Loading...
Weber-Frntg Improv Mod.pdfWestern i 130070 Highway 99 South Everett, Washington 982014Engineers � (42) 356-2700 FAX (425) 358-2708 4 Inc. ............ SURVEYORS w Pi .MINERS - ENGINEERS 1 y f i August 20, 2007 f City of Edmonds Development Services 121 5th Ave No, Edmonds, WA 980207 425-771-0220 Ise. Frontage Improvement Modification Dear Planning and Development Services: This letter is in response for the requirement for the -twat sidewalk to be constructed along the sites frontage. Currently Mr. Ray Weber is in the process of construction review, with the city, for a three lot short plat on his property located at 23327 92nd Ave W. From the conditions of approval from the city„ frontage improvements are required for the development which includes.` 'I2-feet of asphalt from centerline of road, vertical curb and gutter and a -foot raised asphalt walkway.' Currently, a 5' walkway, curb and gutter exist of the western side of 92nd' ,Ave W. `rhe problem with the cities requirement for frontage improvements is that when the city reviewed the development across the street (directly to the west of the ;site) they did not require a frontage deviation to match the existing 301-foot RM on the north and south aides of the property. Since additional RAN was not taken, the frontage improvements do not match up with any other properties along 92nd Ave. Instead there is only room for 12-feet of asphalt and a vertical curb and gutter. Who ever was or is in charge of the review for construction drawings at the City, for the development to the west of the site, made an error in the location of the frontage improvements and did not allow enough RNV for the total improvements to the street.. In order to meet the cities requirement for frontage improvements along the frontage of the site, and to fix the problem that the city created, the applicant would like to waive the requirement for the ' raised asphalt walkway and to only install 12-feet of asphalt and a vertical curb and gutter, This would allow the existing frontage improvements on the west side of 92nd Ave to remain and vrould still provide minor frontage improvements along the east side of 92nd Ave. Also, since 92nd Ave dead ends approximately 125-feet to the south of the site, pedestrian access along the east side of 92nd Ave would not be a major issue. RAIDSERVER\2006k16774A\EngineeringkSid walk Variance Letter I-AND USE CONSULTANTS o CIVIL. ENGINEERS o LAND SURVEYORS:NGINtERING CORPORATION i i 3 6. The approval of the variance would IN the existing frontage improvements along the west side of 92nd Ave to remain. The variance would also resolve any future gation that may be imposed due to the cities poor N and management of the improvements in the public RNV. In conclusion, the approval of the variance woow the required frontage improvements minus the 5 -foot raised asphalt walkway, The variance would also allow the city to retain the existing storm drain system. If you have any questions regarding this letter, please contact me at 425-356-2700 or email meat jessej@w,esternengineers.com, Sincerely, ,Jesse J'arrell Project Manager RAI DSERVER\2006\06774NE ngineering\Sidewalk Variance Letter