & Edmonds Wy Lanes, Volumes, Timings Intersection Summa Area Type: Other Cycle Length: 100 Actuated Cycle Length: 93 Natural Cycle: 100 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.85 Intersection Signal Delay: 38.8 Intersection LOS: D Intersection Capacity Utilization 70.8% ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 18: 100th Ave W & Edmonds Wy 01 1 o2 'I m3 o4 17 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Maximum Green (s) 8.0 27.5 17.0 36.5 16.0 23.5 13.0 20.5 Yellow Time (s) 3.0 4.0 3.0 4.0 3.0 4.0 3.0 4.0 All -Red Time (s) 1.0 1.5 1.0 1.5 1.0 1.5 1.0 1.5 Lost Time Adjust (s) -1.0 -2.5 -1.0 -2.5 -1.0 -2,5 -1.0 -2.5 Total Lost Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None Min None Min None None None None Walk Time (s) 7.0 7.0 5.0 5.0 Flash Dont Walk (s) 20.0 20.0 15.0 15.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 8.5 29.1 14.6 37.6 16.3 23.7 13.5 21.0 Actuated g/C Ratio 0.09 0.31 0.16 0.40 0.18 0.25 0.15 0.23 v/c Ratio 0.42 0.85 0.61 0.68 0.80 0.74 0.77 0.44 Control Delay 51.0 40.3 47.2 27.2 58.4 38.3 60.5 33.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 51.0 40.3 47.2 27.2 58.4 38.3 60.5 33.8 LOS D D D C E D E C Approach Delay 41.0 30.2 43.9 43.5 Approach LOS D C D D Queue Length 50th (ft) 41 280 99 261 150 192 120 96 Queue Length 95th (ft) 84 #388 163 324 #274 257 #229 140 Internal Link Dist (ft) 721 182 626 179 Turn Bay Length (ft) Base Capacity (vph) 173 1117 349 1450 330 975 272 868 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.39 0.82 0.49 0.65 0.76 0.67 0.73 0.40 Intersection Summa Area Type: Other Cycle Length: 100 Actuated Cycle Length: 93 Natural Cycle: 100 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.85 Intersection Signal Delay: 38.8 Intersection LOS: D Intersection Capacity Utilization 70.8% ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 18: 100th Ave W & Edmonds Wy 01 1 o2 'I m3 o4 17 05 06 o7 o8 20 & 11012- 42, 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 8 Edmonds Walgreens 2014 Without Project 30: Driveway/95th PI . & Edmonds Wy Lanes, Volumes, Timings f". WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations "`' 'r Lane Group EBL EBT EBR WBL f". WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 0 0 4a I T Volume (vph) 125 810 5 5 900 75 5 5 5 40 5 110 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 10 10 10 12 12 12 Storage Length (ft) 250 0 250 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 1 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 1.00 0.99 Frt 0.999 0.988 0.955 0.857 Flt Protected 0.950 0.950 0.984 0.950 Satd. Flow (prot) 1770 3536 0 1787 3531 0 0 1666 0 1787 1590 0 Flt Permitted 0.180 0.248 0.934 0.746 Satd. Flow (perm) 335 3536 0 467 3531 0 0 1581 0 1403 1590 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 2 26 6 114 Link Speed (mph) 35 35 15 15 Link Distance (ft) 1068 446 262 685 Travel Time (s) 20.8 8.7 11.9 31.1 Confl. Peds. (#/hr) 2 2 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Heavy Vehicles (%) 2% 2% 2% 1 % 1 % 1 % 0% 0% 0% 1 % 1 % 1 % Adj. Flow (vph) 142 920 6 6 1023 85 6 6 6 45 6 125 Shared Lane Traffic (%) Lane Group Flow (vph) 142 926 0 6 1108 0 0 18 0 45 131 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.09 1.09 1.09 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 2 1 2 1 2 Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (ft) 20 100 20 100 20 100 20 100 Trailing Detector (ft) 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 20 6 20 6 20 6 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 94 Detector 2 Size(ft) 6 6 6 6 Detector 2 Type CI+Ex CI+Ex CI+Ex CI+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 9 Edmonds Walgreens 2014 Without Project 30: Driveway/95th PI . & Edmonds Wy Lanes, Volumes, Timings Intersection Summa Area Type: Other Cycle Length: 60 Actuated Cycle Length: 50.7 Natural Cycle: 60 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.83 Intersection Signal Delay: 11.6 Intersection LOS: B Intersection Capacity Utilization 51.9% ICU Level of Service A 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 10 '_* f 41 I f Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 2 2 6 6 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 Total Split (s) 40.0 40.0 40.0 40.0 20.0 20.0 20.0 20.0 Total Split (%) 66.7% 66.7% 66.7% 66,7% 33.3% 33.3% 33.3% 33.3% Maximum Green (s) 36.0 36.0 36.0 36.0 16.0 16.0 16.0 16.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1,0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead -Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode Min Min Min Min Max Max Min Min Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 Act Effct Green (s) 25.9 25.9 25.9 25.9 16.5 16.5 16.5 Actuated g/C Ratio 0.51 0.51 0.51 0.51 0.33 0.33 0.33 v/c Ratio 0.83 0.51 0.03 0.61 0.03 0.10 0.22 Control Delay 50.1 8.7 5.4 9.5 13.6 16.4 6.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 50.1 8.7 5.4 9.5 13.6 16.4 6.6 LOS D A A A B B A Approach Delay 14.2 9.5 13.6 9.1 Approach LOS B A B A Queue Length 50th (ft) 31 82 1 103 2 9 4 Queue Length 95th (ft) #123 112 5 140 16 33 37 Internal Link Dist (ft) 988 366 182 605 Turn Bay Length (ft) 250 250 Base Capacity (vph) 246 2591 342 2594 519 457 595 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.58 0.36 0.02 0.43 0.03 0.10 0.22 Intersection Summa Area Type: Other Cycle Length: 60 Actuated Cycle Length: 50.7 Natural Cycle: 60 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.83 Intersection Signal Delay: 11.6 Intersection LOS: B Intersection Capacity Utilization 51.9% ICU Level of Service A 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 10 Edmonds Walgreens 2014 Without Project 30: Driveway/95th PI . & Edmonds Wy Lanes, Volumes, Timings Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. 1/24/2012 5:00 pm JAB Synchro 7 - Report Page 11 Edmonds Walgreens 2014 Without Project 1: 100th Ave W & 100th Av Dwy HCM Unsignalized Intersection Capacity Analysis 1/24/2012 5:00 pm Synchro 7 - Report JAB Pagel Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4+ T 0 tll� Volume (veh/h) 39 3 52 44 1 71 62 600 58 40 384 14 Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.89 0.89 0.89 0.98 0.98 0.98 Hourly flow rate (vph) 42 3 57 48 1 77 70 674 65 41 392 14 Pedestrians 3 1 2 1 Lane Width (ft) 10.0 10.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 4,0 Percent Blockage 0 0 0 0 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 259 pX, platoon unblocked 0.86 0.86 0.86 0.86 0.86 0.86 vC, conflicting volume 1039 1363 208 1185 1338 372 409 740 vC1, stage 1 conf vol 484 484 847 847 vC2, stage 2 conf vol 555 880 338 491 vCu, unblocked vol 714 1092 208 884 1062 0 409 366 tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 90 99 93 87 100 92 94 96 cM capacity (veh/h) 430 338 801 359 350 934 1151 1026 Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total 102 48 78 70 449 290 41 261 145 Volume Left 42 48 0 70 0 0 41 0 0 Volume Right 57 0 77 0 0 65 0 0 14 cSH 571 359 913 1151 1700 1700 1026 1700 1700 Volume to Capacity 0.18 0.13 0.09 0.06 0.26 0.17 0.04 0.15 0.09 Queue Length 95th (ft) 16 11 7 5 0 0 3 0 0 Control Delay (s) 12.7 16.6 9.3 8.3 0.0 0.0 8.7 0.0 0.0 Lane LOS B C A A A Approach Delay (s) 12.7 12.1 0.7 0.8 Approach LOS B B Intersection Summary Average Delay 2.5 Intersection Capacity Utilization 44.1% ICU Level of Service A Analysis Period (min) 15 1/24/2012 5:00 pm Synchro 7 - Report JAB Pagel Edmonds Walgreens 2014 Without Project 