2860_001'-'canne RAM Engineering ftevember7,2019'- �- City of Edmonds Development Services Department 1215 1h Avenue North Edmonds, WA 98020 RE: Select Lot 10 of Westhaven Plat Plan Check BLD20191177 Vt Engineering Site Plan Review Comment Response RAM Job No. 3.7-038 Staff: This letter outlines the revisions and corrections made per Staff review. Below is a list of the comment response documents addressing the comments and requests: Engineering Comments: JoAnne Zulauf letter dated October 10, 2019 GENERAL 1) Please submit a Side Sewer Pert -nit Application form. Response: Application attached. TESC 1) Please add note that plat tesc will be maintained during Or construction or provide a tesc plan for the sfr. Response: Added note to plan. SEWE 1) Provide invert elevation at the sewer stub. Response: Added invert to plan. STORM 1) Show where the retaining wall drainage will discharge to Added retaining wall drywell to plan. 2) It appears that the storrn invert at the house and the invert at the outfall of the perforated stub are the same. Response: revised inverts to show positiveflow. RESUB NOV 12 2019 BUILDING DEPARTMENT CITY OF EDMONDS.' RAM Engineering 16531 131h Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAMengineeringinc.corn Select Westhaven Lot 10 Plan Check BLD20191177 1st Engineering Site Plan Review Comment Response Stormwater Engineering Comments: Zack Richardson, PIE letter dated October 21, 2019 Review Comments: Page 2 of 2 RAMJob No. 17-038 1. The lot impervious coverage appears to exceed the typical lot assumptions from the plat drainage design, however, it generally appears that the plat total impervious may still be balanced against other lots which run under allotments. Engineer shall provide written explanation or documentation of impervious distribution varying form the reviewers Interpretation below: a. The plat drainage report generally assume 4,000 SF per lot of impervious. b. An extra 2,000 was allotted for "panhandle driveways" which were assumed to be limited to Lot 9 and Lot 6 c. The effective result was 4,000 SF allotment per lot, except that Lot 6 and 9 could go up to 5,000 SF. d. This documentation shall be included with all drainage submittals for SFRs. associated with this plat, including lots which are under the allotment, In order to correctly assess the re -distribution to all lots correctly. Total Hard Surface New/Replaced Prop sed = 51,200 sf (1,175 ac) Building Rooftop = 30,OC , -10"ts @ 3,000 sf ea.) Uncovered Patio and Walk = 2,000 sf (10 lots @ 200 sf ea.) Individual Driveways = 8,000 sf (10 lots @ 800 if eaj Additional Panhandle Driveways =IM21- Vault Access Road = 1,800 sf ROW Frontage and Cul-de-sac - 6,300 sf ROW Sidewalk = 1,100 sf Response: Attached is a letter with an updated allocation for the lot hard (impervious) surface areas for theproject. The letter lists the hard surface areas for each lot and demonstrates that the overall lot hard surface area is not exceeded This letter will be submitted with all lot building permitsfor reference. If there are any questions regarding the items above, please contact me at your earliest convenience; I can be reached at (425)678-6960 or RobL@RAMengineeringinc.com. Thank you, Rob Long, PE Principal RAM Engineering 16531 131h Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAM engineeringinc, com RAM Engineering A '�' To: City of Edmonds Engineering Division c/o Zach Richardson, PE Stormwater Engineer 121 5th Avenue North Edmonds, WA 98020 From: Rob Long, PE PEAM Engineering 16531 13th Ave W, Suite A108 Lynnwood WA 98037 Subject: Select Homes: Westhaven Plat, Plan Check PLN20180034 Project Allowable Lot Impervious Allocation Revision RAM Job No. 17-038 Memorandum Date: November 7, 2019 This letter provides a revision to the allowable lot hard (impervious) surface allocation for the Westhaven plat. The original plat design included a total new and replaced hard surface of the project at 51,200 sf, of which 42,000 sf of the area was allocated to impervious on the lots. The applicant would like to revise the hard surface allocation for each individual lot to support the building permit application for each lot. The following table provides the requested reallocation and demonstrates that then revised numbers will not exceed the original approved hard surface allocation of 42,000 sf for the lots. The new revised lot allocation will be 500 sf less than the original 42,000 sf design. Westhaven Individual Lot Hard Surface Allocation: Lot Imvervious Lot Impervious 1 4,200 6 4,750 2 4,100 7 3,850 3 4,200 8 3,500 4 4,000 9 4,800 5 3,900 10 4,200 Total Lot Impervious Allocation = 41,500 sf If you have any questions or need additional information, please contact me at RobL@RAMengineeringinc.com or call me at (425) 678-6960. Thank you. L * to 13� 36508 ISTO RESUB 111-7119 NOV 12 2019 BUILDING DEPARTMENT CITY OF EDMONW RAM Engineering 1653113 1h Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAMengineeringinc.com