Greene Residence - Daily Report 2Group Northwest, Inc.
Geotechnical Engineers, Geologists, &
Environmental Sciertis is
13705 Bel -Red Road
Phone 425-649-8757
Bellevue, WA 98005
Fax 425-649-8758
FIELD REPORT
Job # Date I Page # I Field Report #
G-5087 1 7/30/2020 1 of 1
Project Name & Addresses:
Greene Residence - 8116 Frederick PI., Edmonds, WA
Garrett Dean with GEO Group Northwest, Inc. was on site on 07/29/2020 for periodic construction
monitoring of backfilling around the fiberglass pool.
Verify Fill & Compaction
Backfilling has continued with the use of hand shovels, as well as with limited use of a mini -excavator
and a 'Dingo" sidetrack. Material used for backfill consisted of fine- to coarse -grained washed sand
which was "wetted" with a hose to achieve optimal compaction in hard to reach places. To keep the pool
level during backfilling, the corners of the pool were supported with jacks. Backfill was generally placed
in 6 to 8-inch lifts and was kept within approximately 6-inches in height difference from the water level in
the pool, as to avoid flexing of the fiberglass. Approximately 2 feet of fill height was placed around the
pool since the prior site visit on 07/24/2020, with the exception of the north side of the pool, where
backfill has been brought up to surface grade. Pool backfill is expected to be completed by Thursday,
July 30, 2020.
Copy to: Randy Mclennan, Aqua Quip Continued
Johnny Struiksma, Alderwood Landscape Architecture on next page