Project: Mock Residence Slope Stabilization
Purpose: Structural Evaluation
Location: 21100 88th PI West
Date: July 19, 2019
CG Project: 18295.10
Report: 1
Client: Darrin Mock
General Contractor: Unknown
Field Rep: Morgan Kruse, PE
PURPOSE AND SCOPE
A field representative of CG Engineering was on site on July 11, 2019 to observe the rebar reinforcing
for approximately 45'-0" of grade beam prior to concrete placement. It is our understanding that
approximately 45'-0" of a 75'-0" total length grade beam had been formed and rebar placed and
ready for concrete pour. The remaining 30'-0" will be formed and poured at a later date.
EXISTING BUILDING
The existing building is a single family residential structure that had experienced settlement to the
downhill side. The existing rockery wall at the edge of the rear patio was removed and will be replaced
with an allan block and geogrid wall system supported by a concrete grade beam. The concrete patio
slab will then be replaced with a new structural slab. At the time of our site visit, part of the grade
beam was formed and ready for the concrete mix to be placed.
OBSERVATIONS & RECOMMENDATIONS
Grade Beam Reinforcing —The footing reinforcing appears to conform to the permitted
structural drawings dated 11/21/18. All reinforcing was installed per the structural details. The
concrete grade beam was formed with additional height to accommodate the existing grade
and an additional layer of reinforcing was provided to account for the additional concrete area.
2. Additional Observations — Construction appeared to conform with the construction documents
and no issues were observed during our visit.
4 by � WA
GUti
25385
DISCLAIMER
This observation is the professional opinion of CG Engineering PLLC based on the information available during this assessment or evaluation.
This report does not warrant or guarantee that all conditions were discovered at the time of the observation. This report was prepared subject
to the standard of care applicable to professional services at the time the services were provided.
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph.425.778.8500 1 f.425.778.5536
www.cgengineering.com
Mock Residence Foundation Stabilization
CG Project No. 18295.10
July 19, 2019
Page 2 of 3
Photo 2 — Footing reinforcing
C CM
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph.425.778.8500 1 f.425.778.5536
www.cgengineering.com
Mock Residence Foundation Stabilization
CG Project No. 18295.10
July 19, 2019
Page 3 of 3
Photo 3 — Footing reinforcing
Photo 4 — North end of footing
C CM
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph.425.778.8500 1 f.425.778.5536
www.cgengineering.com