2: Edmonds Wy & West Dwy HCM Unsignalized Intersection Capacity Analysis 'A Movement EBL EBT WBT WBR SBL SBR Lane Configurations tt 0 r Volume (veh/h) 0 940 954 48 0 26 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.77 0.77 0.97 0.97 0.93 0.93 Hourly flow rate (vph) 0 1221 984 49 0 28 Pedestrians 2 Lane Width (ft) 10.0 Walking Speed (fUs) 4.0 Percent Blockage 0 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 262 pX, platoon unblocked 0.77 vC, conflicting volume 1035 1621 518 vC1, stage 1 conf vol 1010 vC2, stage 2 conf vol 610 vCu, unblocked vol 1035 1207 518 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s) 5.8 tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 94 cM capacity (veh/h) 672 299 507 Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 Volume Total 610 610 656 377 28 Volume Left 0 0 0 0 0 Volume Right 0 0 0 49 28 cSH 1700 1700 1700 1700 507 Volume to Capacity 0.36 0.36 0.39 0.22 0.06 Queue Length 95th (ft) 0 0 0 0 4 Control Delay (s) 0.0 0.0 0.0 0.0 12,5 Lane LOS B Approach Delay (s) 0.0 0.0 12.5 Approach LOS B Intersection Summary Average Delay 0.2 Intersection Capacity Utilization 37.9% ICU Level of Service A Analysis Period (min) 15 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 2 Edmonds Walgreens 2014 Without Project 3: Edmonds Wy & Center Dwy HCM Unsignalized Intersection Capacity Analysis 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 3 Movement EBL EBT WBT WBR SBL SBR Lane Configurations tt t1q, Volume (veh/h) 10 930 989 20 25 13 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.77 0.77 0.97 0.97 0.81 0.81 Hourly flow rate (vph) 13 1208 1020 21 31 16 Pedestrians 1 Lane Width (ft) 10.0 Walking Speed (ft/s) 4.0 Percent Blockage 0 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 528 1298 pX, platoon unblocked 0.92 0.83 0.92 vC, conflicting volume 1041 1661 521 vC1, stage 1 conf vol 1031 vC2, stage 2 conf vol 630 vCu, unblocked vol 862 922 295 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s) 5.8 tF (s) 2.2 3.5 3.3 p0 queue free % 98 91 98 cM capacity (veh/h) 716 338 648 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 SB 1 Volume Total 13 604 604 680 360 47 Volume Left 13 0 0 0 0 31 Volume Right 0 0 0 0 21 16 cSH 716 1700 1700 1700 1700 404 Volume to Capacity 0.02 0.36 0.36 0.40 0.21 0.12 Queue Length 95th (ft) 1 0 0 0 0 10 Control Delay (s) 10.1 0.0 0.0 0.0 0.0 15.1 Lane LOS B C Approach Delay (s) 0.1 0.0 15.1 Approach LOS C Intersection Summary Average Delay 0.4 Intersection Capacity Utilization 38.0% ICU Level of Service A Analysis Period (min) 15 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 3 Edmonds Walgreens 2014 Without Project 4: Dwy/East Dwy & Edmonds!A11 HCM Unsignalized Intersection Capacity Analysis N* Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 0 Vi tT +T+ Volume (veh/h) 0 950 5 5 987 0 5 0 5 10 0 17 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.77 0.77 0.77 0.97 0.97 0.97 0.68 0.68 0.68 0.68 0.68 0.68 Hourly flow rate (vph) 0 1234 6 5 1018 0 7 0 7 15 0 25 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 758 1068 pX, platoon unblocked 0.88 0.80 0.86 0.86 0.80 0.86 0.86 0.88 vC, conflicting volume 1018 1240 1781 2265 620 1652 2268 509 vC1, stage 1 cont vol 1237 1237 1028 1028 vC2, stage 2 conf vol 544 1028 624 1240 vCu, unblocked vol 738 790 931 1495 11 781 1499 157 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 100 99 97 100 99 95 100 97 cM capacity (veh/h) 763 663 273 257 855 316 254 759 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 SB 1 Volume Total 0 823 418 5 678 339 15 40 Volume Left 0 0 0 5 0 0 7 15 Volume Right 0 0 6 0 0 0 7 25 cSH 1700 1700 1700 663 1700 1700 414 500 Volume to Capacity 0.00 0.48 0.25 0.01 0.40 0.20 0.04 0.08 Queue Length 95th (ft) 0 0 0 1 0 0 3 6 Control Delay (s) 0.0 0.0 0.0 10.5 0.0 0.0 14.0 12.8 Lane LOS B B B Approach Delay (s) 0.0 0.1 14.0 12.8 Approach LOS B B Intersection Summary Average Delay 0.3 Intersection Capacity Utilization 37.3% ICU Level of Service A Analysis Period (min) 15 1124/2012 5:00 pm Synchro 7 - Report JAB Page 4 Edmonds Walgreens 2019 Without Project 17: 100th Ave W/9th Ave S & Elm M/220th St SW Lanes, Volumes, Timings - -,V- `0� Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4 r 4 r 4 r T Volume (vph) 15 35 5 135 60 115 5 510 150 55 310 15 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 65 0 235 0 0 200 120 0 Storage Lanes 0 1 0 1 0 1 1 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 1.00 1.00 Frt 0.850 0.850 0.850 0.993 Flt Protected 0.985 0.967 0.950 Satd. Flow (prot) 0 1668 1439 0 1637 1439 0 1693 1439 1608 1680 0 Flt Permitted 0.985 0.967 0.997 0.274 Satd. Flow (perm) 0 1668 1439 0 1637 1439 0 1688 1439 464 1680 0 Right Turn on Red No Yes No No Said. Flow (RTOR) 126 Link Speed (mph) 25 30 30 30 Link Distance (ft) 663 721 3020 811 Travel Time (s) 18.1 16.4 68.6 18.4 Confl. Peds. (#/hr) 1 1 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% Adj. Flow (vph) 16 38 5 148 66 126 5 560 165 60 341 16 Shared Lane Traffic (%) Lane Group Flow (vph) 0 54 5 0 214 126 0 565 165 60 357 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 50 50 50 50 50 50 50 50 50 50 50 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Split NA Prot Split NA Prot Perm NA Perm Perm NA Protected Phases 4 4 4 8 8 8 2 6 Permitted Phases 2 2 6 Detector Phase 4 4 4 8 8 8 2 2 2 6 6 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 5 Edmonds Walgreens 2019 Without Project 17: 100th Ave W/9th Ave S & Elm M/220th St SW Lanes, Volumes, Timings Intersection Summa Area Type: CBD Cycle Length: 75 Actuated Cycle Length: 55.4 Natural Cycle: 70 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.68 Intersection Signal Delay: 16.8 Intersection LOS: B Intersection Capacity Utilization 75.9% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. I-* *` *--- 4-_ 4\ I /P` \► i Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 21.0 21.0 21.0 21.0 21.0 21.0 21.0 21.0 21.0 25.0 25.0 Total Split (s) 21.0 21.0 21.0 21.0 21.0 21.0 33.0 33.0 33.0 33.0 33.0 Total Split (%) 28.0% 28.0% 28.0% 28.0% 28.0% 28.0% 44.0% 44.0% 44.0% 44.0% 44.0% Maximum Green (s) 16.0 16.0 16.0 16.0 16.0 16.0 28.0 28.0 28.0 28.0 28.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lead/Lag Lead -Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None None Min Min Min Min Min Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 15.0 15.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0 0 Act Effct Green (s) 10.6 10.6 14.8 14.8 27.3 27.3 27.3 27.3 Actuated g/C Ratio 0.19 0.19 0.27 0.27 0.49 0.49 0.49 0.49 v/c Ratio 0.17 0.02 0.49 0.26 0.68 0.23 0.26 0.43 Control Delay 25.2 24.0 24.2 6.3 19.1 12.0 15.7 13.