Loading...
3692_001CASA� Architecture Interior Design 17281 13' Ave. NW Shoreline, WA 98177 206 — 533 — 8733 Transmittal Date: February 14, 2020 To: Denise Nelson Permit Coordinator City of Edmonds RE: Driessen residence permit revisions response Per Plan Review Letters: Mike Clugston — Planning comments 1, dated 11/19/19 Kevin Bloomfield - Building comments, dated 11/27/19 Zack Richardson - Engineering comments, dated 11/20/19 Jennifer Lambert — Engineering comments, dated 1/7/20 Engidnieering Notes at Intake 10/17/19 (Jeanie McConnel), Bull 11 Permit Submittal Completeness Check (Michael Clugston) g Response items per permit intake comments: 10/ 17/19 Sheet 1, Site Plan. Showing; survey datum note, access easement note, improvements to the site only and a new water meter and service that meets code for fire sprinklers in the new house. Sheet 2, Main Floor Plan. Add note to garage and shop area for 5/8x gypsum wall board and I hour rated self closing door to house. Energy Form for prescriptive energy code compliance. Lising for all climate zones, medium dwelling unit credit. See Sheet 7 Pre -Demolition Hazardous Material Inspection (ACM) report prepared by Washington Asbestos Testing LLC. Stamped structural drawings sheets 9, 10, 11, 12, 13, 14, 15, 16, 17. :Revi sed c i v i I d raw i n gs, s heets C 1, C2, C3, C4, C5, C6 d ated 2/10/20, These comply with intake engineering notes prepaired by Jeanie McConnell (10/17/19) and plan review comments prepared by Jennifer Lambert (1/7/20) and Zack Richardson, (11/20/19) Demolition Permit form Response items per Mike Clugston planning comments, dated 11/19/19. 1) See attached Geotech response letter dated 2/4/20 that addresses existing and proposed rockeries within the identlflcd 25 foot geotechnical setback recommended from the bottom of the southern slope. 2) See attached Critical Area notice signed and notarized and recorded with Snohomish County, dated 1/23/20. Driessen residence permit revisions response, cont. page 2 3) See Sheet 1, Site Plan, added note of Datum point per survey done by Pacific Geomatic Services, Inc. dated 6/12/18 4) Building height: Average grade markers are shown on the siteplan — sheet I and of) the e elevations - sheets 5 aii� 6. Per phone converstation between ed Miller of CASA and Mike Clugston, these markers are shown correctly. Average grade lines are also shown on the elevations sheet 5 and 6. See Elevations on Sheets 5, 6 and Section 2 on Sheet 8 for dimension showing maximum structure height above average grade. 5) East encroachments: See sheet 1, Site Plan for added and clou&d notes to dimensions 111tistrating lower roof outline and patio at grade edge of pavement in relation to the east side yard setback. 6) Rockeries: See sheet 1, Site Plan for added notes regading maximum height of rockeries shown southward of the new house not to exceed 36' i it hei ght. Response items per Kevin Bloomfield, planning comments dated 11/27/19. I ) Energy requirements to plans: See sheet sheet 7 showing revised window/exterior door ,alazing U factors to meet WSEC code. Also see added Prescriptive Energy Code oft) piance sheet showing climate zones, and compliance to energy code Table 406.2 and Table R406.2 Summary. See sheet 2 Main Floor plan for added notes to Mechanical room showing equipment make, model number and efficiency rating. 2) Rockeries location: See Sheet 1, Site Plan showing existing and new rockery configuration southward of the proposed residence. The rockery as shown will maintain distances reflected on the drawing. 3) Make tip air: See sheet 2, Main Ploor Plan for added note to the Mechanical room giving make tip air size and control and exhaust fan size in kitchen and laundry room. 4) CO detector outside sleeping area: See sheet 3, Upper Floor Plan for location and combination type of smoke and carbon monoxide detector in main hall outside bedrooms (two locations) 5) Smoke detector location: See sheet 3, Upper Floor Plan showing smoke and carbon monoxide detector location above hall. 6) Sectional indicator on sheet 9. See sheets 9, 10 and I I for adjusted section marker adjustment to "1/8" 7) Calculations for beams. See structural calculations for revised nomenclature of beam designations to differ from beam schedule as shown on framing plans. 8) Beam schedule call outs on framing plans. The beam schedule shows correct nomenclature of beams as shown on plans, sections and details. See structural calculations for revised nomenclature per item 7 above. 9) Stamped engineermlodirawings: See attached framing plans, details and structural notes, sheets 9 through 17 r engineer's stamps. 0 Response items per Jennifer Lambert, engineering comments, dated 1/7/20. 1) Right of Way Permit Application: See attached ROW permit application from Hamish Anderson Construction signed and dated 1/ 13/20 2) Stormwater Covenant: See attached Storniwater Covenant, signed, notarized and dated 1/23/20 3) Easements: See sheet 1, Site Plan for easment list and location. 