Loading...
Traffic Impact Worksheet.pdfCity of Edmonds RECEIVED Traffic Impact Analysis Worksheet Name of Proposed Project: Miah Food LLC (Always Fresh) Owner/Applicant Miah Food LLC (Mich Young) Name 19833 8th Avenue W. Street/Mailing Address Lynnwood WA 98036 City State Zip Telephone: 425-243-7998 Applicant Contact Person: Franklin Ng, Architectural Werks Name 11416 98th Ave NE, Suite 200 Street/Mailing Address Kirkland WA 98033 City Telephone: 425-823-2244 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Telephone: THRESHOLD LEVELS OF ANALYSIS Contact Name E-mail: State Zip Proiect Traffic Levels Sections to Complete I. Less than 25 peak -hour trips generated 1 and 7 only (Worksheet/Checklist) II. More than 25 peak -hour trips generated All sections 1. PROJECT DESCRIPTION a. Location - Street address: 22315 WA -99, Suite K&L - see architectural drawings A0.1 & A1.0 (Attach a vicinity map and site plan.) b. Specify existing land use: Site is zone general commercial, existing use of tenant space is general office ", � Av"'Wta n [ 6� New use of tenants ace to be commercial c. Specify proposed type and size of development: p kitchen in 2,125 square feet (# of residential units andlor square footage of building) Revised on 6/24/I0 E82 -Traffic Impact Analysis Worksheet Page I of 5 d. Date construction will begin and be completed: Construction to begun early 2016 following permitting76-8 week duration e. Define proposed access locations: Existing site_..a_cc_ess can be accessed through the service drive on the rear of the building to minimize I mpact on the other businesses. £ Define proposed sight distance at site egress locations: _EXj5J1pg site earessloca have, sight distances in excess of 300 feet, no change 2. TRIP GENERATION Source shall be the Eighth Edition of the Institute of Transportation Engineers (ITE) Trip Generation manual. For independent fee calculations, the current edition of the ITE manual may be used. ADT = Average Daily Traffic PM Peak -hour trips (AM, noon or school peak may also apply as directed by the City Engineer) a. Existing Site Trip Generation Table: PM Peak -Hour Trips Land Use Daily (ADT) IN OUT b. Proposed Project Trip Generation Table: PM Peak -Hour Trips Land Use Daily (ADT) IN OUT c. Net New Project Trip Generation Table: PM Peak -Hour Trips Land Use Daily (ADT) IN OUT d. State assumptions and methodology for internal, link -diverted or passby trips: Revised on 6/24/10 E82 - Traffic Impact Analysis Worksheet Page 2 of 5 3. TRIP DISTRIBUTION Prepare and attach a graphic showing project trip distribution percentages and assignments. For developments that generate over 75 peak -hour trips, the City Engineer reserves the right to require trip distribution to be determined through use of the City traffic model.' 4. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY a. Have sight distance requirements at egress location been met per AASHTO requirements? b. Intersection Level of Service (LOS) Analysis: Intersections to be evaluated shall be determined by the City of Edmonds Traffic Engineer Existing Conditions LOS Delays Year of Opening LOS Delays Five Years Beyond Change of LOS Delays Land Use c. Describe channelization warrants: (Attach striping plan.) d. Vehicle Storage/Queuing Analysis (calculate 50% and 95 % queuing lengths): 50% 1 95% Existing Conditions Year of Opening Five Years Beyond Change of Land Use e. If appropriate, state traffic control warrants (e.g. stop sign warrants, signal warrants): f. Summarize local accident history2 (only required for access to principal and minor arterials): 1 Available upon request at City of Edmonds l evel;opinCnt Services Department 2 Available upon request at City of Edmonds 11oYice Departmeaat. Revised on 6/24/10 E82 -Traffic Impact Analysis Worksheet Page 3 of 5 5. TRAFFIC VOLUMES Provide the following and other planned development traffic within the city.1 a. Describe existing ADT and peak -hour counts (less than two years old), including turning movements, on street adjacent to and directly impacted by the project. b. Describe the estimated ADT and peak -hour counts, including turning movements, the year the project is fully open (with and without project traffic). c. Describe the estimated ADT and peak -hour counts, including turning movements, five years after the project has been fully open (with and without project traffic). d. State annual background traffic growth factor and source: 6. LEVEL OF SERVICE (LOS) ANALYSIS a. Summarize Level of Service Analysis below and attach supporting LOS analysis documentation. Provide the following documentation for each arterial street or arterial intersection impacted by ten or more peak -hour trips. Other City -planned developments 1 must also be factored into the LOS calculations. Existing Conditions Year of Opening Five Years Beyond Change of Land Use LOS I I LOS Existing I I Delays With Project J I Without Project With Project I u Without Project b. Note any assumptions/variations to standard analysis default values and justifications: 1 A list of planned developments are available at the City upon request for public records Revised on 6/24/10 E82 - Traffic Impact Analysis Worksheet Page 4 of 5 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. X CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Fee Rate # of dwelling, r lir, fW vfp, etc. New Use 814 $p ei ll "' etail $ 0.93 X 2,157 SF = $ 2,006.01 Prior Use 710gener8ill) lcq�i $ 2.07 X 2,157 SF = $ 4,464.99 New Use Fee: $ 2,006.01 Prior Use Fee: $ 4,464.99 = $ - 2, .5616" � 1 NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X d . ! OTHER INDEPENDENT FEE CALCULATION: $200.00 (+ consultant TOTAL TRAFFIC IMPACT FEE 1 $ of Edmonds, Engineering Division Approval Date No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. Revised on 6124/10 E82 - Traffic Impact Analysis Worksheet Page 5 of 5