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 25.2 24.0 24.2 6.3 19.1 12.0 15.7 13.6 LOS C C C A B B B B Approach Delay 25.1 17.6 17.5 13.9 Approach LOS C B B B Queue Length 50th (ft) 19 2 73 0 165 36 13 88 Queue Length 95th (ft) 49 11 139 36 #359 82 45 175 Internal Link Dist (ft) 583 641 2940 731 Turn Bay Length (ft) 200 120 Base Capacity (vph) 586 505 575 587 988 842 272 983 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.09 0.01 0.37 0.21 0.57 0.20 0.22 0.36 Intersection Summa Area Type: CBD Cycle Length: 75 Actuated Cycle Length: 55.4 Natural Cycle: 70 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.68 Intersection Signal Delay: 16.8 Intersection LOS: B Intersection Capacity Utilization 75.9% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Edmonds Walgreens 2019 Without Project 18: 100th Ave W & Edmonds Wy Lanes, Volumes, Timings --* f- Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +14, tT 0 1 Tl,� Volume (vph) 65 675 180 160 655 230 235 470 140 185 270 50 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 Ped Bike Factor 1.00 1.00 0.99 1.00 Frt 0.968 0.961 0.966 0.977 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 3426 0 1787 3423 0 1787 3453 0 1787 3481 0 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1769 3426 0 1787 3423 0 1777 3453 0 1787 3481 0 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 35 35 30 30 Link Distance (ft) 801 262 706 259 Travel Time (s) 15.6 5.1 16.0 5.9 Confl. Peds. (#/hr) 1 1 6 6 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Heavy Vehicles (%) 2% 2% 2% 1% 1% 1% 1% 1% I% 1% 1% 1% Adj. Flow (vph) 74 767 205 182 744 261 267 534 159 210 307 57 Shared Lane Traffic (%) Lane Group Flow (vph) 74 972 0 182 1005 0 267 693 0 210 364 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 50 50 50 50 50 50 50 50 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.0 32.5 21.0 32.5 20.0 25.5 9.0 25.5 Total Split (s) 12.0 33.0 21.0 42.0 20.0 29.0 17.0 26.0 Total Split (%) 12.0% 33.0% 21.0% 42.0% 20.0% 29.0% 17.0% 26.0% 1/24/2012 5:00 pm Synchro 7 - Report SAB Page 7 Edmonds Walgreens 2019 Without Project 18: 100th Ave W & Edmonds Wy Lanes, Volumes, Timings Intersection Summa Area Type: Other Cycle Length: 100 Actuated Cycle Length: 95.2 Natural Cycle: 100 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.90 Intersection Signal Delay: 41.8 Intersection LOS: D Intersection Capacity Utilization 74.3% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 18: 100th Ave W & Edmonds Wy 01 t o2 T m3 o4 l 05 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Maximum Green (s) 8.0 27.5 17.0 36.5 16.0 23.5 13.0 20.5 Yellow Time (s) 3.0 4.0 3.0 4.0 3.0 4.0 3.0 4.0 All -Red Time (s) 1.0 1.5 1.0 1.5 1.0 1.5 1.0 1.5 Lost Time Adjust (s) -1.0 -2.5 -1.0 -2.5 -1.0 -2.5 -1.0 -2.5 Total Lost Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None Min None Min None None None None Walk Time (s) 7.0 7.0 5.0 5.0 Flash Dont Walk (s) 20.0 20.0 15.0 15.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 8.5 29.9 15.1 38.7 16.6 24.5 13.7 21.6 Actuated g/C Ratio 0.09 0.31 0.16 0.41 0.17 0.26 0.14 0.23 v/c Ratio 0.47 0.90 0.64 0.72 0.86 0.78 0.82 0.46 Control Delay 53.1 45.2 49.1 28.6 65.5 40.3 66.1 34.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 53.1 45.2 49.1 28.6 65.5 40.3 66.1 34.4 LOS D D D C E D E C Approach Delay 45.7 31.8 47.3 46.0 Approach LOS D C D D Queue Length 50th (ft) 45 308 107 285 164 210 130 103 Queue Length 95th (ft) 90 #430 173 353 #300 275 #248 146 Internal Link Dist (ft) 721 182 626 179 Turn Bay Length (ft) Base Capacity (vph) 168 1086 340 1433 321 947 264 845 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.44 0.90 0.54 0.70 0.83 0.73 0.80 0.43 Intersection Summa Area Type: Other Cycle Length: 100 Actuated Cycle Length: 95.2 Natural Cycle: 100 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.90 Intersection Signal Delay: 41.8 Intersection LOS: D Intersection Capacity Utilization 74.3% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 18: 100th Ave W & Edmonds Wy 01 t o2 T m3 o4 l 05 06 o7 08 2Cts�.�.. , . 2 t2:4 42s s. \ .. 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 8 Edmonds Walgreens 2019 Without Project 30: Driveway/95th PI . & Edmonds Wy Lanes, Volumes, Timings --v - 41 t /0' 1'0� Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 0 Vi 0 I T Volume (vph) 135 860 5 5 955 80 5 5 5 40 5 115 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 10 10 10 12 12 12 Storage Length (ft) 250 0 250 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 1 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 1.00 0.99 Fri: 0.999 0.988 0.955 0.857 Flt Protected 0.950 0.950 0.984 0.950 Satd. Flow (prot) 1770 3536 0 1787 3531 0 0 1666 0 1787 1590 0 Flt Permitted 0.168 0.233 0.932 0.746 Satd. Flow (perm) 313 3536 0 438 3531 0 0 1577 0 1403 1590 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 2 26 6 99 Link Speed (mph) 35 35 15 15 Link Distance (ft) 1068 446 262 685 Travel Time (s) 20.8 8.7 11.9 31.1 Confl. Peds. (#/hr) 2 2 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Heavy Vehicles (%) 2% 2% 2% 1% 1% 1% 0% 0% 0% 1% 1% 1% Adj. Flow (vph) 153 977 6 6 1085 91 6 6 6 45 6 131 Shared Lane Traffic (%) Lane Group Flow (vph) 153 983 0 6 1176 0 0 18 0 45 137 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.09 1.09 1.09 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 2 1 2 1 2 Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (ft) 20 100 20 100 20 100 20 100 Trailing Detector (ft) 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 20 6 20 6 20 6 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 94 Detector 2 Size(ft) 6 6 6 6 Detector 2 Type CI+Ex CI+Ex CI+Ex CI+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 9 Edmonds Walgreens 2019 Without Project 30: Driveway/95th PI . & Edmonds Wy Lanes, Volumes, Timings Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 2 2 6 6 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 Total Split (s) 40.0 40.0 40.0 40.0 20.0 20.0 20.0 20.0 Total Split (%) 66.7% 66.7% 66.7% 66.7% 33.3% 33.3% 33.3% 33.3% Maximum Green (s) 36.0 36.0 36.0 36.0 16.0 16.0 16.0 16.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead -Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode Min Min Min Min Max Max Min Min Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 Act Effct Green (s) 29.1 29.1 29.1 29.1 16.4 16.4 16.4 Actuated g/C Ratio 0.54 0.54 0.54 0.54 0.30 0.30 0.30 v/c Ratio 0.90 0.51 0.03 0.61 0.04 0.10 0.25 Control Delay 64.9 8.4 5.2 9.3 14.1 17.3 8.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 64.9 8.4 5.2 9.3 14.1 17.3 8.4 LOS E A A A B B A Approach Delay 16.0 9.3 14.1 10.6 Approach LOS B A B B Queue Length 50th (ft) 38 89 1 112 3 12 10 Queue Length 95th (ft) #140 122 4 152 16 33 45 Internal Link Dist (ft) 988 366 182 605 Turn Bay Length (ft) 250 250 Base Capacity (vph) 215 2432 301 2436 486 429 555 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.71 0.40 0.02 0.48 0.04 0.10 0.25 Intersection Summary Area Type: Other Cycle Length: 60 Actuated Cycle Length: 53.8 Natural Cycle: 60 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.90 Intersection Signal Delay: 12.4 Intersection LOS: B Intersection Capacity Utilization 54.4% ICU Level of Service A 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 10 Edmonds Walgreens 2019 Without Project 30: Driveway/95th PI . & Edmonds Wy Lanes, Volumes, Timings Analysis Period (min)15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 30: Drivewavl95th PI . & Edmonds Wv m2 04 20 �< 06 08 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 11 Edmonds Walgreens TWLTL 2019 Without Project 1: 100th Ave W & 100th Av Dwy Median storage veh) HCM Unsignalized Intersection Capacity Analysis --* 2 4-- 1 ./ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations i 0.84 vC, conflicting volume T* 1439 221 tT Vii fl� 435 Volume (veh/h) 39 3 52 44 1 71 62 645 58 40 409 14 Sign Control Stop 580 930 Stop 350 516 Free Free Grade vCu, unblocked vol 0% 1151 221 0% 1121 0 0% 0% 383 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.89 0.89 0.89 0.98 0.98 0.98 Hourly flow rate (vph) 42 3 57 48 1 77 70 725 65 41 417 14 Pedestrians 3.3 3 4.0 3.3 1 2 p0 queue free % 1 99 Lane Width (ft) 86 10.0 92 94 10.0 96 12.0 418 12.0 786 Walking