Loading...
Water connection agreement.pdftile, 1 9 CITY OF EDMONDS 121 5TH AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 • FAX (425) 771-0221 Website: wwadedmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering February 28, 2007 Mr. Rob Michel Michel Construction, Inc. 7907212 1h Street SW # 102 Edmonds,WA 98026 GARY HAAKENSON MAYOR RE: Installation of Fire Line and 2 Inch Domestic Connection — 320 Walnut Street Dear Rob: The City has awarded a capital project construction contract that will include installation of new water main along Walnut Street from 3rd Avenue S. to 4th Avenue S. You have requested that, during the installation of the City's water main, we have the contractor install a new 4 inch fire line and 2 inch domestic line per City of Edmonds Standard detail E 7.18 (and as shown on the enclosed drawing) to the property that you plan to develop at 320 Walnut Street. We agree to have our contractor install the fire/domestic connection as requested, provided that you submit payment to the City, prior to installation of the connection, to cover the estimated full cost to the City of this additional contract work, including the City's administrative cost. The estimated cost for the fire/domestic connection installed under the contract, based upon the contract unit prices and estimated quantities, will be $6,933.94 including sales tax, as indicated in the enclosed cost breakdown. We will also require an additional 15% to cover the estimated amount of the City's administrative costs. Therefore, the estimated total cost to you will be $7,974.03 as follows: • 1 Fire Line and 2 " Domestic Service Connection $6,367.25 • Plus: Sales Tax (8.9%) _ $ 566.69 • Subtotal $6,933.94 • Plus: 15% City Admin Cost = $1,040.09 • Total $7,974.03 The $6,367.25 amount is based upon the contract unit prices and estimated quantities. It assumes that no unforeseen conditions are present for your fire/domestic connection installation such as dewatering, which we believe will be the case. However, if any unforeseen conditions are discovered directly affecting the fire and domestic line installation, or if the actual quantities are greater than those estimated, it will increase the contract cost to the City based upon the contract unit prices and actual quantities installed for these items, and you will be required to provide additional payment in the amount of Incorporated August 11, 1890 the additional contract cost for these items plus 15% for City administrative cost. Likewise, if the actual quantities installed are less than the estimated quantities such that the contract cost to the City is less than the estimated cost, we will provide to you a refund of any overpayment. The fire and domestic connection to be installed will include all parts listed per City of Edmonds standard detail E 7.18 including stubbing the 4 inch and 2 inch lines to the right-of-way/property line, traffic control, shoring, restoration and connection to the City's water main in Walnut Street, for future connection of the structure you plan to construct on the lot. Upon installation, the fire and domestic water lines from the water main to the edge of the right of way will be owned and maintained by the City. In addition, the City's standard water connection charge and other applicable fees will still be required. If you want the City to install the requested fire and domestic lines to your property, please submit a check made payable to the City of Edmonds in -the amount of $7,974.03, with a cover letter confirming your understanding of the above conditions, addressed to Mr. Duane Bowman, Development Services Director, prior to March 7, 2007. Also, please return the enclosed drawing with the specific location along Walnut Street annotated as to where you want us to install the fire and domestic lines. It will be most helpful if you identify the location as a specific dimension from a distinctive surface feature, such as face of curb, survey monument, etc. If you have any questions, please don't hesitate to call Pam Lemcke or me at 771 0220. DAVID K. GEBERT, PE City Engineer Cc: Duane Bowman, Development Services Director Noel Miller, Public Works Director 2005 Waterline Replacement Project City of Edmonds E5JA1c183 Interwest Construction, Inc. Change Order #2 SCHEDULE F 80th PI W - Sierra Drive to end of Cul