Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
WV Non-Structural Response to Beck.pdf
October 6, 2017 Leif Bjorback Building Official 121 5th Avenue North Edmonds, WA 98020-3145 Subject:RE: Westgate Village (Non-structural Review) Review Permit:2016-1538 COLOR 1 - SMS response. Legend: Faded text initial comment adequately addressed – no further action required Plain text initial comment (these remain where an additional comment is made) Blue text additional comment in response to the resubmittal General 2) The Civil plans and the Architectural Site Plan (AS101) appear to show that the building is proposed to be built over property lines. Buildings are not permitted to be constructed over property lines, whether interior to the site or not. Property lines are required to be legally respected where they occur and will need to be legally addressed or absolved as required. This is required to be addressed and finalized prior to issuance of this permit. 602 3) Provide a Site Plan (perhaps on AS101) that identifies distances from the face of the building to adjacent property lines or the centerline of public ways (fire separation distance). Identify locations where exterior walls are to be rated as required by Table 602. Provide an analysis for required opening protection. Table 602; 705 Reference 5/G002B – Building Separation Code Plan. All exterior bearing walls in the portion of the building that is V-A construction are required to be constructed as 1-hour walls based on the construction type requirements of Table 601. The plans show this. Exterior metal stud walls (non-bearing) of the Type 1-A construction are not automatically 1-hour walls based on construction type. However, they are required to be rated for fire-separation requirements per Table 602. In accordance with Table 602 and the given site conditions, the following Level 1 exterior walls are required to be 1-hour rated (fire- separation distances are greater than 10 feet but less than 30 feet). These walls need to be identified on the plans as being 1-hour rated. Identify the listed, tested assembly to be used to provide the rating and provide complete detailing for construction. An exact copy of the assembly needs to be included within the drawing set to insure proper construction and inspection. Reference sheet A101 for grid references. a. Exterior walls located along grid C1 between grids CA and CE. b. Exterior walls located along grid C5 between grids CA and CE. c. Exterior walls located along grid C4’ between grids CA’ and CB’ A101/1 - Wall types at exterior wall locations... a. Exterior walls located along grid C1 between grids CA and CE. b. Exterior walls located along grid C5 between grids CA and CE. c. Exterior walls located along grid C4’ between grids CA’ and CB’ ...have been tagged on sheet A101/1. Those wall tag ratings and assemblies can be referenced on sheet G003. G002B/1 - Diagram created to illustrate necessary 1-HR rating per IBC 2015 Sect. 602 Fire-Resistive-Rated Construction 8) Where the corridor walls and unit separation walls contain penetrations (membrane- or through-penetrations), the penetrations are required to be protected by approved penetration fire stop systems installed as tested in accordance with ASTM E 814 or UL 1479 to maintain the required fire resistance rating. The drawings need to clearly specify this. 708.6, 714 This item remains to be addressed. Neither sheet G006 nor A801, as reference by the architect, specifically addresses this item. See G003/Detail 2 - Fire Penetration Details - General See G003/Detail 1 - Fire Penetration Details - Concrete Specified details 1 and 2 on sheet G003 show provisions of materials and methods of construction to be implemented to protect through penetrations and membrane penetrations of horizontal assemblies and fire-resistance-rated wall assemblies. 9) While elevator doors can be built/designed to maintain the fire-resistant rating of the elevator shaft assembly, they are not constructed to limit the transfer of smoke as required for corridors. Identify the means of limiting smoke transfer at elevators in order to maintain the continuity of corridor requirements. This can be achieved by providing elevator lobbies, providing additional doors at the hoistway opening in order to limit smoke migration (automatic closing upon detection of smoke/fire), or by pressurizing elevator shafts. 1020, 708.6, 716.5.3 The plans were updated to identify “curtain elevator smoke doors”. Sheets A600 & A601 further specify “smoke & fire curtain, up to 2 hrs integrity.” However, the plans also need to specify the following (716.5.3.1): a) that these fire door assemblies are required to meet the requirements for a smoke and draft control door assembly tested in accordance with UL 1784. The air leakage rate of the door assembly is not permitted to exceed 3.0 cubic feet per minute per square foot of door opening at 0.10 inch of water for both the ambient temperature and elevated temperature tests. Louvers are prohibited. Installation of smoke doors shall be in accordance with NFPA 105. b) that the smoke doors will be activated by a smoke detectors located on either side of the smoke doors. Note added, See A600. 