Speed (ft/s) 335 4.0 1126 4.0 995 Direction, Lane # 4.0 WB 1 4.0 NB 1 Percent Blockage NB 3 0 SB 2 SB 3 0 Volume Total 102 0 78 0 483 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 259 pX, platoon unblocked 0.84 0.84 0.84 0.84 0.84 0.84 vC, conflicting volume 1090 1439 221 1248 1414 397 435 791 vC1, stage 1 conf vol 509 509 898 898 vC2, stage 2 conf vol 580 930 350 516 vCu, unblocked vol 737 1151 221 925 1121 0 435 383 tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 90 99 93 86 100 92 94 96 cM capacity (veh/h) 418 323 786 344 335 919 1126 995 Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total 102 48 78 70 483 307 41 278 153 Volume Left 42 48 0 70 0 0 41 0 0 Volume Right 57 0 77 0 0 65 0 0 14 cSH 557 344 898 1126 1700 1700 995 1700 1700 Volume to Capacity 0.18 0.14 0.09 0.06 0.28 0.18 0.04 0.16 0.09 Queue Length 95th (ft) 17 12 7 5 0 0 3 0 0 Control Delay (s) 12.9 17.2 9.4 8.4 0.0 0.0 8.8 0.0 0.0 Lane LOS B C A A A Approach Delay (s) 12.9 12.3 0.7 0.8 Approach LOS B B Intersection Summary Average Delay 2.4 Intersection Capacity Utilization 45.4% ICU Level of Service A Analysis Period (min) 15 1/24/2012 5:00 pm Synchro 7 - Report JAB Pagel Edmonds Walgreens 2019 Without Project 2: Edmonds Wy & West Dwy HCM Unsignalized Intersection Capacity Analysis 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 2 ` *-, \1� 4/ Movement EBL EBT WBT WBR SBL SBR Lane Configurations tt 0 r Volume (veh/h) 0 1000 1019 48 0 26 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.77 0.77 0.97 0.97 0.93 0.93 Hourly flow rate (vph) 0 1299 1051 49 0 28 Pedestrians 2 Lane Width (ft) 10.0 Walking Speed (ft/s) 4.0 Percent Blockage 0 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 262 pX, platoon unblocked 0.75 vC, conflicting volume 1102 1727 552 vC1, stage 1 conf vol 1077 vC2, stage 2 conf vol 649 vCu, unblocked vol 1102 1296 552 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s) 5.8 tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 94 cM capacity (veh/h) 634 276 482 Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 Volume Total 649 649 700 400 28 Volume Left 0 0 0 0 0 Volume Right 0 0 0 49 28 cSH 1700 1700 1700 1700 482 Volume to Capacity 0.38 0.38 0.41 0.24 0.06 Queue Length 95th (ft) 0 0 0 0 5 Control Delay (s) 0.0 0.0 0.0 0.0 12.9 Lane LOS B Approach Delay (s) 0.0 0.0 12.9 Approach LOS B Intersection Summary Average Delay 0.1 Intersection Capacity Utilization 39.7% ICU Level of Service A Analysis Period (min) 15 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 2 Edmonds Walgreens 2019 Without Project 3: Edmonds Wy & Center Dwy HCM Unsignalized Intersection Capacity Analysis k, Movement EBL EBT WBT WBR SBL SBR Lane Configurations tt tli� Volume (veh/h) 10 990 1054 20 25 13 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.77 0.77 0.97 0.97 0.81 0.81 Hourly flow rate (vph) 13 1286 1087 21 31 16 Pedestrians 1 Lane Width (ft) 10.0 Walking Speed (ft/s) 4.0 Percent Blockage 0 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 528 1298 pX, platoon unblocked 0.89 0.82 0.89 vC, conflicting volume 1108 1767 555 vC1, stage 1 conf vol 1098 vC2, stage 2 conf vol 669 vCu, unblocked vol 876 886 254 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s) 5.8 tF (s) 2.2 3.5 3.3 p0 queue free % 98 91 98 cM capacity (veh/h) 688 325 669 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 SB 1 Volume Total 13 643 643 724 383 47 Volume Left 13 0 0 0 0 31 Volume Right 0 0 0 0 21 16 cSH 688 1700 1700 1700 1700 394 Volume to Capacity 0.02 0.38 0.38 0.43 0.23 0.12 Queue Length 95th (ft) 1 0 0 0 0 10 Control Delay (s) 10.3 0.0 0.0 0.0 0.0 15.4 Lane LOS B C Approach Delay (s) 0.1 0.0 15.4 Approach LOS C Intersection Summary Average Delay 0.3 Intersection Capacity Utilization 39.8% ICU Level of Service A Analysis Period (min) 15 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 3 Edmonds Walgreens 2019 Without Project 4: Dwy/East Dwy & Edmonds Wy HCM Unsignalized Intersection Capacity Analysis ♦ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +'3 tT 4 Volume (veh/h) 0 1010 5 5 1052 0 5 0 5 10 0 17 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.77 0.77 0.77 0.97 0.97 0.97 0.68 0.68 0.68 0.68 0.68 0.68 Hourly flow rate (vph) 0 1312 6 5 1085 0 7 0 7 15 0 25 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 758 1068 pX, platoon unblocked 0.86 0.77 0.85 0.85 0.77 0.85 0.85 0.86 vC, conflicting volume 1085 1318 1893 2410 659 1758 2413 542 vC1, stage 1 conf vol 1315 1315 1095 1095 vC2, stage 2 conf vol 578 1095 663 1318 vCu, unblocked vol 763 825 924 1536 0 765 1540 129 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 100 99 97 100 99 95 100 97 cM capacity (veh/h) 730 624 254 242 844 299 239 773 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 SB 1 Volume Total 0 874 444 5 723 362 15 40 Volume Left 0 0 0 5 0 0 7 15 Volume Right 0 0 6 0 0 0 7 25 cSH 1700 1700 1700 624 1700 1700 391 487 Volume to Capacity 0.00 0.51 0.26 0.01 0.43 0.21 0.04 0.08 Queue Length 95th (ft) 0 0 0 1 0 0 3 7 Control Delay (s) 0.0 0.0 0.0 10.8 0.0 0.0 14.6 13.0 Lane LOS B B B Approach Delay (s) 0.0 0.1 14.6 13.0 Approach LOS B B Intersection Summary Average Delay 0.3 Intersection Capacity Utilization 39.1% ICU Level of Service A Analysis Period (min) 15 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 4 RZ#Irdm Edmonds Walgreens 2014 With Project 17: 100th Ave W/9th Ave S & Elm Wy/220th St SW Lanes, Volumes, Timings - -,V I /0- i -4/ Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +T r 4 r 4 r T Volume (vph) 15 35 6 132 55 105 5 481 140 50 292 15 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 65 0 235 0 0 200 120 0 Storage Lanes 0 1 0 1 0 1 1 0 Taper Length (ft) 25 25 25 25 Lane Util, Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 1.00 1.00 Frt 0.850 0.850 0.850 0.993 Flt Protected 0.985 0.966 0.950 Satd. Flow (prot) 0 1668 1439 0 1636 1439 0 1693 1439 1608 1679 0 Flt Permitted 0.985 0.966 0.997 0.299 Satd. Flow (perm) 0 1668 1439 0 1636 1439 0 1688 1439 506 1679 0 Right Turn on Red No Yes No No Satd. Flow (RTOR) 115 Link Speed (mph) 25 30 30 30 Link Distance (ft) 663 721 3020 811 Travel Time (s) 18.1 16.4 68.6 18.4 Confl. Peds. (#/hr) 1 1 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% Adj. Flow (vph) 16 38 7 145 60 115 5 529 154 55 321 16 Shared Lane Traffic (%) Lane Group Flow (vph) 0 54 7 0 205 115 0 534 154 55 337 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 50 50 50 50 50 50 50 50 50 50 50 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Split NA Prot Split NA Prot Perm NA Perm Perm NA Protected Phases 4 4 4 8 8 8 2 6 Permitted Phases 2 2 6 Detector Phase 4 4 4 8 8 8 2 2 2 6 6 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 5 Edmonds Walgreens 1 08 77,777, 21 s;.' 06 2014 With Project 17: 100th Ave W/9th Ave S & Elm M/220th St SW Lanes, Volumes, Timings l'` ti• Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 21.0 21.0 21.0 21.0 21.0 21.0 21.0 21.0 21.0 25.0 25.0 Total Split (s) 21.0 21.0 21.0 21.0 21.0 21.0 33.0 33.0 33.0 33.0 33.0 Total Split (%) 28.0% 28.0% 28.0% 28.0% 28.0% 28.0% 44.0% 44.0% 44.0% 44.0% 44.0% Maximum Green (s) 16.0 16.0 16.0 16.0 16.0 16.0 28.0 28.0 28.0 28.0 28.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lead/Lag Lead -Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None None Min Min Min Min Min Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 15.0 15.