Loading...
Response to Comments_1January 27th, 2020 To: City of Edmonds RE: BLD20190803 Party Room Dear Denise, Please find my responses to the third round on the next couple pages, to the various department feedback. For the drawings, not all pages were updated. For your reference (and also referenced in the responses): A100 – updated site plan A1.04 – updated patio and retaining wall drawings with handrails A1.05 – New details A1.06 – New notes Feedback for Engineering Division To help clarify the current existing driveway ends and the end of the driveway is marked on the site plan (Page A100). After the end of the driveway, it transitions immediately to grass lawn and matches the rest of the yard. Ok Ok Ok Ok Responses provided directly to building division comments. Ok Ok Ok Responses provided directly to building division comments. Ok Ok Best regards, Paul Trieu Feedback for building division comments I did make some changes to the overall design – mainly to add a couple steps from the building to the patio which lowered the grade on the patio. We’ve also added the handrails to the retaining walls and stairs as requested. An engineering calculation for the wall is also attached to the responses. Guard rail has been added to the retaining wall (A1.04) and elevations Guard rail has been added to stair case in new detail (A1.05) Engineering calculations for wall are attached separately Stair details and notes are provided on A1.05 and A1.06 Best regards, Paul Trieu