Loading...
FIR2020-0062_Site_Plan_7.6.2020_10.43.36_AMNE 1/4, SE 1/4 SECTION 23, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M. SSMH \ RIM=38.59 Y\ IE (S) 8" CONC=30.94 SDMH IM=38.15 IE (E) 8" PV 2.65� IE (S) 12" PVC=2 IE (N) 12" PVC=29.30 / REMOVE AREA DRAIN & 6"/ PIPE. SEE C3.1, C3.3, & CS�. POWER POLE TO BE REMOVED, SEE PUD PLANS VICINITY OF 3,0 0 GALLON CLOD IN -PLACE LEA ED �4 \ VICINITY OF SED-IN-PLACE EYANCE /01PINGSID a i CIO I � I V) GASOLINE/ UST w CUT AND CAP / a!? EXISTING WATER LINE AT MAIN C' c? / STREET / EE TO BE / ! �OREMOVED -� iy. •: POWER POLE TO BE REMOVED, SEE PUD PLANS / Sc = 5 IE 8 CHAN = 2 . CB T-1 RIM=40.03 IE (S) 6" PVC= 37.13 (NW) 8" CHANNEL= 33.63 STAGE ON CB T-1 / RIM=37.96 wy IE (N) 6" CONC.=36.66 SDMH RIM=38.38 IE (NE) 6" PVC=35.83 IE (SE) 6" PVC=35.73 REMOVE CONIC ISLAND AT --,,IE (SW) 6" PVC=35.38 INTERSECTION CORNER, SEE / B T381 30 IE 3" PVC= 36.80", NOTE 8 IE ( 'VC= 36.60 CB T-1 IE (SW = 35.4 RIM-39.28 (NW) 6" PVC= 37.83 G' VIC OF \ INSTALL CB SEDIMENT PROTECTION IN RMER PUMP ALL CATCH BASINS IN MAIN ST, 2ND AVE / ISLAND ��� \ PROPERTY FRONTAGE, ALLEY, AND 4 \ DOWNSTREAM CATCH BASINS CB T-1 \CLUDING ALLEYWAY TO THE SOUTH). o RIM=39.12 IE (W) 6" CONIC 37.42 \ YN a RIM=44.39 '.�:;;`.;,.�-, '•• IE (SE) 12" PVC= 41.14 Q IE (NW) 12" PVC= 39.89 ;;''"•• ���`' kk • � � 'f • • a•',..�.y:••r,j.:. CB T-1 •f'., \ \ i �••.y ,fit. � I RIM=45.82 ,::` ..Y,!' IE (SE) 12" P IE (NW) 12" P STREET • .; •n ;.,., y'. •`'. ,\ \\ TREE TO BE I \ REMOVED EXISTIN TANKS & LINE "'" i.. y>'., sT•' : �' �` TO BE EMOVED \ 1,/,9/ "N ''• ' OWER POLE TO BE P'�, �•"�="�"'' ST REMOVED, SEE PUD PLANS REMOVE & REPLACE DRIVEWAY AND EXISTING CURB, *. _; .•: SIDEWALKS TO GUTTER, ALLEY REMOVE & REPLACE ." !v BE REPLACED. EXISTING CURB, GUTT R, APPROACH, & SIDEWALK SEE C3.1 & C5.1 ALLEY APPROACH, & "` • >::'= A SIDEWALK PROVIDE 4,000 GALLO STORAGE TANK FOR DIMENT SETTLING. PUMP SE IMENT-FREE STORMWATER TO OW STOCK PILE LOCATION i (IF NEEDED) KEEP COVERED I PER DOE BMP C125 \\ I EMO ON -SITE CONCRETE ADJACENT / I ci/ PROPERTY (SAME I `�'''` \ ��` ` S\ N :,::• . OWNER) INCLUDING JOB STALL FILTER SHACK IF NEEDE::.,.••`:,• � �`� G •,.,, ..�.• _,,. FABRIC FEN � � SS I rr '�•:=� ;•:••; ' D I w I __"''` I ��� G gay. ..•::;. :% CONSTRUCTION VEHICLES MAY � USE PROPERTY TO THE SOUTH \� oo��• ������ �� �o� �p / ��®TO BACK-IN�TURWAROUND IF .;'i �� NEEDED v / I 1 ` 1 �® � I ,� \ TEMPORARY EROSION CONTROL AND DEMO PLAN SCALE: 1" = 20' TEMPORARY EROSION CONTROL AND DEMO PLAN NOTES: 1. CLOSURES (IF/WHEN NEEDED) SHOULD BE COORDINATED WITH CITY, 48 HRS MINIMUM IN ADVANCE. 