Loading...
work without permit.pdf Good morning, The Building Division has completed its portion of the review of your project and no additional information is needed by it. I’m a little puzzled by the ‘phasing’ of your project. If inspections (several?) are required for the work that has been performed as part of ‘Phase I’, then it has been done without a permit, and without the oversight of the inspector to verify code-compliance of the work done. The purpose of field inspections is to verify, not to reconcile. Hopefully all will proceed well once the permit is issued.