10) Identify all listed, tested through-penetration and membrane-penetration fire-stop assemblies on the plans, including complete detailing. This may be submitted as a deferred submittal. If this is the case, the plans need to indicate so. 714 Egress 11) Interior exit stairways are required to be provided with an “approved barrier” at the level of exit discharge to prevent persons from unintentionally continuing into levels below. This needs to be specified and detailed at Level L1 for Stair #1 and Stair #2. 1023.8 Reference 1/A301. This detail graphically shows a ‘barrier gate’. However, it is not specified. Neither is 12/A301 referenced for barrier gate detailing. Update the drawings accordingly. Reference 6/A301. This details does not show, specify, or reference appropriate detailing for the barrier gate. Update the drawings accordingly. See 2/A301 and 6/A301 - callout of ‘approved barrier’ has been created referencing detail 12/A301 Accessible Means of Egress 12) A two-way communication system is required to be provided at the elevator landing on each floor that is above or below the level of exit discharge. This is specified on the plans. However, the system requirements and directions for the use of the two-way communication system are also required to be specified on the plans. 1009.8.1 In response to this item, the architect made a note on sheet A300 (Stair and Elevator Note #10) indicating that the two-way communication is required to comply with the pertinent code sections. This is not adequate for construction. What we are looking for is for the plans to be updated to identify the specific location of the two-way communication and with the specific requirements of the code (not just referencing the code sections but including the requirements of the code sections on the plans). Detailing should show where the two-way communication system is to be located at the elevator landings. See sheet 1/A300 and 2/A300 for enlarged elevator lobby plans locating two-way call box and signage, and emergency communication signs. See A900 for details and elevator lobby elevation detail #s 10-13 with call box and instructions/ signage. Drop curtain smoke screen typical at residential levels and P1. Two-way communication system to be design build, under separate deferred permit. Building Code Analysis Reference G001 14) The parking section identifies the total number of parking spaces required to meet ECDC requirements. Additionally, the plans need to address accessible parking requirements. Reference the Accessible Parking analysis on sheet G002A. Total parking provided for M occupancies is 104 spaces.This is inconsistent with the number of parking spaces identified on sheet G001 which indicates that 89 parking stalls are being provided.Provide coordination and revise the accessible parking analysis accordingly. Total parking provided for M/Retail occupancies on new Project Site, is 8 stalls. Total parking provided for R-2 occupancies is 110 spaces.This is inconsistent with the number of parking spaces identified on sheet G001 which indicates that 133 parking stalls are being provided.Provide coordination and revise the accessible parking analysis accordingly. Total parking provided for on new Project Site R-2 occupancies is 113 stalls. ALL parking spaces proposed for this project (this building only) are required to be included in the accessible parking analysis, including “shared” parking if the ‘shared’ parking is for this building. Off site existing parking, 94 stalls to be allocated to the Existing M/ Retail Currently, all accessible parking is identified as being for residential (G002A – blue parking spaces). All accessible parking needs to be differentiated as being for either commercial (mercantile) or residential use. Van accessible parking spaces are required to be determined independently for commercial and for residential uses. All accessible parking, associated aisles, identification of standard accessible vs. van accessible spaces, and signage need to be included on sheets A100 and A101. See Response per Chucks review for additional explanation. a) Provide an analysis within the drawing set for the required number of accessible and van accessible parking spaces as required for the commercial uses in the building. According to our calculations, (4) parking spaces are required, one of which is required to be van accessible. 1106.1 The accessible parking analysis for commercial parking spaces is required to be entirely independent of the analysis for residential parking spaces. Revise the analysis accordingly. See Response per Chucks review for explanation. b) Provide an analysis within the drawing set for the required number of accessible and van accessible parking spaces as required for the residential units. According to our calculations, (3) parking spaces are required, one of which is required to be van accessible. 