Loading...
TMO Edmonds Parkway Pre-Con Minutes.pdf went of north Present #5. then just item introductions NP=Notview of of point part Center is that table Control conduit lead round 56902048 32165606 562782742488248879335053 443340242770 0831 02208053 206.334.4116206.510.1337253.232.7438206.510.2207425.238.2221425.754.8712425.328.7001425.359.8371425.774.8612 proj Energy 670783783 783783344344346783 783344263327 802 771879 contact Џͼ with a AGENDA 425425425 425425425425425425 425425425425 425 425425 SEO1575A TMO (from AM meeting 11:00 the W 367713 Av install th MEETING 10:00 the SW/96 Parkway Project 2011, opened will Order contractorcontractor supervisor St Facilities foreman th 22, that Manager 220 Foreman PRECONSTRUCTION Edmonds site) February Matt Supt of Supt Work bore contractor (crane) contractor antennaantenna contractorconstruction intersection W Wireless permits Const.Const. Project Const to Av antenna. Equipment Const Const Bore) Center Construction (service th Tuesday, TMO 96 PUD Rentals Communications County Coordinator Equipment Mobile,ah͸ƭah͸ƭ OH UG Mobile, Facilities Manager, Road 21909 Mobile bore Control bore bore LeaderLeader Engineer a Transit, the new Major is ΛЋͼ Date Equipment Industries,Industries, t…5͸ƭ Owner, South ah͸ƭ of Edmonds Comm. PUD a Foreman There T Inc. T Wireless test ProjectProject Energy north Project Representing Representing Const, Major Tech, Community T Tech, Area Crew W, Tech PUD Bore, and framing, Comcast Property FrontierFrontier above. span Av of CedarCedar Α Α install Tetra Tetra Tetra PUD Full PUDPUDPUDPUDPUDPUDPUD PUDPUDPUDPUD Substation).th City one96 of kV NP to is listed side 12 Dispatcher This NP work framing, NP work, Description: and NP McReynolds Ledbetter east Middleton McAllister Edmonds. Corners NP Wear items NP NP PUD/TMO RussellBaggett Grove Zulauf kV Moore NP Findley extension Osborn Walton Widmer Hutchins the Fallt Kakaley Parker Brevik Smith Griffin 115 Deter Gibson kV Cook includes: Chief Hecox Christina along (5) 12 Richard Richard Jeremy 5 Joanne with Randy Nancy Chuck W, Kevin Steve MaryMatt Terryto Dana Chris Todd & Gary and Lynn John Cliff Nick course Bob Bill ECC Joe Location the line tap im bore Av pole J pole project th kV UG through of ЊЉЎ͸ 96 road ЍЎ͸ 115 PUD Project and 21909 Invitees: This aaa the 1)2)3)4)5) Edmonds file. of be City will project of bar the City ground the from the NESC. drawings. by in approval scans approved/stamped per the clear that confirming of BP remain and stamp the . *** permit of to drawings AGL 1/13/2011. are has 4 a E Б͸ show that sheet first PUD ROW ) Construction confirmed drawings to The 2010,1/13/2011! on TMO need base. dated lane).approval mentioned in the stamped ( used pole signed 12/29/11 departments 14, meeting. from one the permit be be offsite. Rev. / on approved work take not to to COE to meeting. line for this Standard. drawings are are extended painted is to COE only ground at the this that required.has TMO COE need are: drawings the this of (can pre that Material engineering the recently signature, Drawings to and many 4 at permit latest NO be went above E details radius) stamped sheet WNote PUD topole? pole. Av materials was that by PUD bars the both permit no ЊЉЎ͸ th ROW Parker. and on grade. minimum approved date set Carrier per on 96 with of review ground allowed PUD requires this resubmitted pm,brace, All noted on expiration date PUD review stamped Lynn for suppliers. will that ΛЏЉͼ moving allows below the 2 conduits crane with the received,the will is were to to Edmonds radius drawings that site, drawings this are ,brackets longer a on rental confirmed am materials eng20100398 