Traffic Impact Analysis.pdfI
City of Edmonds
Traffic Impact Analysis Worksheet
Name of Proposed Project: 303 Apartment Building
Owner/Applicant
Glenn Safadago
Applicant Contact Person:
Glenn Safadago
Name Name
GBH Holdings, LLC, PO Box 1509
Street/Mailing Address _ Street/Mailing Address
Langley WA 98260
City State Zip City
Telephone: 360-321-7090 Telephone:
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
N/A
_.�..�..�..................................�......�...�.........-...................................................�...._..�............_. ._................ �. �..�............._._.._
Firm Name Contact Name
Telephone:
THRESHOLD LEVELS OF ANALYSIS
E-mail:
State Zip
Proiect Traffic Levels
1. Less than 25 pea -liour trips gen
Sections to Complete
l and 7 only (Worksheet/Checklist)
II. More than 25 peak -hour trips generated
All sections
1. PROJECT DESCRIPTION
a. Location - Street address: 303 Edmonds St
(Attach a vicinity map and site plan.)
b. Specify existing land use: Mixed Use (311 Edmonds St address) with gravel parking lot
c. Specify proposed type and size of development: Multi -family (3) story apartment building
9 units (# of residential units and/or square footage of building)
Revised on 6124110 E82 - Traf'ic Impact Analysis Worksheet Page 1 of 5
d. Date construction will begin and be completed: After permit approval, possible January 2016
e. Define proposed access locations: No vehicular access to site, trash and recycling
truck access to be off of alley, pedestrian access from Edmonds St
f. Define proposed sight distance at site egress locations: N/A
µµW
2. TRIP GENERATION
Source shall be the Eighth Edition of the Institute of Transportation Engineers (ITE) Trip Generation
manual. For independent fee calculations, the current edition of the ITE manual may be used.
ADT = Average Daily Traffic
PM Peak -hour trips (AM, noon or school peak may also apply as directed by the City Engineer)
a. Existing Site Trip Generation Table:
PM Peak -Hour Trips
Land Use Daily (ADT) I IN I— OUT
b. Proposed Project Trip Generation Table:
PM Peak -Hour Trips
Land Use Daily (ADT) IN OUT
c. Net New Project Trip Generation Table:
PM Peak -Hour Trips
Land Use Daily (ADT) IN OUT
d. State assumptions and methodology for internal, link -diverted or passby trips:
Revised on 6124/10 E82 - Traffic Impact Analysis Worksheet Page 2 of 5
3. TRIP DISTRIBUTION
Prepare and attach a graphic showing project trip distribution percentages and assignments. For
developments that generate over 75 peak -hour trips, the City Engineer reserves the right to require
trip distribution to be determined through use of the City traffic model.'
4. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY
a. Have sight distance requirements at egress location been met per AASHTO requirements?
b. Intersection Level of Service (LOS) Analysis:
Intersections to be evaluated shall be determined by the City of Edmonds Traffic Engineer
Existing Conditions
LOS
Year of Opening
LOS
....�.------------------------------ �........______....____..........____.......
I
Five Years Beyond Change of
LOS
Land Use
c. Describe channelization warrants:
(Attach striping plan.)
d. Vehicle Storage/Queuing Analysis (calculate 50% and 95 % queuing lengths):
50% 1 95%
Existing Conditions
Year of Opening
IFive Years Beyond Change of I
Land Use
e.. If appropriate, state traffic control warrants (e.g. stop sign warrants, signal warrants):
f. Summarize local accident history2 (only required for access to principal and minor arterials):
Available upon request at City of Edmonds Development Services Department
2 Available upon request at City of Edmonds Police Department
Revised on 6/24//0 E82 - Traffic Impact Analysis Worksheet Page 3 of 5
5. TRAFFIC VOLUMES
Provide the following and other planned development traffic within the city.'
a. Describe existing ADT and peak -hour counts (less than two years old), including turning
movements, on street adjacent to and directly impacted by the project.
b. Describe the estimated ADT and peak -hour counts, including turning movements, the year the
project is fully open (with and without project traffic).
c. Describe the estimated ADT and peak -hour counts, including turning movements, five years
after the project has been fully open (with and without project traffic).
d. State annual background traffic growth factor and source:
6. LEVEL OF SERVICE (LOS) ANALYSIS
a. Summarize Level of Service Analysis below and attach supporting LOS analysis documentation.
Provide the following documentation for each arterial street or arterial intersection impacted by
ten or more peak -hour trips. Other City -planned developments' must also be factored into the
LOS calculations.
Existing Conditions
Year of Opening
Five Years Beyond Change of
Land Use
LOS I I LOS
Existing I I Delays
With Project J I Without Project
With Project J I Without Project
b. Note any assumptions/variations to standard analysis default values and justifications:
1 A list of planned developments are available at the City upon request for public records
Revised on 6/24/10 E82 - Traffic Impact Analysis Worksheet Page 4 of 5
7. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts. Traffic
impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached)
and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations
in ECDC 18.82.130.
❑ CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If the
previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04),
the 2004 ECDC 18.82.120 impact fee shall be used.
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp. etc.
New Use $ X
Prior Use II I $ II X I I
New Use Fee: $ - Prior Use Fee: $ - $ t
X NEWDEVELOPMENT
ITE Land Use Category
New Use 1 220
❑ OTHER
Per Unit
Fee Rate
$ 776.56 II X
Units in
square feet,
# of dwelling,
vfp, etc.
—
9 units
Fee
1 $ 6,989.04
MITIGATIM FFF. RFC 0MMF.NT)ATTQN-
INDEPENDENT FEE CALCULATION: $200.00 (+ consultant fee)
TOTAL TRAFFIC IMPACT FEE $
City of Edmonds, Engineering Division Approval Date
' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
Revised on 6/24/10 E82 - Traffic Impact Analysis Worksheet Page 5 of 5