Loading...
From PLN and applicantFrom: Gregg Fusco <greggf@belred.com>  Sent: Tuesday, April 21, 2020 1:33 PM To: Nelson, Denise <Denise.Nelson@edmondswa.gov> Cc: Carmen Gray <CarmenG@belred.com> Subject: RE: Bld2020-0417 932 Dayton St (Melanie Meyer)   Hello Denise,                I have attached the aerial grade change submittal, and because my drawing on the computer looked like a 3 year old’s I have also uploaded a detail of our plan for the grade change to accommodate unit placement in the setback. Brad had OK’d this plan and now we just need the next step! Please let me know if I need to include anything else.   Thank you, Greggory Fusco | Project Manager Cell: (425)221-1528 Office: (425)493-5353 Fax: (425)493-5354 E-mail:  greggf@belred.com 10733 47th Pl West | Mukilteo, WA 98275 Visit us online at www.belred.com       From: Shipley, Brad <Brad.Shipley@edmondswa.gov>  Sent: Tuesday, April 21, 2020 12:51 PM To: Gregg Fusco <greggf@belred.com> Cc: Nelson, Denise <Denise.Nelson@edmondswa.gov> Subject: RE: Bld2020-0417 932 Dayton St (Melanie Meyer)   Hello Gregg,   Mechanical reviews typically take 1-2 weeks for review. The drawing you provided should be more clear for the reviewer. Include height dimensions from original grade and a note to explain.   Once you are ready to submit, email Denise Nelson your application materials.     Brad Shipley | Associate Planner City of Edmonds 121 5th Ave N Edmonds WA 98020 (425) 771-0220 ext. 1367           From: Gregg Fusco <greggf@belred.com>  Sent: Tuesday, April 21, 2020 12:39 PM To: Shipley, Brad <Brad.Shipley@edmondswa.gov> Subject: RE: Bld2020-0417 932 Dayton St (Melanie Meyer)   When can I expect notification of Engineering and Building’s review? I just want to make sure my customer is prepped pending the approval of the permit.   From: Shipley, Brad <Brad.Shipley@edmondswa.gov>  Sent: Tuesday, April 21, 2020 12:24 PM To: Gregg Fusco <greggf@belred.com> Subject: RE: Bld2020-0417 932 Dayton St (Melanie Meyer)   Sounds good from Planning’s perspective. Engineering and Building will have their own review. Make sure you indicate on your plans that you are digging down 7” from original grade to comply with the setback requirement.     Brad Shipley | Associate Planner City of Edmonds 121 5th Ave N Edmonds WA 98020 (425) 771-0220 ext. 1367       From: Gregg Fusco <greggf@belred.com>  Sent: Tuesday, April 21, 2020 12:15 PM To: Shipley, Brad <Brad.Shipley@edmondswa.gov> Subject: Bld2020-0417 932 Dayton St (Melanie Meyer)   Hello Sir,                We spoke a bit ago, I have spoken with our customer and they are ok with what we feel is adequate enough to handle the grade difference from an installation and engineering standpoint.                Our outdoor unit will be dug down 7” from grade to give us the height requirement needed to meet the 36” height ruling. The outdoor unit will then be partially surrounded by the customer’s paver stones from landscaping, allowing us all necessary mechanical clearances in front of the unit. Please let me know if this is acceptable for permitting.                Thank you, Greggory Fusco | Project Manager Cell: (425)221-1528 Office: (425)493-5353 Fax: (425)493-5354 E-mail:  greggf@belred.com 10733 47th Pl West | Mukilteo, WA 98275 Visit us online at www.belred.com     1Attached Images