TMO Edmonds Parkway Pre-Con Minutes.pdf
went
of
north
Present
#5.
then
just
item
introductions
NP=Notview
of
of
point
part
Center
is
that
table
Control
conduit
lead
round
56902048
32165606 562782742488248879335053 443340242770 0831 02208053
206.334.4116206.510.1337253.232.7438206.510.2207425.238.2221425.754.8712425.328.7001425.359.8371425.774.8612
proj
Energy
670783783 783783344344346783 783344263327 802 771879
contact
Џͼ
with
a
AGENDA
425425425 425425425425425425 425425425425 425 425425
SEO1575A
TMO
(from
AM meeting
11:00
the
W
367713
Av
install
th
MEETING 10:00
the
SW/96
Parkway
Project
2011,
opened
will
Order
contractorcontractor
supervisor
St
Facilities foreman th
22,
that
Manager
220
Foreman
PRECONSTRUCTION
Edmonds
site)
February
Matt
Supt
of
Supt
Work
bore
contractor
(crane)
contractor
antennaantenna
contractorconstruction intersection
W
Wireless
permits
Const.Const.
Project
Const
to
Av
antenna.
Equipment
Const
Const
Bore)
Center
Construction
(service
th
Tuesday,
TMO
96
PUD
Rentals
Communications
County
Coordinator
Equipment
Mobile,ahƭahƭ
OH
UG Mobile,
Facilities
Manager,
Road
21909
Mobile
bore
Control
bore
bore
LeaderLeader
Engineer
a
Transit,
the
new
Major
is
ΛЋͼ
Date
Equipment
Industries,Industries,
t 5ƭ
Owner,
South
ahƭ of
Edmonds
Comm.
PUD
a
Foreman
There
T Inc.
T
Wireless
test
ProjectProject
Energy
north
Project
Representing
Representing
Const,
Major
Tech,
Community
T Tech,
Area
Crew
W,
Tech
PUD
Bore,
and
framing,
Comcast
Property
FrontierFrontier
above.
span
Av
of
CedarCedar
Α
Α
install
Tetra Tetra
Tetra
PUD
Full
PUDPUDPUDPUDPUDPUDPUD
PUDPUDPUDPUD Substation).th
City
one96
of
kV
NP
to
is
listed
side
12
Dispatcher
This
NP
work
framing,
NP
work,
Description:
and
NP
McReynolds
Ledbetter
east
Middleton
McAllister
Edmonds.
Corners
NP
Wear
items
NP
NP
PUD/TMO
RussellBaggett
Grove
Zulauf
kV
Moore
NP
Findley
extension
Osborn
Walton
Widmer
Hutchins
the
Fallt
Kakaley
Parker
Brevik
Smith
Griffin
115
Deter
Gibson
kV
Cook
includes:
Chief Hecox
Christina
along
(5)
12
Richard
Richard
Jeremy
5
Joanne
with
Randy
Nancy
Chuck
W,
Kevin Steve
MaryMatt
Terryto
Dana
Chris
Todd
&
Gary
and
Lynn John
Cliff
Nick
course
Bob
Bill
ECC
Joe
Location
the
line
tap
im
bore
Av
pole
J
pole
project
th
kV
UG
through
of
ЊЉЎ
96
road
ЍЎ
115
PUD
Project
and
21909
Invitees:
This
aaa
the
1)2)3)4)5)
Edmonds
file.
of
be
City
will
project
of
bar
the
City
ground
the
from
the
NESC.
drawings.
by
in
approval
scans
approved/stamped
per
the
clear
that
confirming
of
BP
remain
and
stamp
the
.
***
permit
of
to
drawings
AGL
1/13/2011.
are
has
4
a
E
Б
show
that
sheet
first
PUD
ROW
)
Construction
confirmed
drawings
to
The
2010,1/13/2011!
on
TMO
need
base.
dated
lane).approval
mentioned
in
the
stamped
(
used
pole
signed
12/29/11
departments
14,
meeting.
from
one
the
permit
be
be
offsite.
Rev.
/
on
approved
work
take
not
to
to
COE
to
meeting.
line
for
this
Standard.
drawings
are
are
extended
painted
is
to
COE
only ground
at
the
this
that
required.has
TMO
COE need
are:
drawings
the
this of
(can
pre
that
Material
engineering
the
recently
signature,
Drawings
to and
many
4
at
permit
latest
NO
be
went
above
E
details
radius)
stamped
sheet
WNote
PUD
topole?
pole.
