Traffic Impact Analysis.pdfName of Proposed Project:
MAR v112g'j7
CITY OF EDMONDSEDMONDS
TRAFFIC IMPACT ANALYST L, f,�w ufr
k i Ia����W'.
WORK Si;EET
Owner/Applicant:
&—" -4 ?!:-LWC71"y. .e.t e p
Name
Street/Mailing Address
City State Zip
Telephone:......... 7WZ.<�-_ %�7-
Applicant Contact Person:
Name
Street/Mailing Address
City State Zip
Telephone:
Traffic Engineer who prepared the Traffic Impact Analysis:
VX_ i ;_-
Firm Name Contact Name
1. PROJECT DESCRIPTION
a. Street address (if known): 7 4 25 2/0 TW ST- S
b. Location: ,A-sz
c. Specify existing land use:
Telephone
(Attach a vicinity map and site plan.)
l� Fce ►� % l y Kou sQ
d. Specify proposed type and size of development: a-�"'� d v c- �) S�✓1.� (Q ���%stsQ
e. When will the project begin construction and when will it be completed? b tZ zoo
f. Define proposed access locations:
A0;6
g. Define proposed sight distance at site egress locations:
�/ _ _...... .: i
L c3 [� fe �r el r-
Page I
t OV
a.
0
C.
Land Use
Daily (ADT)
PM Peak -Hour Trips
IN OUT
d.�' ate assumptions and methodology for internal, link -diverted or passby trips:
Page 9
3. TRIP DISTRIBUTION
Prepare and attach a graphic showing project trip distribution percentages and assi
4. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY
MSI
a. Have sight distance requirements at egress location been met per AASI- 11/requirements?
b. Intersection Level of Service Analysis
• Existing Conditions
LOS _._....�._._. .......... Delays
• Year of Opening
LOS .....__........................ _ Delays
• Five Years Beyond Change of Land Use
LOS ... Delays
(Intersections to be evaluated s tw','
all be determi.n
c. Describe channelization warren /
by the City of Edmonds Traffic Engineer.)
4
(Attach striping plan.)
d. Vehicle Storage/Queuing Aual;sis calculate 50% and 95 % queuing lengths):
50% 95%
• Existing Conditions
• Year of Opening
• Five Years Beyond
Change of Land/1
e. If appropriate, state tot.
sign and signal warrants:
f. Summariz/llocal accident history
Paize 3
5. TRAFFIC VOLUMES '
a. Describe existing ADT and peak -hour counts, including turning movements, on street a scent to and
directly impacted by the project.
b. Describe the estimated ADT and peak -hour counts, including turning :cryo ctnents, the year the project is
fully open (with and without project traffic).
c. Describe the estimated ADT and peak -hour counts, inc
project has been fully open (with and without project tr
d. State annual background traffic J&,o t(.h factor 0d source:
6. LEVEL OF SERVICE ANALYSIS
turning movements, five years after the
Summarize Level of Service Analysis 'ow and attach supporting LOS analysis documentation. Provide
the following documentation for c arterial street or arterial intersection impacted by ten or more peak -
hour trips. Other City -planned dev of ments must also be factored into the LOS calculations.
li"Xisting LO
Existing Condition:
Year of O penin
With Project:
Without,roiect:.
Page 4
Five Years After Opening LOS:
With Project:._.
Without Project:
Note any assure pt:i
ons to standard analysis default values and justifications:
7. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact
fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130.
li, yy ��Vj
P'
1✓ IAll l'Aw� IM .iM� � FM1 '�A
S \ENGR\Da 01\Cily Projeds\TIA 6uide1ines\Tra0nVAna1yWork 9-04.doc
Page 5
a� taz- _ri
z 9
ANrw;
D D p p`
C7pppp0 pampa Q0
O0C7D
M' wNOS, ❑ L—]
E S A T 1 60 1 -► so
.
�►u r 5 ukirs � � �� "c
11 �ta.a.
pHA• _ 1
9 1" . !
Z
F-
Hom