4) Architectural Site Plan: See attached Site Plan sheet I for adjustments that coordinate features with the civil site plan(s) 5) Civil Plaits plans review: See attached sheets Civil drawings Cl through C6 per response by civil engineer JLS Response items per Zack Richardson, engineering comments, dated 10/17/19. 1) Drainage report and clarification notes to civil drawings C2 and C3. See attached Civil drawing C2 and C3 per response by civil engineer JLS. PROJECT: Driessen Residence ROUTE: file, PD, Denise Nelson Driessen Residence — BLD2019-1321 Engineering and Stormwater Comments AS Engineering - Response to Comments February 10, 2020 Stormwater Review Comments, Engineering Division DATE: January 7th, 2020 TO: Jed Miller jmiller@casa-arch.com FROM: Jennifer Lambert, Engineering Technician Jennifer.lambert@edmondswa.gov RE: Application #: BLD20191321 Project: Dri essen — New Single Family Residence Project Address: 9229 Olympic View Dr. GENERAL 1) A right-of-way permit is required to perform work within the City right-of-way (ROW). A ROW Permit Application shall be completed by the contractor and submitted to the City prior to issuance of the building permit. AS Response: Noted. Client has obtained the required ROW permit and submitted with the revisions 2) A Stormwater Covenant is required to be recorded against the property based on the proposed stormwater facilities for the project. Please complete the enclosed covenant, including notarization and any required exhibits and submit to the city. Ensure the stormwater covenant meets Snohomish County Record Drawing requirements. The document must be complete, but will not be recorded prior to permit issuance. Prior to construction final, location of facilities are to be verified (by field inspection and asbuilt) and then the covenant will be recorded. JLS Response: Stormwater Covenant has been filled out and notarized and submitted with the revisions. 3) If there are any private easements, please show all private easement information within the plan sets. Note AFN's for existing easements and/or recording documents for proposed easements as applicable. JLS Response: Easements are shown on the base file with the applicable record no/AFN. SITE PLAN — bX CASA 1) Please revise this plan sheet as needed to be consistent with the Civil Plan sheets. Page 1 AS Response: Site Plans have been coordinated for consistency. SHIEFF I OF 6 — CIVIL C:OVFR SHEET & SITE PLAN GENERAL NOTES 1) Note #1 — Revise 2016 WSDOT/APWA Standard Spec to 2018 WSDOT... AS Response: Date revised. GENEIZAI, 2) Revise the Utility purveyor information to include phone, cable, gas, power, etc. JLS Response: Other utility purveyors have been added to Sheet C1. 3) Revise the Utility purveyor for the Tdmonds Wastewater Treatment' to 'Edmonds - Stormwater' JLS Response: This has been revised under Site Data. SH EET2 QF6 — CSW1PF'J'ESC ANI) DEM0 PIAN 1) Revise the construction sequence to include the phasing of the ditch conversion to being piped. In order to install the construction entrance/proposed driveway the ditch will need to be piped. JLS Response: Construction sequence revised to include the sequencing of the ditch and construction entrance/new driveway. 2) Project Notes: a) Note #1 — Revise 2016 WSDOT/APWA Standard Spec to 2018 WSDOT... b) Note #15 — Revise to state 'All disturbed areas to be compost amended per 2014 SWA4MWW BMP T.5.13.' JLS Response: The two notes have been revised. 3) Revise the legend so that the description matches with the depiction. JLS Response: Legend cleaned up to match plan depictions. 4) Please show and add a note to the plans that filter socks will be added to any catch basins downstream from the construction site. Incorporate and reference City standard detail ER- 902. JLS Response: Note added to callout in plan view. Detail added to Sheet CS. 5) Show orange protective barrier fencing to be placed around areas proposed for low impact development techniques, such as rain gardens, infiltration systems, etc., to protect the area Page 2 from compaction. JLS Response: Linework and callout added to protect infiltration facility area. 6) Please provide the location of the temporary stockpile. Add a note that the stockpile is to be covered within 24 hours JLS Response: Stockpile location shown and called out. 7) Add note: Install and maintain all TESC measures according to approved plans, City of Edmonds standard details, and all other measures that may be required during construction. JLS Response: Note added as Project Note 10. 