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0 0 Act Effct Green (s) 10.6 10.6 14.5 14.5 26.9 26.9 26.9 26.9 Actuated g/C Ratio 0.19 0.19 0.27 0.27 0.49 0.49 0.49 0.49 v/c Ratio 0.17 0.03 0.47 0.25 0.64 0.22 0.22 0.41 Control Delay 24.8 23.8 23.6 6.4 17.8 11.9 14.5 13.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 24.8 23.8 23.6 6.4 17.8 11.9 14.5 13.3 LOS C C C A B B B B Approach Delay 24.7 17.4 16.4 13.5 Approach LOS C B B B Queue Length 50th (ft) 18 2 65 0 149 33 12 81 Queue Length 95th (ft) 49 12 134 35 295 77 40 164 Internal Link Dist (ft) 583 641 2940 731 Turn Bay Length (ft) 200 120 Base Capacity (vph) 594 512 582 586 1001 854 300 996 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.09 0.01 0.35 0.20 0.53 0.18 0.18 0.34 Intersection Summa Area Type: CBD Cycle Length: 75 Actuated Cycle Length: 54.7 Natural Cycle: 70 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.64 Intersection Signal Delay: 16.2 Intersection LOS: B Intersection Capacity Utilization 70.8% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 17: 100th Ave Wl9th Ave S & Elm Wv/220th St SW 02 04 1 08 77,777, 21 s;.' 06 JAB Page 6 Edmonds Walgreens 2014 With Project 18: 100th Ave W & Edmonds Wy Lanes, Volumes, Timings ,- --* f- 4\ !1- Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations ti, +T 0 0 Volume (vph) 61 638 170 151 615 215 220 447 133 175 255 50 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 Ped Bike Factor 1.00 1.00 0.99 1.00 Frt 0.968 0.961 0.966 0.975 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 3426 0 1787 3423 0 1787 3453 0 1787 3473 0 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1769 3426 0 1787 3423 0 1777 3453 0 1787 3473 0 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 35 35 30 30 Link Distance (ft) 801 262 706 259 Travel Time (s) 15.6 5.1 16.0 5.9 Confl. Peds. (#/hr) 1 1 6 6 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Heavy Vehicles (%) 2% 2% 2% 1% 1% 1% 1% 1% 1% 1% 1% 1% Adj. Flow (vph) 69 725 193 172 699 244 250 508 151 199 290 57 Shared Lane Traffic (%) Lane Group Flow (vph) 69 918 0 172 943 0 250 659 0 199 347 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 50 50 50 50 50 50 50 50 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.0 32.5 21.0 32.5 20.0 25.5 9.0 25.5 Total Split (s) 12.0 33.0 21.0 42.0 20.0 29.0 17.0 26.0 Total Split (%) 12.0% 33.0% 21.0% 42.0% 20.0% 29.0% 17.0% 26.0% 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 7 Edmonds Walgreens t o2 00 o4 2014 With Project 18: 100th Ave W & Edmonds Wy o5 • 06 o7 1 08 Lanes, Volumes, Timings --t ',- 4\ t l" Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Maximum Green (s) 8.0 27.5 17.0 36.5 16.0 23.5 13.0 20.5 Yellow Time (s) 3.0 4.0 3.0 4.0 3.0 4.0 3.0 4.0 All -Red Time (s) 1.0 1.5 1.0 1.5 1.0 1.5 1.0 1.5 Lost Time Adjust (s) -1.0 -2.5 -1.0 -2.5 -1.0 -2.5 -1.0 -2.5 Total Lost Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None Min None Min None None None None Walk Time (s) 7.0 7.0 5.0 5.0 Flash Dont Walk (s) 20.0 20.0 15.0 15.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 8.4 29.1 14.7 37.7 16.3 23.8 13.5 21.0 Actuated g/C Ratio 0.09 0.31 0.16 0.40 0.17 0.26 0.14 0.23 v/c Ratio 0.43 0.86 0.61 0.68 0.80 0.75 0.77 0.44 Control Delay 51.3 40.6 47.4 27.2 58.7 38.5 60.7 33.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 51.3 40.6 47.4 27.2 58.7 38.5 60.7 33.8 LOS D D D C E D E C Approach Delay 41.4 30.3 44.1 43.6 Approach LOS D C D D Queue Length 50th (ft) 41 282 101 261 151 195 121 96 Queue Length 95th (ft) 85 #391 164 324 #274 260 #229 140 Internal Link Dist (ft) 721 182 626 179 Turn Bay Length (ft) Base Capacity(vph) 172 1114 349 1447 329 973 271 866 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.40 0.82 0.49 0.65 0.76 0.68 0.73 0.40 Intersection Summa Area Type: Other Cycle Length: 100 Actuated Cycle Length: 93.2 Natural Cycle: 100 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.86 Intersection Signal Delay: 38.9 Intersection LOS: D Intersection Capacity Utilization 71.1% ICU Level of Service C Analysis Period (min)15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 18: 100th Ave W & Edmonds Wv 01 t o2 00 o4 o5 • 06 o7 1 08 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 8 Edmonds Walgreens 2014 With Project 30: Driveway/95th PI . & Edmonds Wy Lanes, Volumes, Timings --* k- r0- 411 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tt) tlr* T Volume (vph) 126 811 5 5 910 75 5 5 5 40 5 116 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 10 10 10 12 12 12 Storage Length (ft) 250 0 250 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 1 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 1.00 0.99 Frt 0.999 0.989 0.955 0.857 Flt Protected 0.950 0.950 0.984 0.950 Satd. Flow (prot) 1770 3536 0 1787 3535 0 0 1666 0 1787 1590 0 Flt Permitted 0.178 0.248 0.933 0.746 Satd. Flow (perm) 332 3536 0 467 3535 0 0 1579 0 1403 1590 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 2 25 6 112 Link Speed (mph) 35 35 15 15 Link Distance (ft) 1068 446 262 685 Travel Time (s) 20.8 8.7 11.9 31.1 Confl. Peds. (#/hr) 2 2 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Heavy Vehicles (%) 2% 2% 2% 1 % 1 % 1 % 0% 0% 0% 1 % 1% 1% Adj. Flow (vph) 143 922 6 6 1034 85 6 6 6 45 6 132 Shared Lane Traffic (%) Lane Group Flow (vph) 143 928 0 6 1119 0 0 18 0 45 138 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.09 1.09 1.09 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 2 1 2 1 2 Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (ft) 20 100 20 100 20 100 20 100 Trailing Detector (ft) 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 20 6 20 6 20 6 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 94 Detector 2 Size(ft) 6 6 6 6 Detector 2 Type CI+Ex CI+Ex CI+Ex CI+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 9 Edmonds Walgreens 2014 With Project 30: Driveway/95th P1. & Edmonds Wy Lanes, Volumes, Timings Intersection Area Type: Other Cycle Length: 60 Actuated Cycle Length: 50.9 Natural Cycle: 60 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 11.7 Intersection LOS: B Intersection Capacity Utilization 52.5% ICU Level of Service A 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 10 -,* /". #41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 2 2 6 6 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 Total Split (s) 40.0 40.0 40.0 40.0 20.0 20.0 20.0 20.0 Total Split (%) 66.7% 66.7% 66.7% 66.7% 33.3% 33.3% 33.3% 33.3% Maximum Green (s) 36.0 36.0 36.0 36.0 16.0 16.0 16.0 16.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead -Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode Min Min Min Min Max Max Min Min Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 Act Effct Green (s) 26.2 26.2 26.2 26.2 16.5 16.5 16.5 Actuated g/C Ratio 0.51 0.51 0.51 0.51 0.32 0.32 0.32 v/c Ratio 0.84 0.51 0.03 0.61 0.03 0.10 0.23 Control Delay 51.8 8.6 5.4 9.6 13.7 16.5 7.