Loading...
Zoning Confirmation Letter for 180 2nd Ave S - Edmonds Lan….pdf October 3, 2007 Clayton Graham Davis Wright Tremaine LLP 1201 Third Avenue, Suite 2200 Seattle, WA 98101 ND RE: ZCLF1802AS,EWA98020 ONING ONFIRMATION ETTER OR VENUE OUTH DMONDS Dear Mr. Graham: This letter is in response to your inquiry received by email September 26, 2007 regarding the nd parcel located at 180 – 2 Avenue South in Edmonds (also known as Edmonds Landing). Please note that the address of this property is 141 Dayton Street according to the Snohomish County Assessor’s records (ID# 27032300409000). 1.What is the current zoning of the property? The current zoning of the site is BD4 (“Downtown Mixed Residential”) pursuant to Edmonds Community Development Code (ECDC) Chapter 16.43. Please refer to the attached copy of ECDC Chapter 16.43 for information on the allowable uses and applicable development regulations for the BD4 zone. 2.Is the property in any special, restrictive, or overlay district? The property is located within the “Downtown Mixed Residential” Comprehensive Plan designation, and is also included in the “Downtown/Waterfront Activity Center” overlay. Please refer to the goals for the Downtown Waterfront Activity Center in the attached section of the Comprehensive Plan. 3.Was this facility part of a Planned Residential Development? This facility was not part of a Planned Residential Development. 4.Was this property granted any variances, special exceptions, or conditional use permits or zoning relief of any kind? If so, please provide a copy. The subject property was granted a conditional use permit in 1999 (City File No. CU-1997- 115). At the time of the conditional use permit application, the subject property was located within the BC (“Community Business”) zone, which requires a conditional use permit for convalescent homes as a primary use. Therefore, a conditional use permit for the assisted living facility was required. A copy of the conditional use permit is attached. Now that the property is located within the BD4 (“Downtown Mixed Residential”) zone, convalescent homes are a permitted primary use without the need for a conditional use permit. 5.Are there any development obligations outstanding for the facility or the property such as roadway work, storm sewers, or any other construction that the developer/owner of the property is obligated to complete? There do not appear to be any outstanding development obligations for the facility. The City has construction and engineering as-built drawings that can be obtained through the Building Division for a fee of $5 per copy (large format). 6.Are there any legal nonconforming issues? No nonconforming issues have been identified at this time. The structure on the subject property was constructed consistent with the requirements of the BC (“Community Business”) zone. Since the zone has since changed to the new BD4 (“Downtown Mixed Residential”) zone, it is possible that there are now nonconforming issues on the site because the BD4 zone has different site development standards (i.e. required setbacks, maximum height, ground floor requirements, etc.) than the BC zone. 7.Do your records show any unresolved Zoning or Building Code violations at the present time? The City’s Building Official has indicated that she is not aware of any current building code violations on the subject property. The City’s Code Enforcement Officer has indicated that he is not aware of any current zoning violations on the subject property. 8.Was this site developed with Site Plan Approval? If so, could we obtain a copy of the approved plan and/or conditions? Yes, the site was developed with site plan approval. The City has approved site plans and building permits for Edmonds Landing on file. There is a $5 large copy fee for a copy of the site plan, which can be obtained through the City’s Building Division. 9.Is this site in compliance with the current Zoning Code? As discussed above, no known nonconforming issues have been identified at this time, but it is possible that there are nonconforming issues due to the fact that the zoning of the property has recently changed. Any nonconforming issues on the site would be subject to the requirements of ECDC Chapter 17.40. 10.Does the City Code allow for reconstruction of nonconforming structures in the event of a casualty? Nonconformance is regulated in ECDC Chapter 17.40. Section 17.40.020.F addresses restoration of nonconforming buildings: If a nonconforming building is destroyed or is damaged in an amount equal to 50 percent or more of its replacement cost at the time of destruction, said building shall not be reconstructed except in the conformance with the provisions of the Edmonds Community Development Code. Determination of replacement costs and the level of destruction shall be made by the building official and shall be appealable as a staff decision under the provisions of ECDC 20.105.030. Damage less than 50 percent of replacement costs may be repaired, and the building returned to its former size, shape and lot location as existed before the damage occurred, if, but only if, such repair is initiated by the filing of an application for a building permit within one year of the date such damage occurred. 11.Were Certificate of Occupancies issued? If so, please provide copies. Yes, a certificate of occupancy was issued for the subject property. A copy of the certificate is included for your reference. 12.Does the parking provided at the facility comply with the zoning code requirements (i.e. the number, location and design of parking spaces on-site)? Off-street parking is regulated in ECDC Chapter 17.50. In order to obtain a building permit, the facility had to comply with the parking requirements for number, design and accessibility that were applicable at the time. Current standards require one space per three beds. The approved building permit plans indicate that there are 83 units in the facility and 62 underground parking spaces, two of which are handicap-accessible. If you have any further questions, please contact me at your convenience at (425) 771-0220, extension 1330. Sincerely, Mike Clugston, Planner Development Services Department Attachments : 1.Address Book Map 2.ECDC Chapter 16.43 (BD-Downtown Business) 3.Comprehensive Plan (Downtown Waterfront Activity Center section) 4.Zoning and Vicinity Map 5.Conditional Use Permit File No. CU-1997-115 6.Certificate of Occupancy