1106.2 The accessible parking analysis for residential parking spaces is required to be entirely independent of the analysis for commercial parking spaces. Revise the analysis accordingly. See Response per Chucks review for explanation. c) Update the plans to show the required number of accessible parking spaces and the accessible routes to the building entrances. d) Provide complete design and dimensioning within the architectural drawings for accessible parking spaces and access aisles. Provide dimensioning for accessible parking spaces that are exterior to the building. This was not provided in the submitted drawings. Reference sheet A101. See 1/A101 - dimensions of exterior accessible parking spaces for proposed mixed-use building have been dimensioned. Drawing Sheets Reference G002 16) Reference 4/G002 – L1 Code Plan. a) It appears that the areas noted as business (those that are not accessory to the residential units) are in reality required to be retail (M occupancy) per Land Use requirements. Provide coordination and update the plans accordingly. The occupant load factor for M occupancies is 60 sf/occupant. The retail space to the east is still identified as “M Office/Business”. It should be corrected to read “M Mercantile” See 4/G002 - retail space to the east has been correctly identified as ‘M Mercantile’ b) It is unclear from the plans how common path of travel will be met for the parking area to the bottom right. Update the plans to demonstrate how common path of travel requirements will be met from all locations. 1006.2 i) Will the garage vehicle entrance always be open to provide pedestrian egress from the parking garage? If so, a striped, separated egress path is required to be designated and provided for pedestrian egress. ii) If the garage is secure, one alternative may be to provide a man-door in order to exit adjacent to the vehicular entrance. 17) Reference 5/G002 – L4 Code Plan. The Lounge is correctly identified to have an occupant load of 50, based on an occupant load factor of 15 SF/occupant. However, the occupant load factor is noted as 200 SF/occupant. This needs to be corrected. Table 1004.1.2 18) Reference the Construction Type/Separation section. Roof construction for Type I-A construction is required to be 1-1/2 hour rated (not 1-hour rated). This should be updated. Table 601 This item remains to be addressed. Type IA roof construction is required to be 1-1/2 hour rated. G002/’Construction Type/Separation - roof construction for Type1A has been corrected to be 1-½ hour rated per IBC 2015 Table 601 19) Provide sections for allowable stories and allowable height in accordance with the 2015 IBC. It is apparent that these restrictions will be met for the proposed building. However, this needs to be documented on the plans. 20) The plans need to note that the Special Provisions of Section 510.2 are used and that the lid between the I-A construction and V-A construction is required to be 3-hour rated. 510.2 21) Reference the Occupant Load section. The Level 1 Retail section shows that it is a B occupancy. Retail areas are considered M occupancies (309) with an occupant load factor of 60 SF/occupant. Update the section accordingly. 309, Table 1004.1.2 22) In response to this comment, the architect updated note #10 with an incorrect analysis, using an analysis as if the Lobby were M occupancy when in fact it is B occupancy. This analysis needs to be revised to consider the area as B occupancy and indicate that separate facilities are required to be provided for each sex (which they correctly are on sheet A101). G002/Note #10 - correction has been made to Note #10 per IBC 2015 - Table 2902.1 Reference G003 - Assemblies 24) Reference wall type 13. WP 5512 is referenced. a)This assembly is for a 1-hour wall.It cannot arbitrarily be converted into a (2) hour wall by the addition of one layer of 5/8”Type X on each side.Drawings need to reference a true 2-hour rated listed, tested assembly. Assembly 13 updated to 2HR Shaft Wall GA WP3910.Additional Assembly number 14 now used for newly added 2HR Elevator Shaft Wall adjacent to Dwelling Units GA WP4230. b)A copy of the required 2-hour listed,tested assembly is required to be included within the drawing set. Sheet G004 added to provide copies of assembly information and testing. Complete specifications for the fire-resistance rated assemblies are required to be provided within the plan set. This includes all materials, connections, and any other requirements of the assembly. An exact copy of each assembly should be provided within the drawing set to ensure that the fire-resistance rated assemblies can be properly constructed and inspected. 