Av
materials
was
that
by
PUD
bars
the
both
permit
no
ЊЉЎ
th
ROW
Parker.
and
on
grade.
minimum
approved
date
set
Carrier
per
on
96
with
of
review
ground
allowed
PUD
requires
this
resubmitted
pm,brace,
All
noted
on
expiration
date
PUD
review
stamped
Lynn
for
suppliers.
will
that
ΛЏЉͼ
moving
allows
below
the
2
conduits
crane
with
the
received,the
will
is
were to
to
Edmonds
radius
drawings that
site,
drawings
this
are
,brackets
longer
a
on
rental
confirmed
am
materials
eng20100398
hole
of
been
traffic
pole,drawings
drawings
6"
Equipment,
long
that
items
on
list
9
stated
recently
(4)
of
no of
posted
a
have
ЍЎ
a
hand built
steel
off
Drawings:
of
need
for
latest City
PUD
mentioned
Contractor
window
OH
keep
pole,
significant
12
Stand
may
Matt
Maximum
Zulauf
as
or
Permit,
and
be
and
Permit
we
Grounding
a
REV***The
Submit
BP
and
ЊЉЎ
FG
shouldWill in There
to
Mobile
ЋЍͼ
See
The
UGCarrier
Edmonds
6"The
Material
Stamped
installed
work
need
Permits
Joanne
Antenna
ROWROW
PUD
Matt
BP
T
Two
PUD
1)2)
be:
restorationdeep
right
OT
the
would
ЊЊ͵Ў
any
the
her
that
month
kV
concerning
call
with
construction
ready
115
andLynn.
storm
1
to
stay
for
(21915)
that
be
maintained
on
to
required
will
to
thought
directly
Gibson
work
roadways,
of
site
hole
antennas.
order
to
inspection.
the
now
submitted
Jim
The
be
need
and
of
not
the
with
is
the
delivery.
talked
will
south
notification
that
test
could
onspoke
crews
request
dirt
on
owner
agreed
andgroup
window
pole
She
him
track
installation
PUD
day
ЊЉЎThe
with
conduit.
the
property
group
her.
not
then
work
have
5long.
work
the
to
A
to
The
stop.
outage.
south
ordirectly
Practices
on
any
theand
complete
to
public.
how
installation.
schedule
Baggett
work,
paintapproval
need
with
bus
goes
on
size
kV
temporary
will
Managementinquired
the
spoken
not
weather
UG
to
115
bore,
half
the
Kevin
together
otherwith
contractor
does
OT
the
vault
that
drawings
has
Ћͼ
concerning
with
Dana
safely
on
crews
the
and
a
the
reason
he
the
for
ECC
work
If
closely
Best
vault
that
there.
to
for
borework
season.
reasonable
built
grounding,
PUD
with
perpendicular
bore,
emergency
to
schedule
use
said
Mobile
into
work
PUD
thatcontractor
to
placedas
work
to
Transit,
and
Ћͼ
submit
conduit
storm
the
said
group
for
would
will
Plan,
T
seemed
ahƭ
be
and
contact
set
any
hole
is
She
he
would
and
Community
to
Antenna
it
isthe
Ћͼ
Control
heinstallation
for
pole,
that
that
425.771.0220.
pot
polementioned
arrives.
on
Discussion
that
extend
2/28/2011
under
reminded
if
would
inquired
stop
and
ЍЎ
said
ЊЉЎsaid
said
said
Traffic
and
bore,
bore
bus
to
pole
the
Baggett
Russell
Zulauf
Osborn,
pole
vault
set
Jim
Hutchins
Parker
clearances.
Roundtable crewcrew
Smith
After
on
Grove
temporary
ЍЎ
approval.
Ћͼ
TMO
to
approved
the
at
starting
Joanne
TMO
PUDPUDPUDPUD
Set
Chuck
away
when
Kevin
TerryDana
first.
Џͼ
Lynn
Rich
Joe
1)
2)3)4)5)6)7)
crew/crew
permit).
3/8/2011.
Property.
PUD
ROW
any
Private
PUD.
Tuesday
TMO
for
attachment).
at
(see
minutes.
on
contact
done
scanned
1
on
A
sheet
be
pole
of
will
Fiber
these
.
point
drawing
ЊЉЎ
stamped/approved
north
3/7/2011?
work
the
manager.
of
set
for
the
This
PUD
top
2/28/2011,
BP
approved
to
pole.
the
the
overhead
scheduling.
stamped
Monday
isconstruction
on
the
work.
425.344.2461,
on
list
been
of
north.
south
run
of
base
the
the Fiber
by
has
then
week
PUD
for
the
the
crew
have
(which
the
this
will
TMO
to
to
numbers
affect
to
the
do
PUD
conduit
site
to
(Telco)
Telco
Smith,
site
to
went
the
on
the
for permits
the
may
The
bore
is
Fiber
Ћͼ
from
of
phone
ready
Terry
Gibson
pole.
as
0831
weather
north
conduit
road
awaiting
the
shown
routing
that
antenna
be
for
802
the
him
Ћͼ
Jim
Contractor
isattachments
Ћͼ
to
week,
give
group
the
is
425
routing
Telco
and
the
pole
(Sefnco)
the
ƭĻğƭƚƓͼͲ
Gibson,
to
route
Matt
the
up
the
the
this
Telco
group
routed
set
will
Fiber
in
Antenna
pole
Reminded
pole
con
change
have
UG
change
Jim
the
the
ͻƭƷƚƩƒ
the
be
proposed
pre
ЍЎ
crews
issues.
will
for
approved
reminded
a
Schedule:
the
Set
been route
Mobile
contractor
conduit
Parker
in
PUD
While former
Following
schedule has
Telco
PUD
has
Update:
Ћͼ
Matt
T
There
Lynn
PUD
TheTheTheThe