2. REFER TO TRAFFIC CONTROL & HAUL ROUTE PLANS (SHEETS C5.3) AS NEEDED. 3. CONTRACTOR SHALL MAINTAIN EXISTING SIDEWALKS & CURBS AS LONG AS POSSIBLE DURING CONSTRUCTION. CLOSURES OF SIDEWALKS, ALLEYS, AND/OR PARKING AREAS BEYOND 72 HOURS SHALL BE SUBJECT TO DISRUPTION FEES. 4. CONTRACTOR TO COORDINATE ALLEY CLOSURES (WHEN NEEDED) WITH ENGINEERING INSPECTOR, POLICE, FIRE, AND TRASH. 5. MAIN ST SIDEWALK SHALL BE CLOSED ONLY AS NEEDED AS LONG AS IT TAKES TO PERFORM SPECIFIC TASKS SIDEWALK REPLACEMENTS, UTILITY CONNECTIONS, ETC. 6. INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED PLANS, CITY OF EDMONDS STANDARD DETAILS, AND ALL OTHER MEASURES THAT MAY BE REQUIRED DURING CONSTRUCTION. 7. ALL DISTURBED AREAS TO BE COMPOST AMENDED PER 2014 SWMMWW BMP T5.13. 8. ANY WORK TO BE COMPLETED AT CURB BULB OUTS (DEMO, INSTALL, ETC.) SHALL BE COORDINATED WITH CITY OF EDMONDS ENGINEERING AND PARKS DEPARTMENTS. .w' A) T ` \ / ROUGH GRADE SITE AS \ PROVIDE CO STRUCTION SHOWN, BUILD UP TO ENTRANCE S NEEDED TO ALLEY GRADES PREVENTS DIMENT 3 �ry T LIMITS OF CLEARING & TRACKING GRADING (TEMP. CHAIN LINK '� / FENCE TO BE INSTALLED ALLEY STORM DRAIN REPLACEMENT SEQUENCE: AROUND SITE AT THIS a !! LOCATION AND REMAIN DURING CONSTRUCTION). Y- DEMO EXISTING BUILDING ® / (ALREADY COMPLETED UNDER PREVIOUS PROJECT) REMOVE EXISTING RETAINING WALL; ROUGH GRADE TO rf ALLEYS DEMO 125 LF- OF EXISTING SD MAIN; SEE C3.1 & C5.1 FOR NEW STORM AND PAVEMENT RESTORATION. SEE ALLEY STORM REPLACEMENT SEQUENCE SSMH RIM=42.95 8" CHANNEL CHANNEL 8 as \ c\ \ / \ OS ` \ S \ (2.6 \ CONTRACTOR IS RESPONSIBLE FOR ALL WORK AND MATERIALS ASSOCIATED WITH MAINTAINING ADEQUATE CONTROL OF EXISTING FLOWS IN THE EXISTING STORM PIPE DURING CONSTRUCTION. FROM THE MOMENT THE PIPE IS CUT OR ALTERED, UNTIL THE NEW LINE IS APPROVED BY THE CITY OF EDMONDS, CONTRACTOR MUST PROVIDE CONTINUOUS OPERATION OF THE BYPASS SYSTEM DURING DAYTIME CONSTRUCTION ACTIVITY, INCLUDING AN ADEQUATE REFUELING PLAN TO MAINTAIN SUCH OPERATIONS. STORMWATER FLOWS SHALL BE RE-ESTABLISHED AT THE END OF EACH DAY, DISCHARGING TO AN APPROVED LOCATION, PUMPING SYSTEMS SHALL NOT BE LEFT OPERATIONAL OVERNIGHT. 1. DIVERT FLOW VIA TEMPORARY PUMPING TO EXISTING CBI IN 2ND AVE S. 2. REMOVE CB T-1 (ALLEY ROW) AND PIPE PER PLAN. 3. INSTALL CB'S 2,3, AND 4 AND PIPE PER C3.1. 