25) Fire-resistance rated assemblies are typically taken from the Gypsum Association manual. Some of them designate that they are ‘similar’ to (SIM) the GA assemblies. a) i) Assemblies 3 & 4 are designated as WP 3380 (SIM). However, the construction of the assemblies are not similar by GA Standards, within the guidelines of the General Explanatory Notes. Identify an assembly that provides the required rating and that matches the GA assembly, within the parameters of the General Explanatory Notes. Assembly 3 updated to 1HR rated WP3510 SIM assembly. Assembly 4 updated to 1HR rated GA WP 3242. ii) Assembly 5 requires the installation of 5/8” Type ‘X’ on both sides of the wall in order to achieve the required 1-hour rating. Revise the assembly in order to meet GA assembly requirements within the parameters of the General Explanatory Notes. Assembly 5 modified to 1HR rater per IBC T721.1(2) 16-1.3 / UL356 for exposure on interior side only, FSD greater than 10 feet at all exterior walls. iii) Assembly 6 specifies the use of 5/8” GWB. WP 3510 requires the GWB to be Type ‘X’. Update the assembly accordingly. Assembly 6 specifications updated to Type X GWB iv) Reference assembly 13. (1) This assembly is for a 1-hour wall. It cannot arbitrarily be converted into a (2) hour wall by the addition of one layer of 5/8” Type X on each side. Drawings need to reference a true 2-hour rated listed, tested assembly. Assembly 13 updated to 2HR Shaft Wall GA WP3910.Additional Assembly number 14 now used for newly added 2HR Elevator Shaft Wall adjacent to Dwelling Units GA WP4230. (2) A copy of the required 2-hour listed, tested assembly is required to be included within the drawing set. Sheet G004 added to provide copies of assembly information and testing. v) Reference assemblies 14 & 15. (1) RC channels are not included as part of the referenced listed, tested assembly (FC 5407) and the inclusion of RC channels is not directly permitted within the General Explanatory Notes. Identify a listed, tested assembly that includes RC channels within the listing. Design/construction drawings are required to match the listed, tested assembly, within the parameters of the General Explanatory Notes. (2) Insulation is not included within the referenced assembly (FC 5407). General Explanatory Note #11 requires “In floor-ceiling or roof-ceiling systems, the addition or deletion of mineral or glass fiber insulation in ceiling joist spaces could possibly reduce the fire resistance rating. The addition of up to 16-3/4 inches of 0.5 pcf glass fiber insulation (R-40), either batt or loose-fill, to any 1- or 2-hour fire resistance rated floor-ceiling or roof-ceiling system having a cavity deep enough to accept the insulation is permitted provided that one additional layer of either 1/2 inch type X or 5/8 inch type X gypsum board is applied to the ceiling. The additional layer of gypsum board shall be applied as described for the face layer of the tested system except that the fastener length shall be increased by not less than the thickness of the additional layer of gypsum board.” Update the assembly to demonstrate that these requirements (including fastener requirements) will be met. Former assembly 14 & 15 combined into new assembly detail 15. Detail 15 typical wood floor/ceiling SIM GA FC5011, no additional insulation to be provided. vi) Reference assembly 19. (1) Identify the specific IBC assembly to be used for construction. It is not acceptable to reference multiple assemblies which contain conflicting information Wood low slope roof updated to 1HR rated, and tested ICC ESR 1153 (SIM GA FC 5011) assembly. (2) Provide a copy of the chosen IBC listed, tested assembly within the drawings. All requirements of the assembly need to be identified within the drawing set. Sheet G004-6 added to provide copies of assembly information and testing. vii)Reference the assembly, U376, identified on new drawing sheet G006. (1) The listed, tested assembly needs to be referenced within the drawing set where it applies. Which assembly (G003) is this applicable to? (2) The assembly is required to be listed, tested for use in the United States. Provide documentation demonstrating that this is the case. Alternatively, identify a different assembly that is listed for use in the United States. Incorrect U assembly listed. Assembly documentation updated on sheets G003,G004, G006 Review all assemblies to make sure that they meet the specific requirements of the GA assemblies identified. Fire-resistant rated assemblies are required to be constructed exactly as listed & tested. Variations are only permitted as noted in the assemblies. Provide alternate design outside of those parameters is not acceptable. b)Reference the GA Manual “Use of This Manual and General Explanatory Notes”at the beginning of the publication.These note define the limits of any variation in assemblies that are permitted,along with additional requirement that apply under certain conditions.These notes should be reviewed and coordinated with respect to the assemblies noted on sheet G003. This coordination remains to be completed, as indicated in our comments. See updated sheets G003 for updated assemblies and GA manual notes.See G004 and G006 for image of UL listing/GA section for assemblies and updated notes. 