Loading...
Traffic_Impact_Worksheet.pdfCity of • • ImpactTraffic Worksheet Name of Proposed Project: IC) 5 Z-- AL- 4 Owner/Applicant Applicant Contact Person: Name Name ,1 Street/Mailing Address Street/Mailing Address V")d Cit State Zip City State Zip Telephone: 42��A;- 6% :�- 1) oo Telephone: Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): W Firm Name Telephone: THRESHOLD LEVELS OF ANALYSIS Contact Name E-mail: Project Traffic Levels Sections to Complete L Less than 25 peals -hour trips generated 1 and 7 only (Worksheet/Checklist) Il. More than 25 peak -hour trips generated All sections 1. PROJECT DESCRIPTION a. Location - Street address: I U57 A- L b (Attach a vicinity snap and siteplan.) b. Specify existing land use: c. Specify proposed type and size of development: V i V VI IlU(1� of residential emits a�td/or sgnm�e footage of buildhig) Revised on 6/24/10 E82 -Traffic Impact Analysis Worksheet Page I of 5 d. Date construction will begin and be completed: f�) �- 1s) - ` 1 -f�� - 2V "3'e. Define proposed access locations: A) df f. Define proposed sight distance at site egress locations: 2-CC i 2. TRIP GENERATION Source shall be the Eighth Edition of the Institute of Transportation Engineers (ITE) Trip Generation manual. For independent fee calculations, the current edition of the ITE manual may be used. ADT = Average Daily Traffic PM Peals -hour trips (AM, noon or school peals may also apply as directed by the City Engineer) a. Existing Site Trip Generation Table: Land Use Daily (ADT) PM Peals -Hour Trips IN OUT b. Proposed Project Trip Generation Table: Land Use Daily (ADT) PM Peals -Hour Trips IN OUT c. Net New Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT d. State assumptions and methodology for internal, link -diverted or passby trips: Revised on 6/24/10 E82 - Traffic Impact Analysis PYorksheet Page 2 of 5 3. TRIP DISTRIBUTION Prepare and attach a graphic showing project trip distribution percentages and assignments. For developments that generate over 75 peals -hour trips, the City Engineer reserves the right to require trip distribution to be determined through use of the City traffic model. 1 4. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY a. Have sight distance requirements at egress location been met per AASHTO requirements? b. Intersection Level of Set -vice (LOS) Analysis: Intersections to be evaluated shall be deterniined by the City ofEdmoiids Traffic Engineer Existing Conditions LOS 95% Delays Year of Opening LOS Delays Five Years Beyond Change of Land Use Five Years Beyond Change of LOS Delays Land Use c. Describe channelization warrants: (Attach striping plan.) d. Vehicle Storage/Queuing Analysis (calculate 50% and 95 % queuing lengths): e. If appropriate, state traffic control warrants (e.g. stop sign warrants, signal warrants): f. Summarize local accident history (only required for access to principal and minor arterials): 1 Available upon request at City of Edmonds Development Services Department 2 Available upon request at City of Edmonds Police Department Revised on 6/24/10 E82 - Traffic Impact Analysis tVorksheet Page 3 ol'5 50% 95% Existing Conditions Year of Opening Five Years Beyond Change of Land Use e. If appropriate, state traffic control warrants (e.g. stop sign warrants, signal warrants): f. Summarize local accident history (only required for access to principal and minor arterials): 1 Available upon request at City of Edmonds Development Services Department 2 Available upon request at City of Edmonds Police Department Revised on 6/24/10 E82 - Traffic Impact Analysis tVorksheet Page 3 ol'5 5. TRAFFIC VOLUMES Provide the following and other planned development traffic within the city.' a. Describe existing ADT and peals -hour counts (less than two years old), including turning movements, on street adjacent to and directly impacted by the project. b. Describe the estimated ADT and peals -hour counts, including turning movements, the year the project is fully open (with and without project traffic). c. Describe the estimated ADT and peals -hour counts, including turning movements, five years after the project has been fully open (with and without project traffic). d. State annual background traffic growth factor and source: 6. LEVEL OF SERVICE (LOS) ANALYSIS a. Summarize Level of Service Analysis below and attach supporting LOS analysis documentation. Provide the following documentation for each arterial street or arterial intersection impacted by ten or more peak -hour hips. Other City -planned developments 1 must also be factored into the LOS calculations. b. Note any assumptions/variations to standard analysis default values and justifications: 1 A list of planned developments are available at the City upon request for public records Revised on 6124110 E82 - Traffic Impact Analysis iil'orksheet Page 4 of 5 LOS LOS Existing Conditions Existing Delays Year of Opening With Project Without Project Five Yeats Beyond Change of Land Use With Project Without Project b. Note any assumptions/variations to standard analysis default values and justifications: 1 A list of planned developments are available at the City upon request for public records Revised on 6124110 E82 - Traffic Impact Analysis iil'orksheet Page 4 of 5 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, of , etc. New Use $ X = Prior Use $ X LewUse Fee: $ Prior Use Fee: $ _ $ I NEW DEVELOPMENT ITE Land Use Category New Use 121 ❑ OTHER Units in Per Unit square feet, Fee Rate # of dwelling, vt, etc. jcj X I Fee _ $11 33 MITIGATION FEE RECOMMENDATION: INDEPENDENT FEE CALCULATION: $200.00 + consultant fee $ TOTAL TRAFFIC IMPACT FEE $ i�y, r . City of Eelmonds, Engineering Division Approval Date 1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. Revised on 0/29/10 E82 - "Traffic Impact Analysis IVorksheel Page 5 oJ'5