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 51.8 8.6 5.4 9.6 13.7 16.5 7.2 LOS D A A A B B A Approach Delay 14.4 9.5 13.7 9.5 Approach LOS B A B A Queue Length 50th (ft) 32 82 1 104 3 10 6 Queue Length 95th (ft) #125 113 5 142 16 33 41 Internal Link Dist (ft) 988 366 182 605 Turn Bay Length (ft) 250 250 Base Capacity (vph) 242 2578 340 2583 515 454 591 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.59 0.36 0.02 0.43 0.03 0.10 0.23 Intersection Area Type: Other Cycle Length: 60 Actuated Cycle Length: 50.9 Natural Cycle: 60 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 11.7 Intersection LOS: B Intersection Capacity Utilization 52.5% ICU Level of Service A 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 10 Edmonds Walgreens 2014 With Project 30: Driveway/95th PI . & Edmonds Wy Lanes, Volumes, Timings Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 30: Drivewav/95th PI . & Edmonds Wv o2 o4 06 08 1/24/2012 5:00 pm Synchro 7 - Report SAB Page 11 Edmonds Walgreens 2014 With Project 1: 100th Ave W & 100th AV Dwy HCM Unsignalized Intersection Capacity Analysis Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T* 0 1 0 Volume (veh/h) 39 3 52 53 1 83 62 589 72 54 375 14 Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.89 0.89 0.89 0.98 0.98 0.98 Hourly flow rate (vph) 42 3 57 58 1 90 70 662 81 55 383 14 Pedestrians 3 1 2 1 Lane Width (ft) 10.0 10.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 4.0 Percent Blockage 0 0 0 0 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 259 pX, platoon unblocked 0.86 0.86 0.86 0.86 0.86 0.86 vC, conflicting volume 1065 1386 203 1204 1353 373 400 744 vC1, stage 1 conf vol 503 503 843 843 vC2, stage 2 conf vol 562 883 362 510 vCu, unblocked vol 740 1115 203 903 1076 0 400 365 tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 90 99 93 84 100 90 94 95 cM capacity (veh/h) 409 325 807 353 344 933 1160 1025 Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total 102 58 91 70 441 301 55 255 142 Volume Left 42 58 0 70 0 0 55 0 0 Volume Right 57 0 90 0 0 81 0 0 14 cSH 556 353 914 1160 1700 1700 1025 1700 1700 Volume to Capacity 0.18 0.16 0.10 0.06 0.26 0.18 0.05 0.15 0.08 Queue Length 95th (ft) 17 14 8 5 0 0 4 0 0 Control Delay (s) 12.9 17.2 9.4 8.3 0.0 0.0 8.7 0.0 0.0 Lane LOS B C A A A Approach Delay (s) 12.9 12.4 0.7 1.1 Approach LOS B B Intersection Summary Average Delay 2.8 Intersection Capacity Utilization 44.3% ICU Level of Service A Analysis Period (min) 15 1/24/2012 5:00 pm Synchro 7 - Report JAB Pagel Edmonds Walgreens 2014 With Project 2: Edmonds WI & West Dwy HCM Unsignalized Intersection Capacity Analysis ,1* 4. Movement EBL EBT WBT WBR SBL SBR Lane Configurations tt tT+ r Volume (veh/h) 0 946 952 54 0 29 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.77 0.77 0.97 0.97 0.93 0.93 Hourly flow rate (vph) 0 1229 981 56 0 31 Pedestrians 2 Lane Width (ft) 10.0 Walking Speed (ft/s) 4.0 Percent Blockage 0 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 262 pX, platoon unblocked 0.77 vC, conflicting volume 1039 1626 521 vC1, stage 1 conf vol 1011 vC2, stage 2 conf vol 614 vCu, unblocked vol 1039 1211 521 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s) 5.8 tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 94 cM capacity (veh/h) 670 299 505 Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 Volume Total 614 614 654 383 31 Volume Left 0 0 0 0 0 Volume Right 0 0 0 56 31 cSH 1700 1700 1700 1700 505 Volume to Capacity 0.36 0.36 0.38 0.23 0.06 Queue Length 95th (ft) 0 0 0 0 5 Control Delay (s) 0.0 0.0 0.0 0.0 12.6 Lane LOS B Approach Delay (s) 0.0 0.0 12.6 Approach LOS B Intersection Summary Average Delay 0.2 Intersection Capacity Utilization 38.0% ICU Level of Service A Analysis Period (min) 15 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 2 Edmonds Walgreens 2014 With Project 3: Edmonds Wy & Center Dwy HCM Unsignalized Intersection Capacity Analysis 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 3 4. Movement EBL EBT WBT WBR SBL SBR Lane Configurations ++ tT I r Volume (veh/h) 24 922 980 40 37 26 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.77 0.77 0.97 0.97 0.81 0.81 Hourly flow rate (vph) 31 1197 1010 41 46 32 Pedestrians 1 Lane Width (ft) 10.0 Walking Speed (ft/s) 4.0 Percent Blockage 0 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 528 1298 pX, platoon unblocked 0.92 0.83 0.92 vC, conflicting volume 1053 1693 527 vC1, stage 1 conf vol 1032 vC2, stage 2 conf vol 661 vCu, unblocked vol 882 979 311 tC, single (s) 4.1 6.8 6.9 IC, 2 stage (s) 5.8 tF (s) 2.2 3.5 3.3 p0 queue free % 96 86 95 cM capacity (veh/h) 706 333 635 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 SB 1 SB 2 Volume Total 31 599 599 674 378 46 32 Volume Left 31 0 0 0 0 46 0 Volume Right 0 0 0 0 41 0 32 cSH 706 1700 1700 1700 1700 333 635 Volume to Capacity 0.04 0.35 0.35 0.40 0.22 0.14 0.05 Queue Length 95th (ft) 3 0 0 0 0 12 4 Control Delay (s) 10.3 0.0 0.0 0.0 0.0 17.5 11.0 Lane LOS B C B Approach Delay (s) 0.3 0.0 14.8 Approach LOS B Intersection Summary Average Delay 0.6 Intersection Capacity Utilization 38.4% ICU Level of Service A Analysis Period (min) 15 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 3 Edmonds Walgreens 2014 With Project 4: Dwy/East Dwy & Edmonds Wy HCM Unsignalized Intersection Capacity Analysis 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 4 "► 4-_ t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 0 tt +T+ Volume (veh/h) 7 947 5 5 992 11 5 0 5 15 0 23 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.77 0.77 0.77 0.97 0.97 0.97 0.68 0.68 0.68 0.68 0.68 0.68 Hourly flow rate (vph) 9 1230 6 5 1023 11 7 0 7 22 0 34 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 758 1068 pX, platoon unblocked 0.87 0.80 0.86 0.86 0.80 0.86 0.86 0.87 vC, conflicting volume 1034 1236 1807 2296 618 1679 2293 517 vC1, stage 1 conf vol 1251 1251 1039 1039 vC2, stage 2 conf vol 555 1044 640 1255 vCu, unblocked vol 746 795 953 1519 22 805 1516 153 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 99 99 97 100 99 93 100 96 cM capacity (veh/h) 754 663 261 248 845 313 248 760 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 SB 1 Volume Total 9 820 416 5 682 352 15 56 Volume Left 9 0 0 5 0 0 7 22 Volume Right 0 0 6 0 0 11 7 34 cSH 754 1700 1700 663 1700 1700 399 486 Volume to Capacity 0.01 0.48 0.24 0.01 0.40 0.21 0.04 0.11 Queue Length 95th (ft) 1 0 0 1 0 0 3 10 Control Delay (s) 9.8 0.0 0.0 10.5 0.0 0.0 14.4 13.4 Lane LOS A B B B Approach Delay (s) 0.1 0.1 14.4 13.4 Approach LOS B B Intersection Summary Average Delay 0.5 Intersection Capacity Utilization 37.8% ICU Level of Service A Analysis Period (min) 15 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 4 • �� • • 1 _ • Edmonds Walgreens 2019 With Project 17: 100th Ave W/9th Ave S & Elm M/220th St SW Lanes, Volumes, Timings , ';r ix 4\ t /0` Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +T r +T r 4 r I T Volume (vph) 15 35 6 137 60 115 5 511 150 55 312 15 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 65 0 235 0 0 200 120 0 Storage Lanes 0 1 0 1 0 1 1 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 1.00 1.00 Frt 0.850 0.850 0.850 0.993 Flt Protected 0.985 0.966 0.950 Satd. Flow (prot) 0 1668 1439 0 1636 1439 0 1693 1439 1608 1680 0 Flt Permitted 0.985 0.966 0.997 0.272 Satd. Flow (perm) 0 1668 1439 0 1636 1439 0 1688 1439 461 1680 0 Right Turn on Red No Yes No No Satd. Flow (RTOR) 126 Link Speed (mph) 25 30 30 30 Link Distance (ft) 663 721 3020 811 Travel Time (s) 18.1 16.4 68.6 18.4 Confl. Peds. (#/hr) 1 1 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% Adj. Flow (vph) 16 38 7 151 66 126 5 562 165 60 343 16 Shared Lane Traffic (%) Lane Group Flow (vph) 0 54 7 0 217 126 0 567 165 60 359 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 50 50 50 50 50 50 50 50 50 50 50 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Split NA Prot Split NA Prot Perm NA Perm Perm NA Protected Phases 4 4 4 8 8 8 2 6 Permitted Phases 2 2 6 Detector Phase 4 4 4 8 8 8 2 2 2 6 6 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 5 Edmonds Walgreens 2019 With Project 17: 100th Ave W/9th Ave S & Elm W 20th St SW Lanes, Volumes, Timings Intersection Summa Area Type: CBD Cycle Length: 75 Actuated Cycle Length: 55.4 Natural Cycle: 70 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.68 Intersection Signal Delay: 17.0 Intersection LOS: B Intersection Capacity Utilization 76.1% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 17: 100th Ave W/9th Ave S & Elm Wy/220th St SW t' o2 m4 7,8 06c - 4\T /` Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 21.0 21.0 21.0 21.0 21.0 21.0 21.0 21.0 21.0 25.0 25.0 Total Split (s) 21.0 21.0 21.0 21.0 21.0 21.0 33.0 33.0 33.0 33.0 33.0 Total Split (%) 28.0% 28.0% 28.0% 28.0% 28.0% 28.0% 44.0% 44.0% 44.0% 44.0% 44.0% Maximum Green (s) 16.0 16.0 16.0 16.0 16.0 16.0 28.0 28.0 28.0 28.0 28.