Wood El-Burnstead Response rcvd-03.29.2013.pdfN - I
learlie, M(-;Cormell
City of Eon moria
121511, Ave 1\1
Edrii WA 9,13020
R E, Subdivision F -He #: pin20070018
F"Irojec,t: WoodwaY I.E.Ierrpentay PRIX 27 lot Plat
filroject Address: 23708 10/ith Ave W
Response to City ofEcIrrionds
Bluelirie Job No. 06-033
.Jeanie McConnell:
This letter is in response to your review of the Woodway Elealentary Project dated March 20, 2013, updated March 22,
2013. The piaris llcive been revised per your reCiLiested revisions. Below is a l,ist of each COITIryient with our responses
in bold.
Response,s to cornment letter dated March 20, 2013, updated March 22, 20.13
GENERAL COMMEN'US
L March 22. 2013 -- Please revise the costes as follows�
a,, Add XTR
b, Account for 2 Type I CB's in the existing ROW
c. Add I Type IL CB
& Revise 6" PVC quantities to reflect what's, shown ori the plans
e� Revise 12" Cl"P pipe quantities to reflect what's shown on the plans
f. Add filter socks
gAdd pavement striping and street signage
h. Add ADA curb ramps
i, Add mailbox units
j. Add StOrM backflow preventors
k. Add trash rack
Updated KC Bond Quantity Worksheet is attached.
2. March 20, 2013 - Response letter states Geotechnical Engineer review letter is C01-ICUrrently submitted. A
couple of letters were received from Associated Earth Sciences, file., however, I did not find a letter which
states the civil plans are consistent with the geotech report. Could you pllease direct me to where this can be
fOUnd?
Updated geotech letter dated Mardi 29, 2013 attached.
3. March 20, 2013 -- Mease also include a crosswalk at the entrance to the plat and reference City standard
detail E3.2,
Crosswalk now included on signage and; striiping detail on, Sheet 6.
- R � �'a -V 'KI AMEN
OMBAMAIM—MMMA EMUNIBUDEMS.-IIE-L JaLM-I
Mir irnurnR g
e. jjreqients 10.
AECDC 1.8.30.0160 A. i...
L]. Add a detail of the trash rack on inlet side of pipe.
Debris barrier detail added to Sheet 11.
L7 Not er)OLigh deter is provided to delerriline overflow paffi, Provk.,le a backwater analysls ori entire dr,�.-ain@ge
sysieni including the hea(I la ss� though title water quairty device Show, the oveillow path or) Itie
B 1— U E L ��I P 4 lE ill Vlf)'IIWI�,w j 11 "o, V�', ;1�1)�,,I,
I I �
drawings should there be a 2 -year recurrence event when the vault is full. This is to ensure than an overflow
does not cause downstream flooding or erosion problems.
Backwater analysis of the overflow system now provided in Section 3 of the Storm Drainage Report.
Additional/Modified requirements per bearing Examiner's Decision (3/7 2
Please explain where the 4,600 square feet of pervious area will be in the right-of-way and how they will be
planted.
The ROW boundary extends approximately 3.25'-7° past the back of sidewalk, adjacent to the front yards of
the lots and open space tracts. This pervious area will include typical residential landscape, typically lawn, and
will be maintained by the homeowners.
Project Overview Narrative
3 (C) Same as item 1.7 above.
Backwater analysis narrative of the overflow system now provided in Section 3 of the Storm Drainage Report.
Calculations
4(L.) 3. Include the AESI Memos to Ms. Tiffany Brown dated February 12 , 2013 regarding Case Histories Study -
Infiltration Pit drains in an appendix to the project's final Storm Drainage Report.
AESI letters dated February 14, 2013 and March 28, 2013, are now included in Section 7, Special Reports, in
the Storm Drainage Report.
Plan View & Details- Retention/ Detention (R/D) & Water.QualltY
6 (F) See comment 1.7 above on overflow.
RESPONSE
Plan View: Other
7(D) 1. The construction sequence on Sheet 5 and the Construction Stormwater Pollution Prevention Plan should
detail how the infiltration system will be kept free from sediment and other pollutants during construction of
the plat infrastructure AND during the home construction phase of the project. It is of utmost important that
this system be protected from sediment and other pollutants prior to stabilization of all areas including the
construction of homes on all 27 lots.
Temporary interceptor swales will be located just upstream of the infiltration vault until the vault construction
is complete and the area is stabilized. Sediment protection shall be immediately installed on all new catch
basins upon installation. Runoff shall be routed to the infiltration vault only when the tributary area has been
stabilized; areas not fully stabilized shall continue to be routed to a temporary sediment trap. Construction
sequence on plan sheet 5 has been revised to include additional protective measures descriptions.
7(D) 2. Performance testing is required prior to the City accepting the infiltration vault. A performance testing plan
should be included in the Drainage Report. Note that Special Inspections by City Staff will be required for this
performance testing.
Performance testing plan is included in the geotechnical memo dated March 29, 2013, a copy of the memo is
included in Section 7 of the Storm Drainage Report.
PLANNING VI I N QOMMENTS
Nearing Examiner's Condition 15:
(ii) All PRD improvements including perimeter and street landscaping, entry landscaping, protected critical
areas, fencing and signage should be included in the civil plans. These improvements shall be installed or
bonded for prior to requesting final plat and PRO approval.
The Civil and Landscape plans have been updated to include signage detail.
Nearing Examiner's July 20, 2007 Conditions:
8. The fencing depicted on sheet 8 and landscape plan appears to meet the required condition. Please
provide information on the signage to be located on the fence consistent with this condition. Include the
wording of the signage as well as information on the size and location of the signage.
