Loading...
2284_001RESUB Scanned SEP U 9 2019 Capsule-- 2366 Eastlake Ave E, #403 BUILDING DEPARTMENT Seattle WA, 98102 CI-FY OF EDMONDS' 206.395.9672 PERMIT CORRECTIONS RESPONSE LETTER PROJECT Miller Residence PROJECT # BLD20190888 PLAN REVIEWERS Kevin Bloomfield (Building) 425.771.0220 Jennifer Lambert (Engineering) 425.771.0220 Jennifer. lambert@edmondswa.gov Brad Shipley (Planning) 425,771-0220 ext.1 367 brad, shipley@edmondswa.gov Responses to the corrections below are as follows: Building Sheet A 1.01 1. Energy Efficiency Credit. To claim credit ALL faucets and shower heads should be identified on the plans. A note on faucet and shower head as "Typ" on plans, is acceptable. M16 odV-&-Lj&b1 I UpLidiuu ictfiguayV U1 ulu uuutp' d11U C1 I IUMP dUUUU LU the kitchen faucet on the proposed main floor plan. See sheets A1.01 & A2. 11. Sheet A 2.11 2. Glazing in doors 103 and 201 should be identified as safety glass (SG). The doors have been designated on the plans and in the door schedule as requiring safety glazing. See sheet A2. 11. 3. Sideliaht alass at slider second floor should be safetv alass on the fixed Danel side of the slider oniv. FY/ / think you have this reversed: the exception excludes Window (2) on the fixed panel of the slider from consideration as a hazardous location. Regardless, per code the operable side sidelight should be safety glazing; both Window (2)s have been designated to maintain consistency in visual transmittance between them. See sheet A2. 11, 4. New range in new location on plans. Please indicate the CFIVI of the exhaust fan and note that it is vented to the outside. Also include any makeup air as required. T1— --4,mo "AMAI 4nn eICAA11 1— 4— f— 41— AA-1— --4,J-4 k.. the existing HVAC system. No change in capacity should be required as the new hood replaces the existing hood being removed. See sheets A2. 11. Sheet A 3.12 5. Window "l " at rear lower deck should be designated safety glass (SG). Window (1) has been tagged as safety glazing, and also noted in the window schedule. See sheets A2. 11 & A3.12. Q11VVL M O.V 1 6. Please include stair detail for both sets of new stairs attached to the deck, Include dimensions for stair risers and treads, and handrail and guard dimensions. A typical stair detail has been added to the drawings, the stair & railing notes have been duplicated next to the details, and a callout to the main floor plan. See sheets A2. 11 & A5.01. 09/09/2019 Page 1 of 3 Capsule 2366 Eastlake Ave E, #403 Seattle WA, 98102 206.395.9672 Sheet S 2.0 t-. Reins show foundation to be match ea to existing usfng epoxy and-doweis. Flibase (nCllbate how many dowels at each tie in point. See the included response letter from the structural engineer. Engineering 1. Sheet A1.01 states a new deck and remodeled bay and upper deck. Sheet A-1.02 stated proposed deck consistent. Notes on A1.01 have been updated to make them consistent with A1.02. See sheetAl.01. 2. Please show the location of the side sewer. If the new addition is to be placed over the sewer, a cleanout will need to be added or shown that there is an existing cleanout within 2' of the structure. Any modifications to the sewer will require a side sewer permit (Side Sewer Permit Application form) and will need to be inspected by the City of Edmonds. The approximate location of the existing side sewer has been added to the site plan. All work is being performed on the opposite side of the house; no modifications to the side sewer should be required. See sheet A1.01. 3. Show all City easements. There appears to be a City Storm main line and utility easements along the east side of the property. Please show all easements, AFN's, and utilities located on the subject site. City easements & their numbers have been added & noted on the site plan. The citl storm easement has been drawn to match the drawing in the easement document; the city GIS seems less accurate. See sheet A 1. 0 1. 4. If there are any private easements, please show all information within the plan sets. Note AFN's for existing easements and/or recording documents for proposed easements as applicable. No other easements were discovered. TESC 1 . Show filter fence (as needed) on the plans and incorporate and reference City standard detail ER-900. details has been added to the set. See sheets Al. 0 1 & A5.02. 2. Please show and add a note to the plans that filter socks will be added to any catch basins downstream from the construction site or where debris may be tracked near any catch basins. Incorporate and reference City standard detail ER-902. A note has been added to the site plan requiring filter socks be installed on catch basins and the standard ER-902 detail added to the drawing set. See sheets Al. 01 & A5.02. 3. Add note: All disturbed areas to be compost amended per 2014 SWMMWW BIVIP T.5.13. The note has been added to the Site Notes. See sheet A1.01. 4. Add note: Install and maintain all TESC measures according to approved plans, City of Edmonds standard details, and all other measures that may be required during construction. The note has been added to the Site Notes. See sheet A1.01. 09/09/2019 Page 2 of 3 Capsule 2366 Eastlake Ave E, #403 Seattle WA, 98102 206.395.9672 Planning I . Please submit the attached Critical Area Checklist, along with applicable $50 fee for subsequentv/ determination, to the Development Services Department. -q*T-IpCmmck�i-s This Determination has been performed and should be available in City Records. Denise Nelson shoWd have a copy.,=- . 2. Sign the attached statement acknowledging that an ADU is not being established and return to th VIII, Development Services Department. project 09/09/2019 Page 3 of 3 Harriott Valentine Engineers Inc. MEMORANDUM TO: Mike La Fon Capsule 2366 Eastlake Ave E #403 Seattle, WA 98102 FROM: Todd Fisher DATE: 9/3/19 RE: City of Edmonds Plan Review Comments Project address 17216 72nd Ave W Plan Check: BLD2019-0888 Mike: This memo summarizes my responses to the structural items shown on the City of Edmonds Corrections Notice dated 8/12/19 Sheet(s) Comment and Response S2.0 7. Plans show foundation to be matched to existing using epoxy and dowels. Please indicate how many dowels at each tie in point. r-oundafuon pJan note(11) caffls for dowels -to " marchhonz. reintorcing'. As Yhe existing horizontal reinforcement detailing is not known the number of dowels cannot be specified. However matching the existing horizontal reinforcement both in location and number of bars is a sufficient tie in for the existing footing to new footing. 1 trust this summan - zesthei - ssues aa I equat . eiy. Sincerely, Todd Fisher, P.E. Todd Valentine, P.E. 1932 First Avenue, Suite 720 Seattle, Washington 98101-2447 tel 206 624 4760 3 99-' 7 Al. 9/4/19 9/3/2019 Page 1 of 1