8) Show the sewer being cut and capped. a) Not used. b) If the side sewer (from the property line to the house) is not proposed to be re- used, show the sewer being cut and capped at the property line. c) If the existing side sewer is proposed to be re -used, the line must be cut and capped a minimum of 20' from existing and/or proposed foundation, whichever is closest to the property line. ALS Response: Option c) is used. Callout and note added to plan sheet. 9) Not used. JLS Response: Ok. 10) Show the existing water service line being disconnected at the meter and the installation of a hose bib with an AVB at the meter. JLS Response: Callout added to this Sheet for existing meter. SH EET3 OF 6 — CIVIL IMPROVEMENT PLAN GENFRAL 1) Project Notes: a) Note #1 — Revise 2016 WSDOT/APWA Standard Spec to 2018 WSDOT... JLS Response: Note revised with new date. b) Note #7 —Revise 'replace existing driveway ramp...' to 'replace existing driveway approach'. AS Response: Note revised to approach. Page 3 2) Consistent with Edmonds Community Development Code 18.80.060, driveway slopes shall not exceed 14% slope. Please add this note to the plans. JLS Response: This note was added to Note #7. 3) Show all existing and proposed frontage improvements. If the existing sidewalk (adjacent to the subject site) does not meet ADA standards, the sidewalk will need to be replaced. a) Show and label the sidewalk to be replaced if the sidewalk does not meet ADA standards. b) Add a note to the plans stating existing failing, damaged or non-ADA compliant frontage improvements shall be removed and replaced as determined by the City Engineering Inspector. JLS Response: Existing sidewalk along frontage shown with hatch to specify limits and Project Note #16 added. 4) Per the survey there appears to be a rock wall on the site. Please note that the City of Edmonds does not review or approve rockeries. a) Construction of rockeries is prohibited within the City of Edmonds under certain circumstances and in certain situations per Edmonds Community Development Code 18.40.020. Please review the specific circumstance pulled from the code section that pertains to this project. JLS Response: The rock wall near the north property line will be removed. There is an existing small rockery/landscape wall located south of the existing residence. The wall is less than 18-inches in height. Due to the small nature of the landscape wall the Code section does not apply. b) Please label the rock wall as 'existing to remain' or 'to be replaced'. If the wall is to be replaced, please provide bottom and top of wall elevations, as well as what the wall will be replaced with and refer to (a) above for requirements. JLS Response: Callout added for existing landscape wall to remain. 5) Show and/or add notes to address the following: a) Restoration of utility patches as follows: i. Utility patches shall be combined and full width or half width overlay will be required depending on the extent of disturbance. Where utility patches fall entirely within one travel lane, the overlay shall extend to the centerline of roadway. Where utility patches extend into both travel lanes then a full width overlay is required. JLS Response: Added as Project Note #8 Page 4 ii. Please add a note to the plans that all final restoration (including cut of existing water service and installation of new water service) within the right-of-way shall be completed by the contractor not the City of Edmonds. AS Response: Included with Project Note #8 WATER 1) As indicated by the Fire Department, a fire sprinkler system is required for this property. Typically if there is an existing water service line from the watermain to the meter, the water service line/meter will not be the appropriate size and a new tap will be required. The applicant will be required to pay for the new tap on the main and the new meter. Please revise plans to include the following: a) Please add a note that a I" meter is to be installed. AS Response: There is an existing water main in the Private Road that we will tap. A 1.5" service line and 1" meter is shown and called out. b) Show the water meter located in the right-of-way in the location depicted in the highlighted section below. The meter shall be located such that the back of the meter is on the property line. The water meter shall not be located within the driveway. It -1 If Ali 1VJQ OL Please feel free to check with Engineering on the proposed water meter location to determine if it will meet standards prior to submittal of plans. AS Response: Proposed water meter location is just south of southern driveway within the highlighted area. It is not located within the driveway and should still be easily accessible. c) Please show a 1-1/2" water service line to be installed from the back of the meter Page 5 to the house (as required for a combination fire and domestic service). JLS Response: Callout added for 1.5" water service line from meter to house. d) Please label the pipe material and note tracer wire to be installed on the water service line. JLS Response: Pipe material labeled and tracer wire called out in Project Note #9. 