Westgate Chapel Pkg Lot Bond Corrections-1.pdf
December 18, 2009
Westgate Chapel
22901 Edmonds Way
Edmonds, WA 98026
SUBJECT: Site Improvement Maintenance Bond, Parking Lot
To Whom It May Concern:
The City of Edmonds Engineering Division, has performed the required two-year
maintenance inspection of the site improvements for Westgate Chapel parking lot. In order
for the Site Improvement Maintenance Bond to be released, the following corrections must
be made:
1. There are multiple areas where cracking has occurred in the installed concrete curb/gutter
and ramp panels that will need to be replaced. I have enclosed a site map marked with the
locations of the cracks. Enclosed are also photos of each area.
2. Yard debris was noticed in the swale near the storm outfall. Please remove and refrain
from using the swale for yard waste to prevent any future blockage of the storm outfall.
3. The catch basin at the southwest end of the parking lot needs to have leaves and silt
debris removed to prevent blockage of the drain.
Please call the Engineering Inspection line at 425-771-0220, ext. 1326 to request a final
inspection once the all repairs are complete.
Please feel free to call me with any questions you may have at 425-771-0220, ext. 1324.
Thank you,
JoAnne Zulauf
Engineering Technician
Public Works Department
zulauf@ci.edmonds.wa.us
cc: Permit bond file
Building