hole of been traffic pole,drawings drawings 6" Equipment, long that items on list 9 stated recently (4) of no of posted a have ЍЎ͸ a hand built steel off Drawings: of need for latest City PUD mentioned Contractor window OH keep pole, significant 12 Stand may Matt Maximum Zulauf as or Permit, and be and Permit we Grounding a REV***The Submit BP and ЊЉЎ͸ FG shouldWill in There to Mobile ЋЍͼ See The UGCarrier Edmonds 6"The Material Stamped installed work need Permits Joanne Antenna ROWROW PUD Matt BP T Two PUD 1)2) be: restorationdeep right OT the would ЊЊ͵Ў͸ any the her that month kV concerning call with construction ready 115 andLynn. storm 1 to stay for (21915) that be maintained on to required will to thought directly Gibson work roadways, of site hole antennas. order to inspection. the now submitted Jim The be need and of not the with is the delivery. talked will south notification that test could onspoke crews request dirt on owner agreed andgroup window pole She him track installation PUD day ЊЉЎ͸The with conduit. the property group her. not then work have 5long. work the to A to The stop. outage. south ordirectly Practices on any theand complete to public. how installation. schedule Baggett work, paintapproval need with bus goes on size kV temporary will Managementinquired the spoken not weather UG to 115 bore, half the Kevin together otherwith contractor does OT the vault that drawings has Ћͼ concerning with Dana safely on crews the and a the reason he the for ECC work If closely Best vault that there. to for borework season. reasonable built grounding, PUD with perpendicular bore, emergency to schedule use said Mobile into work PUD thatcontractor to placedas work to Transit, and Ћͼ submit conduit storm the said group for would will Plan, T seemed ah͸ƭ be and contact set any hole is She he would and Community to Antenna it isthe Ћͼ Control heinstallation for pole, that that 425.771.0220. pot polementioned arrives. on Discussion that extend 2/28/2011 under reminded if would inquired stop and ЍЎ͸ said ЊЉЎ͸said said said Traffic and bore, bore bus to pole the Baggett Russell Zulauf Osborn, pole vault set Jim Hutchins Parker clearances. Roundtable crewcrew Smith After on Grove temporary ЍЎ͸ approval. Ћͼ TMO to approved the at starting Joanne TMO PUDPUDPUDPUD Set Chuck away when Kevin TerryDana first. Џͼ Lynn Rich Joe 1) 2)3)4)5)6)7) crew/crew permit). 3/8/2011. Property. PUD ROW any Private PUD. Tuesday TMO for attachment). at (see minutes. on contact done scanned 1 on A sheet be pole of will Fiber these . point drawing ЊЉЎ͸ stamped/approved north 3/7/2011? work the manager. of set for the This PUD top 2/28/2011, BP approved to pole. the the overhead scheduling. stamped Monday isconstruction on the work. 425.344.2461, on list been of north. south run of base the the Fiber by has then week PUD for the the crew have (which the this will TMO to to numbers affect to the do PUD conduit site to (Telco) Telco Smith, site to went the on the for permits the may The bore is Fiber Ћͼ from of phone ready Terry Gibson pole. as 0831 weather north conduit road awaiting the shown routing that antenna be for 802 the him Ћͼ Jim Contractor isattachments Ћͼ to week, give group the is 425 routing Telco and the pole (Sefnco) the ƭĻğƭƚƓͼͲ Gibson, to route Matt the up the the this Telco group routed set will Fiber in Antenna pole Reminded pole con change have UG change Jim the the ͻƭƷƚƩƒ the be proposed pre ЍЎ͸ crews issues. will for approved reminded a Schedule: the Set been route Mobile contractor conduit Parker in PUD While former Following schedule has Telco PUD has Update: Ћͼ Matt T There Lynn PUD TheTheTheThe