2) Please add the following notes to the plans: a) A minimum of 3' of horizontal separation between the water service and dry utilities (i.e. power, phone, gas, cable, etc.). JLS Response: Project Note #10 added. 3) Add a note to the plans indicating where the landscape irrigation backflow assembly will be located (if one is proposed). JLS Response: Landscape irrigation not proposed at this time. SEWER 1) Label pipe material and size. The sewer lateral (from the main to the edge of easement shall be 6". Once on private property the sewer may reduce to 4". JLS Response: Pipe material and size added to side sewer. 2) Show a 6" cleanout at the edge of easement. Please add a note that the 6" cleanout at the easement line shall have a 12" cast iron lamphole cover with %" hexbolts. JLS Response: Cleanout added at edge of ease ment/property line. Project Note #11 calls out the cast iron cover. 3) Show a cleanout located within 2' of the house, at any 90* bend, when there is less than 3' between two 45 * bends, and when there is more than 100' between cleanouts. JLS Response: Cleanout added outside of house. 4) Provide invert elevations at the main, the cleanout at the property line and at the house so that a minimum 2% slope and minimum 2' pipe coverage can be verified. N the slope of the pipe exceeds 20% the pipe will need to be anchored. JLS Response: More pipe and elevation data added to side sewer. There is about 4 feet of cover and 10% slope across the length of the side sewer. 5) Please add a note that the existing side sewer will need to be TVd by the contractor and Page 6 video must be submitted to the City for review and approval to re -use. JLS Response: Existing sewer lateral will not be reused. 6) If the existing sewer lateral is proposed to be reused, the City's Public Works Department will need to TV the lateral to determine if it is acceptable to re -use. Add notes to the plans to contact Edmonds Public Works Sewer Division, 425-771-0235, to schedule inspection. JLS Response: Existing sewer lateral will not be reused. 7) If a new sewer lateral is proposed show the connection at the sewer main 3' from the cleanout with a wye being utilized for installation. JLS Response: The new connection is shown and called out 3 feet from the existing cleanout. 8) Per survey notes the cleanout is sealed shut. The cleanout shall be brought to current City standard. Revise plans accordingly. JLS Response: Callout added to existing cleanout. DRY UHLITIES 1) Show all dry utilities and required utility separation. Please add a note that a minimum of 3' separation is required between the dry utilities (power, gas, phone, cable, etc.) and sewer, water, and storm and 5' from any City main lines. JLS Response: Dry utlilities shown and reference to separation Project Note #10. STOEM 1) Storm pipe under driveable surfaces shall have a minimum of 2' of cover (from top of pipe) and I' of cover under landscape areas. Please revise the plans accordingly. JLS Response: Area Drain #2 elevation adjusted to increase cover for storm pipe. 2) Provide the rim elevation for the existing CB that the proposed stormwater management system will be connected to. JLS Response: The RIM is shown in the base map/survey. RIM=167.09. 3) Label all area drains (i.e. Area drain I or 2, etc.). JLS Response: Area Drains labeled. 4) Show quarry spalls around inlet for culvert. Page 7 JLS Response: Rip -rap called out at culvert inlet with specifications. 5) Show how the surface water runoff from * the driveway will be collected and discharged to the onsite stormwater management system (i.e. curbs/directional flow arrows, etc.). JLS Response: Project note #12 added and flow arrows added to driveway surface to show water is directed to area drains. 6) Show a way to cleanout out the north portion of the infiltration system (i.e. cleanout or mis-align the catch basins, etc.). JLS Response: Cleanouts added to each end of trench and called out. 7) Show where the footing drains will discharge to. JLS Response: Footing drain discharge location shown and called out. It shall not be connected to infiltration facility and connect to existing CB. 8) Show where the rock wall/retaining wall drainage will discharge to. JLS Response: Added as Project Note #13. 