wet season work letter.pdf-117C. 1 Sc)0 CITY OF EDMONDS DAVE EARLING MAYOR 121 5th AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 • fax (425) 771-0221 www,edmondswa.gov DEVELOPMENT SERVICES DEPARTMENT September 21, 2016 Arne Gaenz gine c sko bi.cont, 8208 234"' Street SW Edmonds, WA 911026 RE: BLDs2015-1266/1267 - 1020 & 1024 Bell Street Dear Mr. Gaenz: The above referenced projects are located in an Earth Subsidence and Landslide Hazard Area subject to the provisions of the Edmonds Community Development Code (ECDC) Chapter 19. 10, which limits land development to the drier season of the year, specifically between May Ist and September 30th. All groundwork, including grading/excavation, drainage system installation, and foundation construction in areas subject to those provisions would have to be completed by September 30, 2016 and the site be winterized. For work of this nature to commence and/or continue past the ordinance deadline of September 30, 2016, the City requires a letter, stamped and signed from your geotechnical engineer of record to be submitted for review and approval, confirming that the sites are stable and work may start/continue without creating erosion or stability problems. If such extension is requested, it must include a detailed schedule of work that establishes a completion date. If the City does not receive such notice from your geotechnical engineer of record, it is understood that groundwork, as defined by ordinance, shall be stayed until May 1, 2017. Groundwork performed after September 30, 2016 must follow the specific guidelines detailed in the letter from the geotechnical engineer, including, but not limited to, the duration of the work, the type of equipment to use, any additional temporary erosion and sediment control provisions that are required, and the applicability of special inspections or other similar measures to verify conformance with the specified guidelines. Weekly monitoring reports from the geotechnical engineer or designated erosion sedimentation control supervisor are required to be submitted to the City inspector upon request. In the case that the groundwork is stayed, it is possible to commence the groundwork prior to May 1, 2017 provided an evaluation by the geotechnical engineer confirms that the site conditions are stable and work may start without creating erosion or stability problems. This would, of course, need to be submitted for approval prior to commencing work. If you have any questions, please feel free to contact me at 425-771-0220 during City business hours. Sig rcl, C r6des R. Miller Plans Examiner Cc: Engineering Division Incorporated August 11, 1890 Sister City - Hekinan, Japan