Loading...
Tiersma Plans.pdfRECEIVED HE28 suiw.0 &bon& uhhhes comorhum CUSTOMER — EUC A coordinated utilit), environment which maximizes joint utility opportunities to provide qualify service for the citizens of Edmonds ................................................. ... YOU WILL BE GIVEN A CONFIRMATION NUMBER BY EACHUTILITY ONCE YOU HAVE INFORMED THEM OF YOUR PROJECT. V16r SITE ADDRESS: qq-"A /-W6. W. 2EIYE11�2 �1'111yk v-, �t W P sul qmzLrdm��� Mary McAllister - 425.670-3216 You will need to provide PUD with a site plan and a completed New Service Questionnaire. 20" pp gg -'T / Y� # 15 0 c !��( FNE16Y g ("M New Customer Construction Call to verify gas availability and to coordinate service install. You will need to Department - 1.888-321-7779 provide parcel number, contact phone number and mailing address. Ma 5 11 0 1 �5 127 You will need to provide Frontier with the location of your project, total line Jeremy Fallt - 425,263-4024 requirement, and the date in which service is required. A copy of your # You will need to provide Comeast with the location of your project, a copy of Mike Fontenot 425.263-5482 your development and site plan (digital copy if available.) The date in which service is required and a list of contact names, phone numbers & mailing k� (35 Steve Dunphy - 425.774-7769 ext. 110 You will need to provide &WSD with the survey map Aoyour site and For customers in Olympic View Service Area . ........... ............... . complete a development information form. "T'A"X, FAKCeU. f,10. THIS FORM MUST BE COMPLETED AND CSI VENTO DEVELOPMENT SERVICES STAFF AT'IHE TIME OF PERMIT SUBMITTAL Rev. 10/1/13 II W a I( fV c '( j}; I „ «, ,,, t A i1 �j a Y y s Ii s W ,,,1r E k °,,,i e e jV;,., Larne of Proposed Project; Peter Tiersma Short Plat _ZOPA,Ovr 's' Owner/Applicant Applicant Contact Person: IV Peter Tiersma Name P.O. Box 1029 Street/Mailing Address Woodinville, Washington 98072 City State Jeffrey Treiber Lovell-Sauerland & Assoc., Inc. Name 19217 36th Avenue W., Suite 106 Street/Mailing Address Lynnwood, Washington 98036 Zip City State Zip Telephone: 206-915-2232 Telephone: 42S-775-1591 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Contact Name Telephone: E-mail: o ri ii-,. ii,ii it a Duerr --i Prir mew -s:. THRESHOLD LEVELS OF ANALYSIS Project Traffic Levels Sections to Complete L Less than 25 peak -hour trips generated 1 and 7 only (Worksheet/Checklist) 11. More than 25 peak -hour trips generated All sections 1. PROJECT DESCRIPTION a. Location - Street address: 22318 92nd Avenue W. (Attach a vicinity rnap and site plan.) b. Specify existing land use: One existing single family residence c. Specify proposed type and size of development: Two lot short subdivision (11 of residential units and/or square footage of'he ilding) ReWsed oil 6124110 E82 - Dwjfic Impact Analysis i1%rksheet Page 1 of 5 d. Date construction will begin and be completed: Fall 2014, completion Spring 2015 e. Define proposed access locations: New driveways will be constructed on the south and east side. f. Define proposed sight distance at site egress locations: Driveways will have sight distance greater than 200 feet. 2. TRIP GENERATION Source shall be the Eighth Edition of the Institute of Transportation Engineers (ITE) Trip Generation manual. For independent fee calculations, the current edition of the ITE manual may be used. ADT = Average Daily Traffic PM Peak -hour trips (AM, noon or school peak may also apply as directed by the City Engineer) a. Existing Site Trip Generation Table: PM Peak -Hour Trips Land Use Daily (ADT) IN OUT b. Proposed Project Trip Generation Table: PM Peak -Hour Trips Land Use Daily (ADT) IN I OUT c. Net New Project Trip Generation Table: PM Peak -Hour Trips Land Use Daily (ADT) IN OUT d. .State assumptions and methodology for internal, link -diverted or passby trips: ReWsed ora 6124110 E82 - Trak Impact Atialysls Worksheet Page 2 of 5 Prepare and attach a graphic showing project trip distribution percentages and assignments. For developments that generate over 75 peak -hour trips, the City Engineer reserves the right to require trip distribution to be determined through use of the City traffic model. 1 4. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY a. Have sight distance requirements at egress location been met per AASHTO requirements? b. Intersection Level of Service (LOS) Analysis: Intersections to be evaluated shall be determined by the City ofEdrnonds Traffic Engineer Existing Conditions LOS 95% Delays Year of Opening LOS Delays Five Years Beyond Change of Land Use Five Years Beyond Change of LOS Delays Land Use c. Describe channelization warrants: (Attach striping plan.) d. Vehicle Storage/Queuing Analysis (calculate 50% and 95 % queuing lengths): e. If appropriate, state traffic control warrants (e.g. stop sign warrants, signal warrants): f. Summarize local accident history (only required for access to principal and minor arterials): 1 Available upon request at City of Edmonds Development Services Department Z Available upon request at City of Edmonds Police Department Revised on 6/24/10 E82 - Trak Impact Analysis Worksheet Page 3 of 5 50% 95% Existing Conditions Year of Opening Five Years Beyond Change of Land Use e. If appropriate, state traffic control warrants (e.g. stop sign warrants, signal warrants): f. Summarize local accident history (only required for access to principal and minor arterials): 1 Available upon request at City of Edmonds Development Services Department Z Available upon request at City of Edmonds Police Department Revised on 6/24/10 E82 - Trak Impact Analysis Worksheet Page 3 of 5 5. TRAFFIC VOLUMES Provide the following and other planned development traffic within the city.' a. Describe existing ADT and peak -hour counts (less than two years old), including turning movements, on street adjacent to and directly impacted by the project. b. Describe the estimated ADT and peak -hour counts, including turning movements, the year the project is fully open (with and without project traffic). c. Describe the estimated ADT and peak -hour counts, including turning movements, five years after the project has been fully open (with and without project traffic). d. State annual background traffic growth factor and source: 6. LEVEL OF SERVICE (LOS) ANALYSIS a. Summarize Level of Service Analysis below and attach supporting LOS analysis documentation. Provide the following documentation for each arterial street or arterial intersection impacted by ten or more peak -hour trips. Other City -planned developments' must also be factored into the LOS calculations. b. Note any assumptions/variations to standard analysis default values and justifications: ' A list of planned developments are available at the City upon request for public records Revised on 6/24/10 E82 - Trak Impact Analysis YT%rksheet Page 4 of 5 LOS LOS Existing Conditions Existing Delays Year of Opening With Project Without Project Five Years Beyond Change of Land Use With Project Without Project b. Note any assumptions/variations to standard analysis default values and justifications: ' A list of planned developments are available at the City upon request for public records Revised on 6/24/10 E82 - Trak Impact Analysis YT%rksheet Page 4 of 5 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. ITE Land Use Category New Use 210 Prior Use 210 Per Unit Fee Rate $1,196.33 X $1,196.33 X Units in square feet, # of dwelling, vfp, etc. E Fee $ 2,392.66 $ 1,196.33 New Use Fee: $ =PriorUseee: $ _ $ 1,196.331 ❑ NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, of , etc. New Use $ X — ■ ' MITIGATION FEE RECOMMENDATION: S 1,196.33_ INDEPENDENT FEE CALCULATION: $200.00 + consultant fee $ TOTAL TRAFFIC IMPACT FEE $ 1,196.33 City of Edmonds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. Revised on 6124110 E82 - Traffic Impact Analysis Worksheet Page 5 of 5 ---------- - '14F3 a SBF z ----- — ---- cl o < A 3m:Rv Pum Pei, j 0 z A W. gg vi (f) Cc 0 uj La loh. -77� M ui NIr-- ------- ------------- 1v j ---------- - '14F3 a SBF z ----- — ---- cl o A 3m:Rv Pum Pei, j W. gg vi h uj La -77� NIr-- ------- ------------- 1v j -------- - - --------------------------- -- - ------------------ - ---- ---------- - '14F3 a SBF z I 115 A 30VId P -I£6 Ld n O fi, Z 0 S (n Z 04� 0 z M o o z w08 *g' D -ss - 0 o Elm a uj 0 cn z IN JRV cl sk, Pei, j I 115 A 30VId P -I£6 Ld n O fi, Z 0 S (n Z 04� 0 z M o o z w08 *g' D -ss - 0 o Elm a uj 0 cn z IN JRV ull Pei, W. gg h P, ull Vpf t; jai P C5 , 1 Z5 16 P ---------- 'm 3nN3AV PUZ6 TL .0 ---------------------- - ------------ C'4 -- V -1d PJC6 T z Lal li < CL Z zN LU Z o z Z '—:0v) Say 0 2 cL U (A V5 z c'4 0 0 uj L� LLI z Lu 0 (n by o Ln 7 Elm uj w Zlllx: 0 15 0 m g (L (1) z In El z z tY