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lead/Lag Lead -Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None None Min Min Min Min Min Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 15.0 15.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0 0 Act Effct Green (s) 10.6 10.6 14.8 14.8 27.3 27.3 27.3 27.3 Actuated g/C Ratio 0.19 0.19 0.27 0.27 0.49 0.49 0.49 0.49 v/c Ratio 0.17 0.03 0.50 0.26 0.68 0.23 0.26 0.43 Control Delay 25.3 24.2 24.3 6.3 19.2 12.1 15.8 13.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 25.3 24.2 24.3 6.3 19.2 12.1 15.8 13.7 LOS C C C A B B B B Approach Delay 25.1 17.7 17.6 14,0 Approach LOS C B B B Queue Length 50th (ft) 19 2 74 0 167 36 13 89 Queue Length 95th (ft) 49 12 141 36 #362 82 45 177 Internal Link Dist (ft) 583 641 2940 731 Turn Bay Length (ft) 200 120 Base Capacity (vph) 584 504 573 586 986 840 269 981 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.09 0.01 0.38 0.22 0.58 0.20 0.22 0.37 Intersection Summa Area Type: CBD Cycle Length: 75 Actuated Cycle Length: 55.4 Natural Cycle: 70 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.68 Intersection Signal Delay: 17.0 Intersection LOS: B Intersection Capacity Utilization 76.1% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 17: 100th Ave W/9th Ave S & Elm Wy/220th St SW t' o2 m4 7,8 06c Edmonds Walgreens 2019 With Project 18: 100th Ave W & Edmonds Wy Lanes, Volumes, Timings Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Vii 0 0 tT I tT+ Volume (vph) 66 678 180 161 655 230 235 472 143 185 270 50 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 Ped Bike Factor 1.00 1.00 0.99 1.00 Frt 0.968 0.961 0.965 0.977 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 3426 0 1787 3423 0 1787 3449 0 1787 3481 0 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1769 3426 0 1787 3423 0 1777 3449 0 1787 3481 0 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 35 35 30 30 Link Distance (ft) 801 262 706 259 Travel Time (s) 15.6 5.1 16.0 5.9 Confl. Peds. (#/hr) 1 1 6 6 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Heavy Vehicles (%) 2% 2% 2% 1% 1% 1% 1% 1% 1% 1% 1% 1% Adj. Flow (vph) 75 770 205 183 744 261 267 536 162 210 307 57 Shared Lane Traffic (%) Lane Group Flow (vph) 75 975 0 183 1005 0 267 698 0 210 364 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 50 50 50 50 50 50 50 50 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.0 32.5 21.0 32.5 20.0 25.5 9.0 25.5 Total Split (s) 12.0 33.0 21.0 42.0 20.0 29.0 17.0 26.0 Total Split (%) 12.0% 33.0% 21.0% 42.0% 20.0% 29.0% 17.0% 26.0% 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 7 Edmonds Walgreens 2019 With Project 18: 100th Ave W & Edmonds Wy Lanes, Volumes, Timings Intersection Summa Area Type: Other Cycle Length: 100 Actuated Cycle Length: 95.4 Natural Cycle: 100 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 41.9 Intersection LOS: D Intersection Capacity Utilization 74,6% ICU Level of Service D Analysis Period (min)15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 18: 100th Ave W & Edmonds Wy 01 T o2 4 03 o4 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Maximum Green (s) 8.0 27.5 17.0 36.5 16.0 23.5 13.0 20.5 Yellow Time (s) 3.0 4.0 3.0 4.0 3.0 4.0 3.0 4.0 All -Red Time (s) 1.0 1.5 1.0 1.5 1.0 1.5 1.0 1.5 Lost Time Adjust (s) -1.0 -2.5 -1.0 -2.5 -1.0 -2.5 -1.0 -2.5 Total Lost Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None Min None Min None None None None Walk Time (s) 7.0 7.0 5.0 5.0 Flash Dont Walk (s) 20.0 20.0 15.0 15.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 8.5 30.0 15.1 38.8 16.6 24.5 13.7 21.7 Actuated g/C Ratio 0.09 0.31 0.16 0.41 0.17 0.26 0.14 0.23 v/c Ratio 0.47 0.91 0.65 0.72 0.86 0.79 0.82 0.46 Control Delay 53.3 45.3 49.4 28.6 65.8 40.6 66.3 34.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 53.3 45.3 49.4 28.6 65.8 40.6 66.3 34.4 LOS D D D C E D E C Approach Delay 45.9 31.8 47.6 46.1 Approach LOS D C D D Queue Length 50th (ft) 45 310 108 285 164 212 130 103 Queue Length 95th (ft) 90 #432 175 353 #300 277 #248 146 Internal Link Dist (ft) 721 182 626 179 Turn Bay Length (ft) Base Capacity (vph) 168 1084 339 1433 320 945 263 844 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.45 0.90 0.54 0.70 0.83 0.74 0.80 0.43 Intersection Summa Area Type: Other Cycle Length: 100 Actuated Cycle Length: 95.4 Natural Cycle: 100 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 41.9 Intersection LOS: D Intersection Capacity Utilization 74,6% ICU Level of Service D Analysis Period (min)15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 18: 100th Ave W & Edmonds Wy 01 T o2 4 03 o4 05 06 o7 08 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 8 Edmonds Walgreens 2019 With Project 30: Driveway/95th PI . & Edmonds Wy Lanes, Volumes, Timings Lane WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations "` ' f` EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +13� tT T Volume (vph) 136 861 5 5 965 80 5 5 5 40 5 121 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 10 10 10 12 12 12 Storage Length (ft) 250 0 250 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 1 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 1.00 0.99 Frt 0.999 0.989 0.955 0.856 Flt Protected 0.950 0.950 0.984 0.950 Satd. Flow (prot) 1770 3536 0 1787 3535 0 0 1666 0 1787 1588 0 Flt Permitted 0.166 0.234 0.930 0.746 Satd. Flow (perm) 309 3536 0 440 3535 0 0 1574 0 1403 1588 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 2 26 6 97 Link Speed (mph) 35 35 15 15 Link Distance (ft) 1068 446 262 685 Travel Time (s) 20.8 8.7 11.9 31.1 Confl. Peds. (#/hr) 2 2 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Heavy Vehicles (%) 2% 2% 2% 1 % 1 % 1 % 0% 0% 0% 1% 1 % 1 % Adj. Flow (vph) 155 978 6 6 1097 91 6 6 6 45 6 138 Shared Lane Traffic (%) Lane Group Flow (vph) 155 984 0 6 1188 0 0 18 0 45 144 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.09 1.09 1.09 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 2 1 2 1 2 Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (ft) 20 100 20 100 20 100 20 100 Trailing Detector (ft) 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 20 6 20 6 20 6 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 94 Detector 2 Size(ft) 6 6 6 6 Detector 2 Type CI+Ex CI+Ex CI+Ex CI+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 1/24/2012 5:00 pm Synchro 7 - Report SAB Page 9 Edmonds Walgreens 2019 With Project 30: Driveway/95th P1. & Edmonds Wy Lanes, Volumes, Timings Intersection Summa Area Type: Other Cycle Length: 60 Actuated Cycle Length: 54.4 Natural Cycle: 60 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.92 Intersection Signal Delay: 12.6 Intersection LOS: B Intersection Capacity Utilization 55.1 % ICU Level of Service B 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 10 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 2 2 6 6 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 Total Split (s) 40.0 40.0 40.0 40.0 20.0 20.0 20.0 20.0 Total Split (%) 66.7% 66.7% 66.7% 66.7% 33.3% 33.3% 33.3% 33.3% Maximum Green (s) 36.0 36.0 36.0 36.0 16.0 16.0 16.0 16.