Traffic Impact Analysis.pdfCity of Edrnonds
'Traffic Imi )act Analysis Worksheet
Name of Proposed Project:
Owner/Applicant
/1" k� 4t p, "C C& -
Name
2-
Street[Mailing Address
--± 9 k
City State Zip
Telephone:
Q)
,K C—U"j VC) kWl
RESUB
41" e —
AUG - 3 2010
Applicant Contact Person,
FAHMNG't titARMEN1
cn Y OF EDMONDS
Name
(, )-Iq q
Street ailing Address
I tv k
City State Zip
Telephone:
F
Contact Name irm Name
Telephone: E -mail -
a. Location - Street address: ikV Si-ilced- L/'41 Ac,."W 1
..(Attach a vicinity map and site plan.)
7�
b. Specify existing land use- <- Cr
c. Specify proposed type and size of development:
(# qfresklential units and/or sqaware footage of building)
Revised on 6124110 E82 - Traffic Impact Analysis 1W ork5heet Page I of,
d. Date construction will begin and be completed:
e. Define proposed access locations: _�{� �.1 5
N
s>�
�_
�3=�•'�J-—__
f. Define proposed sight distance at site egress locations:
2. TRIP GENERATION
Source shall be the Eighth Edition of the Institute of Transportation Engineers (ITE) Trip Generation
manual. For independent fee calculations, the current edition of the ITE manual may be used.
ADT = Average Daily Traffic
PM Peak -hour trips (AM, noon or school peak may also apply as directed by the City Engineer)
a. Existing Site Trip Generation Table:
PM Peak -Hour Trips
Land Use Daily (ADT) IN OUT
b. Proposed Project Trip Generation Table:
PM Peak -Hour Trips
Land Use Daily (ADT) IN OUT
c. Net New Project Trip Generation Table:
PM Peak -Hour Trips
Land Use Daily (ADT) IN OUT
d. State assumptions and methodology for internal, link -diverted or passby trips:
Revised on 6124/10 E82 - Ti gffic Impact Analysis Worksheet Page 2 of 5
7. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts. Traffic
impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached)
and as identified in ECIC 18.82.120, except as otherwise provided for independent fee calculations
in ECDC 18.92.130.
CHANGIFI, IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If the
previous use was permitted prior to the adoption of Ordinance 3516 (effective date: O9/12/04),
the 2004 ECIC 18.82.1,20 impact fee shall be used.
Units in
ITE Land Use Category Per Unit square feet, Fee
Fee Rate # of dwelling,
I I I vfn. etc. I I
NewUse illf115 x 3, 7 6,,
X
P,riorUse c,
$ , =,i
LLI
Units in
ITE Land Use Category Per Unit square feet, Fee
Fee Rate # of dwelling,
vfD. etc.
1i—
.TION: $200-00 (+ consultant
TIK19,115-10 MAE
LM
'No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
Revised on 6124110 E82 - Traffic Impact Aouilysix Workvheel Page 5 of `5