Loading...
Traffic Impact Analysis.pdfName of Proposed Project: MAR v112g'j7 CITY OF EDMONDSEDMONDS TRAFFIC IMPACT ANALYST L, f,�w ufr k i Ia����W'. WORK Si;EET Owner/Applicant: &—" -4 ?!:-LWC71"y. .e.t e p Name Street/Mailing Address City State Zip Telephone:......... 7WZ.<�-_ %�7- Applicant Contact Person: Name Street/Mailing Address City State Zip Telephone: Traffic Engineer who prepared the Traffic Impact Analysis: VX_ i ;_- Firm Name Contact Name 1. PROJECT DESCRIPTION a. Street address (if known): 7 4 25 2/0 TW ST- S b. Location: ,A-sz c. Specify existing land use: Telephone (Attach a vicinity map and site plan.) l� Fce ►� % l y Kou sQ d. Specify proposed type and size of development: a-�"'� d v c- �) S�✓1.� (Q ���%stsQ e. When will the project begin construction and when will it be completed? b tZ zoo f. Define proposed access locations: A0;6 g. Define proposed sight distance at site egress locations: �/ _ _...... .: i L c3 [� fe �r el r- Page I t OV a. 0 C. Land Use Daily (ADT) PM Peak -Hour Trips IN OUT d.�' ate assumptions and methodology for internal, link -diverted or passby trips: Page 9 3. TRIP DISTRIBUTION Prepare and attach a graphic showing project trip distribution percentages and assi 4. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY MSI a. Have sight distance requirements at egress location been met per AASI- 11/requirements? b. Intersection Level of Service Analysis • Existing Conditions LOS _._....�._._. .......... Delays • Year of Opening LOS .....__........................ _ Delays • Five Years Beyond Change of Land Use LOS ... Delays (Intersections to be evaluated s tw',' all be determi.n c. Describe channelization warren / by the City of Edmonds Traffic Engineer.) 4 (Attach striping plan.) d. Vehicle Storage/Queuing Aual;sis calculate 50% and 95 % queuing lengths): 50% 95% • Existing Conditions • Year of Opening • Five Years Beyond Change of Land/1 e. If appropriate, state tot. sign and signal warrants: f. Summariz/llocal accident history Paize 3 5. TRAFFIC VOLUMES ' a. Describe existing ADT and peak -hour counts, including turning movements, on street a scent to and directly impacted by the project. b. Describe the estimated ADT and peak -hour counts, including turning :cryo ctnents, the year the project is fully open (with and without project traffic). c. Describe the estimated ADT and peak -hour counts, inc project has been fully open (with and without project tr d. State annual background traffic J&,o t(.h factor 0d source: 6. LEVEL OF SERVICE ANALYSIS turning movements, five years after the Summarize Level of Service Analysis 'ow and attach supporting LOS analysis documentation. Provide the following documentation for c arterial street or arterial intersection impacted by ten or more peak - hour trips. Other City -planned dev of ments must also be factored into the LOS calculations. li"Xisting LO Existing Condition: Year of O penin With Project: Without,roiect:. Page 4 Five Years After Opening LOS: With Project:._. Without Project: Note any assure pt:i ons to standard analysis default values and justifications: 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. li, yy ��Vj P' 1✓ IAll l'Aw� IM .iM� � FM1 '�A S \ENGR\Da 01\Cily Projeds\TIA 6uide1ines\Tra0nVAna1yWork 9-04.doc Page 5 a� taz- _ri z 9 ANrw; D D p p` C7pppp0 pampa Q0 O0C7D M' wNOS, ❑ L—] E S A T 1 60 1 -► so . �►u r 5 ukirs � � �� "c 11 �ta.a. pHA• _ 1 9 1" . ! Z F- Hom