WWTP Safety Committee Agenda Items 2.docx
Safety Committee
2.10.2016 1:15 to 2:15 WWTP
Meeting called by Safety Committee
Type of meeting Safety Committee Meeting
Facilitator
Note taker
Attendees Pamela Randolph, Les Krestel, Curt Zuvela, Eric Duenas, Jon Clay
Modify safety committee meeting Agenda
5 minutes Les
Discussion Modify and implement an agenda system to keep the safety items organized and on track.
Conclusion Modify/simplify past agenda pages to fit our needs.
Person
Action Items Completed Deadline
Responsible
Les
Continue with this version if everyone agrees
Primary clarifier H2S alarm…
\[Time
allotted\]
The primary clarifier H2S alarm hazard and explosion hazard (LEL) are disabled for
maintenance. Parts for the current equipment cannot be purchased and it is not certified in
Discussion
the US. The plant was designed with this safety concern and had this equipment put in
place. MSA unit installed
Conclusion We should: Risk assessment rates low LEL & H2S – Follow up
Person
Action Items Completed Deadline
Responsible
Daniel – installed, ready to start up done Pamela
LOTO’s under revision
5 min
Discussion Revised LOTO’s should go to Supervisor for approval not the Safety Committee.
Conclusion We should send all revised LOTO’s to the supervisor for approval.
Person
Action Items Completed Deadline
Responsible
All revised LOTO’s will go to Supervisor for approval Yes all
SOP’s under revision
5 min
Discussion Revised SOP’s should go to Supervisor for approval not the Safety Committee.
Conclusion We should send all revised LOTO’s to the supervisor for approval
Person
Action Items Completed Deadline
Responsible
All revised SOP’s will go to the Supervisor for approval Yes all
Signs needed for the plant
5 min
Go ahead and order sign needed for the plant from USA Bluebook specifically confined
Discussion
space signs.
Check through the plant where new signs will be needed and where old sign need
Conclusion
replacement.
Person
Action Items Completed Deadline
Responsible
Les
Find plants last safety inspection
10 min Les
Discussion Check the date on the last plant safety inspection and start the inspection for 2016
Need to find when the last safety inspection was completed. Soon Begin the 2016 Safety
Conclusion
Inspection
Person
Action Items Completed Deadline
Responsible
Complete the 2016 WWTP Safety Inspection John Les 2017
Plant pump/valve name discrepancies.
10 min Eric
There are pump/valve identification names that don’t match throughout the plant. There
Discussion
are discrepancies from control boards to the SCADA screen.
Make changes to the SCADA screen to match identifying names elsewhere or change names
Conclusion
to match in other locations whichever makes sense. Change them when you find them.
Person
Action Items Completed Deadline
Responsible
Make changes. Eric Curt
\[Time
allotted\]
Discussion
Conclusion We should…..
Person
Action Items Completed Deadline
Responsible
Check for the Genie safety inspection checklist.
10 min
Do we have a Genie Inspection checklist and if so is it joined with the Genie Safety
Discussion
Inspection WO?
Conclusion Check files for the inspection checklist.
Person
Action Items Completed Deadline
Responsible
next
John
meeting
Remove ladders
10 min Les
Discussion Ladders were found without load rating labels.
Approval was given to remove from circulation ladders without load ratings. Replacement
Conclusion
ladders will be purchased before destroying ladders with missing labels.
Person
Action Items Completed Deadline
Responsible
next
Les
meeting
\[Time
allotted\]
Discussion
Conclusion We should…..
Person
Action Items Completed Deadline
Responsible