30) Walls and floor-ceiling assemblies separating dwelling units from each other and from public or service areas are required to have a sound transmission class (STC) of not less than 50 (or not less than 45 if field tested in accordance with ASTM E90). 1207 a) The plans need to demonstrate that the required STC rating will be achieved at all locations. b) Numerous assemblies indicate that the STC is “Per Acoustic.” It is not sufficient to reference an acoustical designer/engineer for STC ratings. The architect needs to coordinate with the acoustical specialist and provide coordination on the drawings for the specified assemblies. i) Provide documentation for our review (from the acoustical specialist). ii) Update the Assemblies on G003 accordingly. Assemblies on G003 updated. Assembly 15 Typ Wood Floor/Ceiling updated to STC 54 and corresponding documentation is provided on new sheet G004. When responding to the comments in this review letter, update identified STC ratings based on the revised, updated assemblies identified. Reference A101 – Retail & Parking Plan 33) The “Stair and Retail #1 Passage” should correctly be identified as an exit passageway. Update the plans accordingly. 1023, 1024 34) The doors in Trash Room L109 are all required to be self- or automatic-closing upon the detection of smoke. The plans need to clearly identify the means of meeting this requirement. Update the Door Schedule accordingly. 713.13.4 Door L109B is a door in the Trash Room. It too is required to be self-closing. Additionally, it is required to be 2-hour rated. Update the door schedule (A601) accordingly. Door L109B updated to 2HR and self closing on A903.. 35) Provide complete design and detailing for the Changing Room (Room 437). The toilet room and shower are required to be accessible. Update the plans to demonstrate compliance. The plans need to specify the dimensions of the two toilet rooms and demonstrate that required clear floor spaces are provided (sink, toilet, turning space). ICC A117.1-09, 603 Accessible changing room plan and Elevation added see 15/A401 and 16/A401. Reference A103 – Residential 2 Plan 54) Wall type ‘33’ is called out at a couple of shafts. In referencing the assemblies on sheet G003, it is clear that this is an incorrect callout. Wall type ‘33’ is still called out on the plans. Review the plans and revise accordingly, consistent with the assembly types on sheet G003. Wall tags updated to match G003 assemblies sheet. Reference A104 – Residential 3 Plan 56) The doors (both noted as door 204) from the Amenity Area (423) to the interior of the building are required to be: a) provided with panic hardware. Update the Door Schedule accordingly. 1010.1.10 b) openable at all times since these are part of the means of egress. Please confirm that no locking hardware will be provided on these doors and that they will be openable at all times. Door ST-E1A (previously Door 204) is required to be provided with panic hardware since it serves an A occupancy with an occupant load of 50 or more. 1010.1.10 Door Schedule updated to note openable at all times and provided with panic hardware. 62) Wall type ‘33’ is called out at a couple of shafts. In referencing the assemblies on sheet G003, it is clear that this is an incorrect callout. Wall type ‘33’ is still called out on the plans. Review the plans and revise accordingly, consistent with the assembly types on sheet G003. Wall tags updated to match G003 assemblies sheet. Reference A105 – Roof Plan 63) The roof plan needs to show all slopes and required drainage (including overflow drains in accordance with the UPC). Update the plans accordingly. Reference roof drain & overflow drain detailing from the Roof Plan. See A105 indicating slopes and drains with overflows and tag to detail. Reference A300 – Vertical Circulation & Shafts 64) Reference 6/A300 – Enlarged Trash Chute L2-L4 Plan. a) The Trash Chute Plan Detail still needs to specify that the door into the chute is required to be self-closing. Update accordingly. The door into the chute is required to be self-closing and 45-minute rated. Update the detail accordingly. 713.13.1 6/A300 and trash chute door notes updated to note self closing chute door. Self closing trash room door noted as well upon actuation of a smoke detector. b) Doors leading into the Trash Room are required to be self- or automatic-closing upon the actuation of a smoke detector. Update the plans and Door Schedule. 713.13.1 Reference A301 – Vertical Circulation & Shafts 65) Reference 4/A301 – Section 6. a) Assembly ‘31’ is specified at the masonry wall. However, assembly ‘31’ is for a PT deck. Please coordinate. b) Stair construction at the lower Type I-A construction is required to be of non-combustible materials. This needs to be specified. Identify the materials that the stairs will be constructed of. 1011.7 c) Interior exit stairways are required to be provided with an approved barrier at the level of exit discharge to prevent persons from unintentionally continuing into levels below. This needs to be specified and detailed within the plans at the appropriate locations. 