Loading...
Value Village - Compaction tests.pdfEarth Solutions NW, LLC FAX COVER SHEET ESNW Reference No.: / �73 Date: 31Z 2- 12 C5 t0 'To: FAXNo- Subject: No. of Pages: (if you do not receive all of this FAX or have any questions, please call (425) 284-3300.) From: EaAh Solutions NW, LLC FAX (425) 284-2855 Transmitted By: Comments: CC: I -. 2: . . . . ...... 3 4: *riginal copy to be mailed: El Yes ATTN: TTN: ATM ATM AT7N: This FAX is intended solely for the use of the individual to whom it is addressed and may contain information that is pr�ivileged, confidential or otherwise exempt from disclosure under applicable law, if the receiver of this FAX is not the intended recipient or the ftr Ire hereby noed that any dissemination, distribution or copying of this communication is strictly prohibited. 288i I — 152 M Ave NFRedmond, WA 98052 (425) 284-3300 FAX (42:5) 284-28515 T'oll Free (866) 336-8710 T -CA SsBa_�Basa_� suoTinjos q-4je3 WWTT :6 010a 2;Z JeW Grading Contractor Grading Foreman Checked By.�11 Mr. Roo ter Plumbing Tom Are Approved Plans/Pe rmits Onsite ❑ YES I --.f NO Project No. Permit No. Earth Solutions NWLLc Field Rep. Project No. Page of Report No, Fill Test Dry Tyler. F ES -1737 111 1 Time On Site me Ofl Site Date Day of Week .i 2881 152n° Ave. N.E. Redmond, WA 98052 Maximum (425) 284-33,04 FAX (425) 284-2855 TOLL FREE: (8666) 366-8710 11:00 r,".2-30 3/19/2010 Fri. Travel Time % Mrs. Charged DAILY FIELD REPORT 1 7Z Ave W, 1, 0 -3.5 2.50 Project Nama 8.89 Job Location 95 2I Client 1 Owner 21558 Hwy 99 Utility -1.5' 21558 Hwy 99, Edmonds 135.5 7.92 MT, Rooter Plumbing General Contractor 3 {general Contractor's Superintendent 8' E of Centerline Received Onsite By Grading Contractor Grading Foreman Checked By.�11 Mr. Roo ter Plumbing Tom Are Approved Plans/Pe rmits Onsite ❑ YES I --.f NO Project No. Permit No. As requested by the client, ESNW was onsito to observe backtilfing of utility trench onsite. While was observed; 0 ESNW rep. was onsite to observed the contractor backfilling a utility trench that extended into the eastern lane of 72nd Avenue West. Imported 518 minus crushed rock was used to backfill. Contractor had placed some backfill prior to ESNW reps arrival due to an exposed gas utility line. ESNW rep. took compaction tests within the road right of way as directed by the client. ESNW rep. observed the contractor placing 12 inch loose thickness lifts of 518 minus crushed rock within the right of way. The contractor used a jumping jack to compact the lifts of backfill. ESNW rep. observed dense backfill within the tested areas. The compaction tests reported above show adequate compaction of 95 percent or higher within the tested areas. ESNW will return when requested, Tyler ,J Fischer COPY TO: CONTINUED (IN NEXT PAGE ❑ a'd 998i3t19agat7 suoi-znioS L14 Jg3 wutll t6 0102 22 -Jell Referertce Maximum Fill Test Dry °16 of Test Test Location Elevation Compaction Dry Density Moisture Density Maximum Number Curve lbeJou.tt, % Ibr,otdu. Dry Density 1 7Z Ave W, 12'E of Centerline -3.5 1 135.5 8.89 129.8 95 2I 72nd Ave W, 5' E of Centerline -1.5' 1 135.5 7.92 132.2 97 3 72nd Ave W, 8' E of Centerline SG 1 135.5 7.08 130.4 96 As requested by the client, ESNW was onsito to observe backtilfing of utility trench onsite. While was observed; 0 ESNW rep. was onsite to observed the contractor backfilling a utility trench that extended into the eastern lane of 72nd Avenue West. Imported 518 minus crushed rock was used to backfill. Contractor had placed some backfill prior to ESNW reps arrival due to an exposed gas utility line. ESNW rep. took compaction tests within the road right of way as directed by the client. ESNW rep. observed the contractor placing 12 inch loose thickness lifts of 518 minus crushed rock within the right of way. The contractor used a jumping jack to compact the lifts of backfill. ESNW rep. observed dense backfill within the tested areas. The compaction tests reported above show adequate compaction of 95 percent or higher within the tested areas. ESNW will return when requested, Tyler ,J Fischer COPY TO: CONTINUED (IN NEXT PAGE ❑ a'd 998i3t19agat7 suoi-znioS L14 Jg3 wutll t6 0102 22 -Jell