The Civil and Landscape plans have been updated to include signage detail.
Response to City of Edmonds Page 2
BLUELINE 25 CEN! HAI. WHY ,,IJI H 400 KIRKLAND WA 9803? TF1 42)5 21.6 4052. FAX 425 216 4052 THEBLUE1..INEGROURCOM
11. A certified arborist supervise tree removal, root systems of retained trees be protected, a planting plan for
the re -vegetation of disturbed areas be prepared, and fencing and signage of the area to prevent
encroachment and deposition of debris. PARTIALLY ADDRESSED. Signage requirement in this condition
may be combined with the signage requirement of Condition 48 above.
The Civil and Landscape plans have been updated to include signage detail.
14. The Applicant shall submit an approved landscape plan for the subdivision entry signage, landscaping and
street trees. These features shall be maintained by a Homeowners' Association consistent with the
recorded Covenants, Conditions and Restrictions. PARTIALLY ADDRESSED. Landscape plans received and
appear to meet the condition requirements. Species used for street trees to be determined by the
Engineering Division during civil review. Regarding entry signage, upon seeing the location of the entry
signage on the landscape plans more information is required. Pursuant to ECDC 20.60.025 .B.2. PRO -s
are allowed 10 square feet of signage per main street entrance into the subdivision. It appears the
entry monument will are between two columns. The two columns are twenty feet apart so, if the entry
monument was only 1 foot tall, the sign area would be more than double allowed by ECDC
20.60.025 ,B.2. The entry monument and column located on the opposite side of the street are
both located within the 25 -foot street setback. Both or these structures must be less than three feet in
height to comply if they are to be located within the street setback. While what the monument sign will say
is not required at this time, staff must be able to ensure the proposed entry monument is consistent with
the applicable standards. Please provide more information on appearance and size of the entry
monument and the column located on the opposite side of the street.
Landscape plans have been revised.
SEPA MDNS April 19, 2007 Conditions:
3. Open space Tract E will be suitably posted as'open space' to protect the woodland and to discourage
activities such as the deposition of grass clippings and other debris. Provide signage consistent with
conditions #11 and #8 above.
The Civil and Landscape plans have been updated to include signage detail.
Hearing Examiner's Remand Decision March 12, 2012 Conditions:
6. Prior to final plat approval, the Applicant shall submit plans for each open space tract (Tract A, C, E and F)
demonstrating compliance with the definition of "usable open space" in ECDC 20.35.050(D). Compliance
with "Usable open space" must be demonstrated prior to final plat approval.
Compliance with "usable open space" will be demonstrated at final plat submittal.
Sheet 3 - EC -01 - EXISTING CONDITIQN5 MAP
1. March 22, 2013 - please revise the storm system to show the abandoned line consistent with the attached
utility map.
Abandoned storm drain now shown on Sheet 3.
1. March 22, 2013 - please revise the storm system to show the abandoned line consistent with the attached
utility map.
Abandoned storm drain now shown on Sheet 4.
Sheet 6 - TESL NOTES AND DETAILS
2. March 22, 2013 - Please revise the construction sequence to provide an order to construction that will
prevent the infiltration vault from receiving sediment laden waters.
The construction sequence has been revised to include additional description of protection measures. Notes
have been revised per geotechnical recommendations in March 28, 2013 letter.
3. March 22, 2013 - Remove standard detail E1.1.1 as straw bale dams are no longer recognized by DOE as an
efficient means of provided temporary erosion control. Detail removed from Sheet 5.
Response to City of Edmonds Page 3
BLUELINE 25 CENIII AL INKY SLOT E 400 KIRI�I_AND WFC 988)'33 ; 1 E1.. 42'.52:,.5 A,051 I`AX 425-21Ci-4052 71]MA J 1JNEGR01JP.00U
4, March 2�2, 2013 - pleaSe K"Wise the storm system to show the al.-Ondonc.cl lirre, c(.")nsi,:Aent with dleattached
utility nlap.
AharuR,mecl orrn drain now sl �own onSheet 8.
RUN!! [7, DER
1, March 22, 2013 - Please revise profiles to reIflect the revisions to the labeling of tracts.
Trairft labels updated on Sheet 9.
MU
RIMALN-80 DLAU
1, March 22, 2013 please revise mailbox ch -is -ter detail to show a rninirnurn !,-).feet from back of rnaHbox unit to
back of sidewalk.
51rninir°nrarwa now shown on Sheet 11.
1. March 22, 2013 -- please revise Section AA detail to note that. at least one 1.5' deep pit drain will be installed.
Note added tra Sheet 1. 2,
2. March 22, 2013, --- please provide more detail related to the installation of sai-Aary sewer main, showing travel
lanes, lane widths, work zone, etc. Clearly show how one lane of travel (a rriinirnUrlwidth of 10 -feet) will be
maintained during construction. In addition, Clue to the curve it) the road and knoMng that the construction
equipn'aent Mill ft.wther block line of sight, flaggers will be required for this work. Please revise the traffic control
as necessary.
Traffic control notes Updated on Sheet 13.
Please call or erriaill me with any questions or concerns. I can be reached at (425) 216-4061 x223 or
THE BLLJEl INE GROUP
m mem
'001
II
Rob long, FIE
Project Manager
Fspoii ise has Dty of Edm(,)t i(J^i
&1-UELH',JE f -,I - Ill l,,I .'lY I ,!.r)jjl',[11[I11[,,+ f J (ii
Page 4