1023.8 2/A301 and 6/A301 have yet to specify the required ‘approved barrier’ and reference the approved barrier (12/A301) detail. Update the details accordingly. See 2/A301 - callout of ‘approved barrier’ has been created referencing detail A301/12 See 6/A301 - callout of ‘approved barrier’ has been created referencing detail A301/12 d) Specify the specific rise and runs of steps for these stairs. 1011.5 Throughout this sheet,the number of risers (and treads)multiplied by the specified riser heights (tread depth)do not match the overall floor-to-floor heights (stair runs). Review and revise the details/sections accordingly. Please refer to sections for any adjusted riser heights and plans for treads on A301 & A302. Reference A302 – Vertical Circulation & Shafts 66) Specify the specific rise and runs of steps for these stairs. 1011.5 Throughout this sheet, the number of risers (and treads) multiplied by the specified riser heights (tread depth) do not match the overall floor-to-floor heights (stair runs). Review and revise the details/sections accordingly. A900-A903 – Accessibility (ICC A117.1-09) 69) Reference A900 – Accessibility Clearances. a) Provide detailing and dimensioning for swing-up grab bar blocking for Type B Units. 1004.11.1.1 Aside from providing a general detail that identifies blocking for all grab bar conditions (33/A900), provide detailing and dimensioning specific to swing-up grab bar blocking for Type B Units so that it can be properly located and installed for future use. Reference 1004.11.1.1 for requirements. Grab bar blocking locations provided at Type B units, please see sheets A902 and A903 for locations. Please reference additional detail 12/A900 for Swing Up Grab Bar dimensions and locations. b) Reference the NOTE provided at 20/A900. The OSSC 2010 is referenced. However, this is not an applicable code for this project. 70) Reference A901, Enlarged Kitchens & Bathrooms Notes. Reference are made to sheet G010 and AG010, neither of which are included within the drawings. Please coordinate. 71) Reference A902, Enlarged Bath A-Plan. a) Specify required dimensions of the wc (centerline, widths). b) Specify the required sink height (34”). ICC A117.1-09, 1004.11.3.2.1.1 The required sink height is 34”. Reference ICC A117.1-09, 1004.11.3.2.1.1. Update 3/A902 – Enlarged Bath A – Elevation 2, accordingly. Also, update 5/A902 and 8/A902 to specify a maximum sink height of 34”. Maximum sink height updated to 34” 72) Reference A902, Enlarged Bath B-Plan and Enlarged Bath C-Plan. Required clearance at the bathtub in order to meet Option B requirements is required to be provided at the control end of the tub. Revise accordingly. ICC A117.1-09, 1004.11.3.2.3.1 This item remains to be addressed. Required clearance at the bathtub in order to meet Option B requirements is required to be provided at the control end of the tub. Bathrooms to meet option A requirements. 30”x 48” min clearance added from tub to door swing. See updated details 4-6/A902 of Enlarged Bath plan 2 (formerly Bath B) and updated details 7-9/A802 bath 3 (formerly bath C). Energy Code (2015 WSEC) The following elements of the WSEC are required to be specified and coordinated within the plan set. 78) Provide Non-Residential Code compliance forms for the commercial portions of the building and Residential Energy Code compliance forms for the residential portions of the building. 79) Update the Assemblies on sheet G003 to identify the specific insulation values (R) required in order to achieve compliance with the WSEC (both residential and commercial). In numerous instances, the assemblies on sheet G003 provide insulation that is inconsistent with the energy analysis (G015). Provide complete coordination between the analysis and the assembly details. The analysis references sheets AG###. However, no AG- sheets are included within the drawing set. Update the Energy Code forms/analysis to reference plans/details that are included in the drawing set. G003 assemblies updated to match G015. Additional Comments Based on Resubmitted Drawings 82) Provide coordination between assembly numbers identified on the plans & details and the assemblies provided on sheet G003. Throughout the plans, previously used assembly numbers that are no longer existent within the plan set are referenced. Additionally, please be aware that no combustible construction is permitted at the Type I-A construction levels (P1 & L1). See GOO3 for additional assemblies, with non-combustible elements tagged on A100 and A101. 83) The Roof Plan (A1.05) should make reference to the roof drain detail (13/A801). See item 63 response. Please feel free to give me a call if you have any questions or need more information to complete your review. Best regards, Austin Weller, Assoc. AIA Studio Meng Strazzara