de Sac, Services Only Walnut Street 3rd Ave to 4th Ave CONTRACT/Change Order Item 1 Qtv 1 Unit LS Description 'Traffic Control $$ Unit Price 17� $ Total Price 17.000.00 2 1 LS 'Shorina and Safetv $ 3.000.00 $ 3.000.00 3 1 EA 8" x 8" Tee $ 550.00 $ 550.00 4 7 EA 8" RSGV $ 790.00 $ 5.530.00 5 1 EA 4" RSGV $ 590.00 $ 590.00 6 2 EA 8" x 4" Tee $ 500.00 $ 1.000.00 7 1 EA 8" x 8" Cross $ 1200.00 $ 1.200.00 8 9 1 1 EA EA 8 -inch MJ Plua 2" RSGV $ $ 200.00 390.00 $ $ 200.00 390.00 10 350 LF ,8 -inch Class 52 D.I.P. $ 32.00 $ 11.200.00 11 33 LF 4 -inch Class 52 D.I.P. $ 27.00 $ 891.00 12 1 LS 2 -Inch Domestic Parts $ 1.600.00 $ 1.600.00 13 380 LF Import Backfill for 8 -inch D.I.P. $ 2.00 $ 760.00 14 380 LF Import Base for 8 -inch D. 1. P. $ 0.25 $ 95.00 15 4 EA 3/4" Service - short side $ 450.00 $ 1.800.00 16 9 EA 3/4" Service -Iona side $ 850.00 $ 7.650.00 17 1.266 SF Temporary Cold Mix Patch $ 2.00 $ 2.532.00 18 1.266 SF Class B Trench Patch 2" Death $ 2.20 $ 2.785.20 19 13 EA Water Meter Assemblv $ 380.00 $ 4.940.00 20 2 EA 'Special Connection $ 3.000.00 $ 6.000.00 21 1 LS Restoration - 80th PI. $ 3.000.00 $ 3.000.00 22I' I CY Control Density Fill $ 80.00 $ 1.440.00 Subtotal $ 74,153.20 8.9% Tax $ 6,599.63 TOTAL SCHEDULE F TOTAL $ 80,752.83 Item 1 Qtv 0 Unit LS Description Traffic Control $ Unit Price 17,000.00 $ Total Price - 2 0 LS Shorinq and Safetv $ 3.000.00 $ - 3 4 0 2 EA EA 8"x8" ee ''8" RSGV $ $ 550.00 790.00 $ $ - 1.580.00 5 1 EA 4" RSGV $ 590.00 $ 590.00 6 2 EA 8" x 4" Tee $ 500.00 $ 1.000.00 7 0 EA 8" x 8" Cross $ 1.200.00 $ - 8 0 EA 8 -inch MJ Pluq $ 200.00 $ 9 1 EA 2" RSGV $ 390.00 $ 390-06- 10 0 LF 8 -inch Class 52 D.I.P. $ 32.00 $ - 11 33 LF 4 -inch Class 52 D.I.P. $ 27.00 $ 891.00 12 1 LS 2 -Inch Domestic Parts $ 1.600.00$ . 1.600.00 13 33 LF Import Backfill for 8 -inch D.I.P. $ 2.00 $ 66.00 14 33 LF Import Base for 8 -inch D. I. P_ $ 0.25 $ 8.25 15 0 EA 3/4" Service - short side $ 450.00 $ - 16 0 EA '314"Service-Iona side $ 850.00 $ - 17 0 SF Temporary Cold Mix Patch $ 2.00 $ - 18 19 110 0 SF EA Class B Trench Patch 2" Death Water Meter Assemblv $ $ 2.20 380.00 $ $ 242.00 - 20 0 EA Special Connection $ 3.000.00 $ - 21 0 LS I Restoration - 80th Pl.$ 3,000.00 $ - 22 0 CY Control Density Fill $ 80.00 $ - Subtotal $ 6,367.25 8.9% Tax $ 566.69 TOTAL ROB MICHEL TOTAL $ 6,933.94 S:\ENGR\CAPITAL PROJECTS\E5JA 2005 watermainlproject spreadsheets\Change Order 2 Spreadsheet for Rob As DIP aid CL W x g P > (04 17 mi ZN� 3NI-1 3MIJ d'l'([ J, x d Z -1 or 0 0 U- 0 -joz U- M 0) w En x x (f) CDV) W w 0 U- U- . rn x :3 _j X - 00 F<CY - P Lu Ooza- wir o(ncnooO-Jz)E500 toO�XX-J(L ZWO + 4 a Ga 0 200!6 0 0 z to m o 0 00 C-) C-) Y Li- 0 _3 I Lu 0 w -i En 04 CO ro V) in Fl ul 8" UP -.— 9 � 0 Z M CL (n 0 x 00 C-) -J w 2 X X X M -J 0 U- m _jo > > > a C-9 x = z p �< - 000 .*Za- MOM OEOMW LLj< zwH lco 1.1* aC14 mco CO Go 0 0 < LL - w x R. Ld 0 r..Y MJ FL X MJ RSGV —\ (TYPICAL) 4' FL X MJ RSGV La 940 STYLE CAST IR❑N VALVE BOX AND EXTENSI❑N ACP SURFACE MATCH THICKNESS (3' MINIMUM) ZZIIIIIIIII�l imp _IND FLANGE WITH 2' FIPT THREAD 2' BRASS STREET ELLS - 3' BRASS NIPPLE MIPT ,2' RSGV (F,I,P,T, X F,I,P,T.) 2'' BRASS- MIPT x CTS PAC JOINT (IF COPPER) -MIPT x IPS PAC JOINT (IF POLY) u T'H 2' HI-M❑L POLY (160 PSI) A f2' STAINLESS STEEL STIFFENER AND MIPT X IPS PAC JOINTS REQUIRED 0 EE WATER SERVICE STD DETAIL E-7,6.1) a .. a CONC, BRICK SUPPORT MINw FL X� 4'' TEE MJ X 3 MI'N, � MJ D.I. LONG BODY COUPLING MJ FL X MJ RSGV —\ (TYPICAL) 4' FL X MJ RSGV La 940 STYLE CAST IR❑N VALVE BOX AND EXTENSI❑N ACP SURFACE MATCH THICKNESS (3' MINIMUM) ZZIIIIIIIII�l imp _IND FLANGE WITH 2' FIPT THREAD 2' BRASS STREET ELLS - 3' BRASS NIPPLE MIPT ,2' RSGV (F,I,P,T, X F,I,P,T.) 2'' BRASS- MIPT x CTS PAC JOINT (IF COPPER) -MIPT x IPS PAC JOINT (IF POLY) u T'H 2' HI-M❑L POLY (160 PSI) A f2' STAINLESS STEEL STIFFENER AND MIPT X IPS PAC JOINTS REQUIRED 0 EE WATER SERVICE STD DETAIL E-7,6.1) a .. a NOTE, ACDF SHALL BE SACK MIX DESIGN PER WSD❑T STANDARDS 2'-5/8' INSTALL 12' RIBBED PVC PIPE (ASTM D-3034) cSTC WHEN USING CDF BACKFILL ONLY (TYP FOR ALL VALVES) z spa � a M o w W e AY CONC, BRICK SUPPORT NUMBER OF BRICKS REQUIRED DEPENDS ON AMOUNT OF OVER EXCAVATI❑N _E, D: M REVISIONS STANDARD DETAIL APPROVED BY DATE D. GEBERT 8/17/06 FIRE LINE AND 2" DOMESTIC SERVICE CONNECTIONS (DETAILS) '� "-jo DATE 07/12/05 SCALE NTS DWG N0. E%.18