9) Please add a note to the plans that if the rim to invert elevation exceeds 5-feet then a type Il manhole will be required. JLS Response: Project Note #13 added SHEET 4 OF 6 — STANDARD NOTES & DETAILS 1) Note #1 — Revise 2016 WSDOT/APWA Standard Spec to 2018 WSDOT... JLS Response: Date changed on the note. SHIEFT 5 OF 6 — DETAILS No Comments SHEET6 01� 6 — DETAILS No Comments STORNIWATER ENGINEM REVIEW Refer to separate plan review comments by City Stormwater Engineer, Zachary Richardson. Please contact Zack directly at 425-771-0220 or by email at zachary.richardson@edmondswa.gov with any specific questions you may have regarding his comments. JLS Response: See next page for response to stormwater engineer comments. Page 8 Page 9 Stormwater Review Comments November 20, 2019 Driessen SFR BLD20191321 9229 Olympic View Drive Review Type: Building Submittal Date: 10/17/2019 Reviewer: Zack Richardson, PE City of Edmonds, Stormwater Engineer Recommendation* Drainage report is approved and need not be re -submitted unless changes to the site plan necessitate changes to the report. We recommend that BLD20191321 be withheld until the comments below are adequately addressed. JLS Response: Understood. There are no changes to site plan that would warrant revision to Drainage Report or calculations. 1. C2: Clarify and ensure all tree removal for the installation of the new storm drain line is reflected; street view appears to suggest some additional trees existed, but condition was not verified in field. J LS Response: There may be some non -significant trees that were not surveyed and exist around the proposed drainage facility location. Trees and vegetation will be cleared as necessary to construct and maintain the drainage facility. 2. C2: Update sheet to address SWPP element 13 (protection of LID facilities). a. It appears that it is feasible to simply fence off the infiltration area from construction traffic; show and callout fence. JLS Response: Fence and protection around the infiltration facility has been shown and called out. 3. C2: It appears the construction entrance extends beyond the limits of the existing culvert; narrow up the construction entrance as needed and/or updated construction sequence to address order of operation needed to permit the entrance as shown. JLS Response: Construction sequence revised. Existing driveway will be used for majority of demolition and grading activities. After existing driveway removed the permanent culverts should be installed and the ditch immediately stabilized. Then rock construction entrance can be installed as shown on the plan. Page 10 4. C2: Move over the note about driveway removal from the 'improvements' sheet to this demo sheet and update or revise, as needed, to address removal of the existing culvert and restoration of the ditch line. a. Include details or information as needed for construction as well as for temporary and final stabilization. JLS Response: Existing driveway removal and rehab note moved to Sheet C2. Ditch restoration described under construction sequence. 5. C3: Show and callout inlet protection at the new culvert inlet (rip -rap); provide dimensions or details as needed for construction. JLS Response: Inlet protection added to culvert inlet. 6. C3: Add notes to direct contractor what to do with remaining ditches feature which get served by the new pipe (assumed to be filled -in and levelled out); specify bulk fill material (native soils from on -site, gravel, structural fill, etc) and amended soils on top. JLS Response: See Project Note #15 and callout added to plan. 7. C3: It appears the proposed (pass -through) culverts will not achieve 2' of cover in traffic rated areas; updated or address as needed. a. Ductile iron pipe may be used for reduced minimum cover of F; update callout as needed. JLS Response: Storm 12" culverts both called out to be ductile iron pipe to ensure pipe stability with reduced cover. 8. C3: Clarify grate/lid type on CB #1 a. It is a bit unclear where the road drainage currently flows; if it enters the ditch at this location, it appears the CB must allow for collection of runoff. JLS Response: Rim/grate lowered to create lowpoint and note added to callout. There is not a significant amount of area/flow that will enter the CB, only a portion of the Private Road. 9. C3: Add to the callout for CB #2 & CB #3 text for "w/ push -on tee", or other floatable separation device as proposed. Page I I JLS Response: Push -on tee called out for CB#2 and CB#3 10. CI It appears the proposed sewer line is within 5' of the infiltration facility; add notes/direction for protection from infiltration water migrating within the sewer trench (wrap sewer trench with impervious liner, demonstrate infiltration surface is below trench bottom, relocate line, etc). JLSResponse: Side Sewer line adjusted and is greater than 5' from the infiltration trench. 11. C3: Provide a bottom of trench/rock elevation for the trench; ensure trench is set low enough to be in the receptive soils layer. a. Modify the standard detail dimensions to reflect design dimensions and avoid conflicting dimensions or information, as needed. JLSResponse: Facility elevations added to infiltration trench ca I lout. Thebottorn elevation for the trench will ensure the trench extends into the receptive soils layer which is about 4 feet deep. Page 12