4. RE -CONNECT EXISTING STORM SYSTEMS. Y 20 0 10 20 2' x 2' WOOD/STEEL FILTER FABRIC SECURED TO2'x 2' 14•CA WIRE FABRIC EQUAL NAINg BACKFILL MATERAL FILTER FABRIC MATERIAL IN COPMNOUS ROLLS USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE 2' x 2' WOOD/STEEL POSTS rSUPP ENCE ORT FILM i TO SUPPORT FILTER FABRIC BURY BOTTOM OF FILTER MATERIAL 8' TO 12' NOTES: I. COMRACrw/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER EROSION 01>NTROL THROUGHOUT PROJECT, CITY INSPECTION REQUIRED ON 2. SILT FENCE TO BE PLACED DOWNSLOPE OF CONSTRUCTION ALL EROSION CONTROL METHODS ACTIVITY.BEFORE OTHER WORK CAN BEGIN REVISION PATE CITY OF EDMONDS FILTER FABRIC FENCE AUGUST 2017 PUBLIC WORKS FILTRATION SYSTEMS STANDARDS DEPARTMENT DETAIL �S I • 1g90 Ai'Pf20VE4 BY: R. ENGLISN E R-900 SCALE:: NTS GRATE ML70 SOCK WITH (am') CATCH BASIN CATCH BAS♦1 1, CONTRACTOR/DEVELOPER SHALL MAINTAIN THIS APPLICATION AT ALL TIMES DURING CONSTRUCTION PERIOD. 2. ANY SEDIMENT IN CATCH BASIN INSERT SHALL BE REMOVED WHEN INSERT IS ONE-THIRD FULL. 3. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN. m�w�Yrrrrrr,r REVISION DATE AUGUST 2Dn CITY OF EDMONDS SEDIMENT TRAP SEDIMENT PUBLIC WORKS FOR CATCH BASINS STANDARD DEPARTMENT DETAIL `s r • ,a APPROVED BY: R. ENGLSH ER-902 SCALE: NTS is, Mw PROVIDE FULL WIDTH OF INGRESS/EGRESS •DU -AIL NOTES: O THE MINIMUM LENGTH SHALL BE EXTENDEC AS NECESSARY TO ENSURE MATERIAL 6 NOT TRACKED OFF SITE AND/OR INTO THE PUBLIC RIGHT-OF-WAY, �OZntATTS DRIVEWAY RAMP AND/OR SITE ACCESS ROAD 15' WIDE MIN, SEE TABLE BELOW FOR REQUIRED LENGTH. 1. SURFACE WATER - ALL SURFACE. WATER FLCWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. 2. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL QUARRY SPAL.LS AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY. 3. WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO I ENANG THE SITE. WHN WASHING IS USED, Pt SHALL BE DONE ON AN AREA STABILIZED WITH QUARRY SPALLS AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 4. INSPECTION AND NEEDED MAINTENANCE SHAI_ BE PROVIDED AFTER EACH RAIN. PROJECT SIZE MIN LENGTH OF (FEET) QUARRY SPALLS"' < 1/4 ACRE 30 < 1 ACRE 50 < 3 ACRE 100 > 3 ACRE 100 e PROVIDE ATB OR ASPHALT TRANSITION WHERE FRONTAGE ROAD IS AN ARTERIAL LENGTH TO BE DETERMINED BY CITY INSPECTOR. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN TE STABILIZED CONSTRUCTION AUUGSUST 2017 CITY OF EDMONDS ENTRANCE PUBLIC WORKS STANDARD DEPARTMENT DETAIL ZSI. t89d APPROVED BY: R. ENGLISN ER-901 SCALE: NTS ENGINIEeRING 250 4TH AVE. S., SUITE 200 EDMONDS, WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 253135 s� �IONAL 03/ 2012020 Q Q Q H H m m Z ®� un w 1r w iy H I_ V) TY w LII W Lu LLl LLJ��� Qenv CIS] 1714 000 N m O r-i O Y Q DESIGN: TAF DRAWN: ATD CHECK: JPU JOB NO: 19144.20 DATE: 08/29/19 SHEET: C201