Civil Plan Review Comments
Commercial Application :Date:
# BLD20090063 03/04/2009
Project Name/Address:
Harbor Square Athletic Club Addition / 160 West Dayton St
Contact Person/Address, Fax or E-mail:
Warren LaFon / FAX 425-774-0580
Reviewer: Edward Sibrel Division:Engineering
During review of the civil drawings for the proposed subdivision it was found that the following
information, corrections, or clarifications will need to be addressed. Please resubmit 3 copies of the
revised civil drawings and associated documents with a written response to each item to an Engineering
Technician. Please contact me at 425-771-0220 or by e-mail at sibrel@ci.edmonds.wa.us if you have
specific questions regarding these plan corrections.
Review 3:
Review 1: 03/04/09 Review 2:
Where helpful, previous review comments are retained for context.
CIVIL DRAWINGS________________________________________________________________________
1. There were no civil drawings included with the submittal
STORM DRAINAGE_______________________________________________________________________
1.Plans approved for a previous project show a city drainage easement that your project will encroach
into. Please show the extents of this easement (AFN 821035006), and where you intend to relocate the
storm line to city standards. Please be advised that the landowner of record will be required to grant an
easement to the city noting the new location of the storm system.
2.Show how the roof drains connect to the storm system.
3.Include a profile view of the relocated storm system. Include installation notes in the civils.
SEWER __________________________________________________________________________________
1.Show the location of the existing sewer system, so that the relocated water main and storm lines do not
conflict.
2.If the side sewer exiting the building exists within the construction envelope, please include its location
on the site plan.
WATER__________________________________________________________________________________
DATE E-MAILED 03/04/09 PAGE(s)
1 of 2
City of Edmonds
TH
121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORKS DEPARTMENT
Engineering Division
Civil Plan Review Comments
1. The project proposes to move the existing water main, the location of which is described by easement
AFN# 8303170256. To the extent that the new main falls outside of the legal description shall be granted by
the landowner of record to the city.
2. There exists neither installation plan nor details for the proposed water main relocation. Please include in
your next submittal all necessary specifications, details, and/or notes for said relocation, including but not
limited to: pipe material, bend and joint callouts, thrust blocking, connections; disinfection, pressure, and
purity testing; backfill and paving specs.
3. Fire hydrant shat be oriented & upgraded to Fire Department requirements.
4. Show where the water meter and RBPA are to connect to the main.
MOBILIZATION AND TESC_______________________________________________________________
1. Show on the civils where materials are to be staged.
2. There are no TESC notes on the plan.
3. Note on the plan that any contaminated soils encountered in the course of excavation shall be exported to
an approved facility for such soils.
GENERAL________________________________________________________________________________
1. A traffic control plan is recommended to successfully route customers and clients around the
construction.
2. A traffic impact study will be required to assess the impacts of the expanded business.
4. When the civils and building plans are nearing approval, a cost estimate is required for all onsite and
utilities work. The inspection fee will be based on 2.2% of 120% of all improvements, and the required
bond will be based on 120% of the approved estimate for the utilities work. Please keep the onsite work
separate from the utilities work on the estimate.
DATE E-MAILED 03/04/09 PAGE(s)
2 of 2