Vehrs TIA - 1040 6th AVe S.pdfName ddW Piroposed 11roject:
Owner/Applicant
Name
J
Strect/PAading Ad(ftCss
State Zip
Telephom'r
Apq'ifitAnt, Contact - Persa�im:
Strect,Mr.i,ding Addrcss
C"ity
TnIffic 1"Ilghle-er, who pirepaired the Traffic bripact.Analysis (if aipplic-able):
Finn]Nhame
Telephone:
Contact Natne
State Z�p
THRE'SH01,D LEVELS, OTF ANALYSIS
PirojectTr's i
affle Levels �A) Coln [etc
------- - ------ --
TT. L,ess than 25 peak -hour trips generated I and 7 only (Workshect/C.beck . list)
. ........... . ... - - - --- --- - ... . . ......
ore than 25 peak -hour trips generated All sections
i. mwji�:T.cr j,)ESCRIPTION
✓"L
�1. Location - Strect addruss.,
AlUrch a viduftlp us ap and vileplanj
b. Specify existing land use:
o�'j I(,,, I N'? Yw'(rc lailwcI Anoiv""is of
I L IiN �M'(2
Ity
Edrnurids
af""
'1111woiit
'T ra ffi c
I rn �p a ct�
A ri a I y si s
VV o ir ks �h e e t
0041111M p
'qO
Name ddW Piroposed 11roject:
Owner/Applicant
Name
J
Strect/PAading Ad(ftCss
State Zip
Telephom'r
Apq'ifitAnt, Contact - Persa�im:
Strect,Mr.i,ding Addrcss
C"ity
TnIffic 1"Ilghle-er, who pirepaired the Traffic bripact.Analysis (if aipplic-able):
Finn]Nhame
Telephone:
Contact Natne
State Z�p
THRE'SH01,D LEVELS, OTF ANALYSIS
PirojectTr's i
affle Levels �A) Coln [etc
------- - ------ --
TT. L,ess than 25 peak -hour trips generated I and 7 only (Workshect/C.beck . list)
. ........... . ... - - - --- --- - ... . . ......
ore than 25 peak -hour trips generated All sections
i. mwji�:T.cr j,)ESCRIPTION
✓"L
�1. Location - Strect addruss.,
AlUrch a viduftlp us ap and vileplanj
b. Specify existing land use:
o�'j I(,,, I N'? Yw'(rc lailwcI Anoiv""is of
Date consumiar.t. wffl and be conq)lCtcd:
as. DeRno proposed access localions;
"" I ,V , /,� 7
1-)(�fine ptoposed MgM (�Hsitam:,T at site egress Jocad ons:
I TRIP GINN ERATIM14
Sume WmH be Ow MOM Mon of% buti[ow ofTninspoitation Engirwers, (ITE) Trip Generation
n,mnval, Por independont fcc� C"alm-flations, die cur,reni, edifirm of thr,,� FIT n-utnural nliay 1,,)e usc&
ADT z::::= Avmge [);.I j I Y � raffic
PAd ITaklum hips (AM, mmi (m-sclool peak nay ako apply as (fireded by t1ke (,,,'�ty )ngineer)
C111. Existing um, iteTrjj:.) CiencrationTable:
PM Peak--Hi,:)ur'Thps
Land Use Dafly (A.DT) ------- 1 1 r r
A.. . ................ . . .......... . . . ........ ..... .. IL . . ..... . . ...... -..— .. ....... ... . . . .... .... ....... . ....
b, Propowd Prqject 'Trip Gencration 'rablc�
PM Peak -Hour Tnps
Land Use My (ADT)
L.. . ... ......... . ........ . . . . . . ................... ...................... . .. .. ...... .............. ---- . ..... . . ............... . ...... .. .
v 14otT4evillejeetT6pCknoAdonitble:
PM Peak -Hour Trips
Land the Daily (AIL)")MJT
. . . ..... . . . . ...... . . ....... . .......
(1, State assuniptions and rndhodoWgy for in(crnal, Hnk divcrtcd or passby tdps�
6,m, /,""? ? i,� oj,)�r In"poo H`ol �, yboo� Py P 2 N ',,
1
7. MITIGA`110N llE( 01%IMENI)ATIONS
Sl.ate recomm4,',indc,,d rricastires and ft,,es io riaUgatc rnol(,��i.A specK4, iraffic impacts, Traffic,
Sh',d] dss, calculau,d fkmn the, Road b-n1jact F'ee lZate Study Table 4• (attached)
and uis 'Idend fied 41 F',C'D(l_" d8,82 120, exi(,epl_ws prov ided 1"ot calcuk"Itkan's
in ECDC d 8,8 2. d 30.
CHANGE, IN
. . ..... . ... . ... ....
Fee -('or prior usc, ShaH betmsed on, fee esm[Aished at the time the priur use was, pertnitted. Ifthe
prevJous use Was pern-litted pixie to the adoptlion of Ordinance d516 (effeclive (hflc� 09/1,2/0d),
the 2004 ECI )C 18.82 � 120 impact The shall be use&
Units 61
Per Ljnit sqllrare f6d
FIT Land �JseCatcgoly
New lJseW 0
Prim- Use x
Se 17, cc: riOr , S'e I ee'�
I � NEW'..D.,EVELOPMENT
ITE Land LhI30 Category Per LjT14
New Jr
0T."HER
a
Units in
square feet,
# of dwelting,
VO), etc.
MITIGATION FEE RECOMMENDATION-_ . .... .
INDEPENDENT FEE CALCULATION: $200.0ULL,-=(In——itiv—,InLknL $
TOTAL,rR.AFFIC IMPACTFEE
I G','lo �n uR"'s wa 1 4k o'o ]Iaay a �"d i ht", g i'i vum" lour asps ii I q'm c, I, h:� -"' � ,.'dc I hq o ion vc�"" u I a ovg�a 4ivc_