REVISION 13 r k architecture design
Protect #BLD2019-1212 — Doug's Mazda Service Center- Revision #3 Building Summary
Date: January 30, 2020
To: Leif Bjorback, City of Edmonds Building Official
Douglas Beck, Beck & Associates
From: Frank Karreman
Project Number: BLD2019 1212
Address: 22214 Pacific Highway 99, Edmonds WA
The following are owner -initiated revisions to the approved building permit. In general, there was a
reconfiguration of rooms on the interior of the south building wall, reorientation of the stair to the
second floor, and a swap of doors 5 and 6 on the second floor. Each architectural revision is shown
clouded and enumerated with a triangle symbol #3 on the drawings, with structural revisions noted as
#4, as explained below.
Drawing Sheets
A2.1- First Floor Plan and A2.2 Reflected Ceiling Plan
• Break room has been moved from southwest corner of the building to the southeast.
• Trench drain added to vehicle servicing area. Also, because the owner has opted for in
ground vehicle lifts, the thickened slab indications for overhead lifts have been deleted
on S101.
• Stair to second floor rotated 90 degrees to avoid head clearance issue with depth of
steel columns. Structural design on S101, S102, and S103 has been coordinated to this
change.
• Enclosing walls have been deleted from Warranty Parts area. As the west wall was a
bearing wall, the structural design has been modified to show deeper joists for second
floor framing on S103 and thickened slab deleted on S101.
• A walled enclosure for owner equipment has been added outside the main building at
the southwest corner of the building. The walls are nonbearing as the roof overhead is
part of the steel structure for the metal building and are detailed in 7/A2.1.
• GWB ceiling has been applied to the new break room and equipment enclosure
locations.
A2.3- Second Floor Plan and A2.4 Reflected Ceiling Plan
• Stair at second floor rotated 90 degrees to avoid head clearance issue with depth of
steel columns at last riser. The restroom location was adjusted to allow proper
clearance.
Mazda Service CenterE9 1�
Edmonds Building Division
Building Revisions 01.30.20 ��� I �U�U
v'' F�AQTMF i I
,"I Y OF EDMOIVDS
3 1 r I k architecture I design
• Door D5 is now a set of double doors and moved east to avoid head clearance and
operational issues with the steel beam overhead along grid G. D6 is now the roll up door
that D5 originally was.
• Reflected ceiling adjusted accordingly.
A3.0- Building Sections
• Drawings 1 and 4 show the reorientation of the stair.
A4.0- Building Elevations
• West Elevation shows D6 as roll up.
• South Elevation shows the equipment enclosure
• North Elevation shows D5 as a set of double doors
A5.0- Interior Elevations
• Drawings 1 and 2 show the interior of the Break Room in its new location.
End of revision summary