UST 22206 95th Place W.pdfHEATING OIL POLLUTION LIABILITY INSURANCE PROGRAM FACILITATED CLEANUP METHOD CLOSE OUT PROJECT FIELD REPORT SITE LOCATION:, 22206 95th Place West, Edmonds, Washington PROPERTY OWNER: Maureen Wood SERVICE PROVIDER: Filco Company, Inc. TANK 0 Tank size: 500 gallons; lu--S-Tl or AST 0 Date removed:- December 15, 2011 0 Tank condition: Surface corrosion and holes in tank. 0 Tanks disposed of at: Seattle Iron 9 New Tank installed size: NA gallons; UST or AST 0 Lines: NA 0 Vent: NA HEATING 011, INFORMATION 0 Estimated amount of oil lost: Unknown 0 Amount of oil pumped from UST into temporary tank: NA 0 Amount of water pumped from tank: 0 gallons 0 Oil and/ or water disposed of at: Emerald Services SOILS ENCOUNTERD IN TANK EXCAVATION • Native Soil: [�j:v n]el a ,n 0 'rank Back fill: Gravel Sand ,oam Silt Clay Glacial "Till "Type —17- pit run topsoil CONTAMINATED SOIL REMOVAL • Amount Excavated: 18.25 tons. • Soil hauled to: Waste Management SAMPLING LOG • Initial sample in excavation pit: 19,000 PPM Sample results after removal of contaminated soil: • B -- Base of excavation: • C -- North wall of excavation: • D -- South wall of excavation: • E -- SW corner of excavation: • F -- East wall of excavation: • G -- West wall of excavation: BIOREMEDIATION 3,600 PPM 460 PPM 16,000 PPM 290 PPM <50 PPM 14,000 PPM • Installed a perforated PVC pipe grid in the base of the excavation at a height above the contaminated soil. • Treatment #1: • Treatment #2: • Treatment #3: • Riser removed Date: February 8, 2012 Date: March 7 2012 Date: Anri15.2012 Date: April 5, 2012 UNDERGOUND UTILITIES • Utilities encountered: Sprinkler I.,ine SITE RESTORATION • Site restoration consisted of: None 2