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead -Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode Min Min Min Min Max Max Min Min Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 Act Effct Green (s) 29.8 29.8 29.8 29.8 16.4 16.4 16.4 Actuated g/C Ratio 0.55 0.55 0.55 0.55 0.30 0.30 0.30 v/c Ratio 0.92 0.51 0.02 0.61 0.04 0.11 0.26 Control Delay 68.3 8.3 5.2 9.2 14.1 17.4 9.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 68.3 8.3 5.2 9.2 14.1 17.4 9.1 LOS E A A A B B A Approach Delay 16.4 9.2 14.1 11.0 Approach LOS B A B B Queue Length 50th (ft) 39 89 1 114 3 12 13 Queue Length 95th (ft) #143 122 4 155 16 33 48 Internal Link Dist (ft) 988 366 182 605 Turn Bay Length (ft) 250 250 Base Capacity (vph) 209 2395 298 2402 478 422 546 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.74 0.41 0.02 0.49 0.04 0.11 0.26 Intersection Summa Area Type: Other Cycle Length: 60 Actuated Cycle Length: 54.4 Natural Cycle: 60 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.92 Intersection Signal Delay: 12.6 Intersection LOS: B Intersection Capacity Utilization 55.1 % ICU Level of Service B 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 10 Edmonds Walgreens 2019 With Project 30: Driveway/95th PI. & Edmonds Wy Lanes, volumes, Timings Analysis Period (min)15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 30: Driveway/95th PI . & Edmonds Wy 1 m2 "M" m4 24s46 06 08 2C1'M 4G 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 11 Edmonds Walgreens 2019 With Project 1: 100th Ave W & 100th AV Dwy HCM Unsiggnalized Intersection Capacity Analysis -,* k- "*\ 1 1'` Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Vi T tT 1 0 Volume (veh/h) 39 3 52 53 1 83 62 634 72 54 400 14 Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.89 0.89 0.89 0.98 0.98 0.98 Hourly flow rate (vph) 42 3 57 58 1 90 70 712 81 55 408 14 Pedestrians 3 1 2 1 Lane Width (ft) 10.0 10.0 12.0 12.0 Walking Speed (ftls) 4.0 4.0 4.0 4.0 Percent Blockage 0 0 0 0 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 259 pX, platoon unblocked 0.84 0.84 0.84 0.84 0.84 0.84 vC, conflicting volume 1116 1462 216 1268 1429 399 425 794 vC1, stage 1 conf vol 529 529 893 893 vC2, stage 2 conf vol 587 934 374 536 vCu, unblocked vol 765 1175 216 945 1136 0 425 383 tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 89 99 93 83 100 90 94 94 cM capacity (veh/h) 398 310 792 337 329 918 1135 993 Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total 102 58 91 70 475 318 55 272 150 Volume Left 42 58 0 70 0 0 55 0 0 Volume Right 57 0 90 0 0 81 0 0 14 cSH 542 337 899 1135 1700 1700 993 1700 1700 Volume to Capacity 0.19 0.17 0.10 0.06 0.28 0.19 0.06 0.16 0.09 Queue Length 95th (ft) 17 15 8 5 0 0 4 0 0 Control Delay (s) 13.2 17.9 9.5 8.4 0.0 0.0 8.8 0.0 0.0 Lane LOS B C A A A Approach Delay (s) 13.2 12.7 0.7 1.0 Approach LOS B B Intersection Summary Average Delay 2.7 Intersection Capacity Utilization 45.5% ICU Level of Service A Analysis Period (min) 15 1/2412012 5:00 pm Synchro 7 - Report JAB Page 1 Edmonds Walgreens 2019 With Project 2: Edmonds WI & West DWy HCM Unsignalized Intersection Capacity Analysis 4-... \,. Movement EBL EBT WBT WBR SBL SBR Lane Configurations tt 0 r Volume (veh/h) 0 1006 1017 54 0 29 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.77 0.77 0.97 0.97 0.93 0.93 Hourly flow rate (vph) 0 1306 1048 56 0 31 Pedestrians 2 Lane Width (ft) 10.0 Walking Speed (ft/s) 4.0 Percent Blockage 0 Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) 262 pX, platoon unblocked 0.75 vC, conflicting volume 1106 1732 554 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 1106 1308 554 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 94 cM capacity (veh/h) 632 115 480 Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 Volume Total 653 653 699 405 31 Volume Left 0 0 0 0 0 Volume Right 0 0 0 56 31 cSH 1700 1700 1700 1700 480 Volume to Capacity 0.38 0.38 0.41 0.24 0.06 Queue Length 95th (ft) 0 0 0 0 5 Control Delay (s) 0.0 0.0 0.0 0.0 13.0 Lane LOS B Approach Delay (s) 0.0 0.0 13.0 Approach LOS B Intersection Summary Average Delay 0.2 Intersection Capacity Utilization 39.8% ICU Level of Service A Analysis Period (min) 15 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 2 Edmonds Walgreens 2019 With Project 3: Edmonds WI &Center DWy HCM Unsignalized Intersection Capacity Analysis 'A k. �► .� Movement EBL EBT WBT WBR SBL SBR Lane Configurations tt 0 1 r Volume (veh/h) 24 982 1045 40 37 26 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.77 0.77 0.97 0.97 0.81 0.81 Hourly flow rate (vph) 31 1275 1077 41 46 32 Pedestrians 1 Lane Width (ft) 10.0 Walking Speed (ft/s) 4.0 Percent Blockage 0 Right turn flare (veh) Median type None TWLTL Median storage veh) 2 Upstream signal (ft) 528 1298 pX, platoon unblocked 0.89 0.82 0.89 vC, conflicting volume 1120 1799 560 vC1, stage 1 conf vol 1099 vC2, stage 2 conf vol 700 vCu, unblocked vol 897 943 272 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s) 5.8 tF (s) 2.2 3.5 3.3 p0 queue free % 95 86 95 cM capacity (veh/h) 678 320 654 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 SB 1 SB 2 Volume Total 31 638 638 718 400 46 32 Volume Left 31 0 0 0 0 46 0 Volume Right 0 0 0 0 41 0 32 cSH 678 1700 1700 1700 1700 320 654 Volume to Capacity 0.05 0.38 0.38 0.42 0.24 0.14 0.05 Queue Length 95th (ft) 4 0 0 0 0 12 4 Control Delay (s) 10.6 0.0 0.0 0.0 0.0 18.1 10.8 Lane LOS B C B Approach Delay (s) 0.3 0.0 15.1 Approach LOS C Intersection Summary Average Delay 0.6 Intersection Capacity Utilization 40.2% ICU Level of Service A Analysis Period (min) 15 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 3 Edmonds Walgreens 2019 With Project 4: Dwy/East Dwy & Edmonds Wy HCM Unsignalized Intersection Capacity Analysis moi► fi `- I ¢ /0. \0' Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Vii 0 fl� Volume (veh/h) 7 1007 5 5 1057 11 5 0 5 15 0 23 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.77 0.77 0.77 0.97 0.97 0.97 0.68 0.68 0.68 0.68 0.68 0.68 Hourly flow rate (vph) 9 1308 6 5 1090 11 7 0 7 22 0 34 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 758 1068 pX, platoon unblocked 0.85 0.78 0.85 0.85 0.78 0.85 0.85 0.85 vC, conflicting volume 1101 1314 1918 2441 657 1785 2438 551 vC1, stage 1 conf vol 1329 1329 1106 1106 vC2, stage 2 conf vol 589 1111 679 1332 vCu, unblocked vol 775 828 950 1565 0 793 1562 130 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 99 99 97 100 99 93 100 96 cM capacity (veh/h) 720 625 243 232 847 295 232 770 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 SB 1 Volume Total 9 872 442 5 726 375 15 56 Volume Left 9 0 0 5 0 0 7 22 Volume Right 0 0 6 0 0 11 7 34 cSH 720 1700 1700 625 1700 1700 378 471 Volume to Capacity 0.01 0.51 0.26 0.01 0.43 0.22 0.04 0.12 Queue Length 95th (ft) 1 0 0 1 0 0 3 10 Control Delay (s) 10.1 0.0 0.0 10.8 0.0 0.0 14.9 13.7 Lane LOS B B B B Approach Delay (s) 0.1 0.1 14.9 13.7 Approach LOS B B Intersection Summary Average Delay 0.5 Intersection Capacity Utilization 39.6% ICU Level of Service A Analysis Period (min) 15 1/24/2012 5:00 pm Synchro 7 - Report JAB Page 4