Loading...
20100 84TH AVE W_111111111111111 15393 20100 84TH AVE W April 28, 1997 0 0 CITY OF EDMONDS BARBARA FAHEY MAYOR 250 5TH AVENUE NORTH - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works a Planning * Parks and Recreation e Engineering P 4, % � e /,V/z i -A? 7 �1'n t - 0, YJ c//Z el, F 7 Stephen Matsudaira Mahlum & Nordfors, McKinley Gordon 2505 Third Ave. #219 Seattle, WA 98121 Subject: Review of Parking Lot Revisions Steve: Your request for revisions to the parking lot at Maplewood Special Education Center cannot be approved as submitted because it does not meet current Edmonds Community Development Code requirements. As you discussed with Gordy Hyde this morning by phone, the plan should be revised to reflect minimum drive aisle width of 24 feet. The City of Edmonds requires that the minimum parking stall size is 16'-6" by 8'-6" wide. Stalls for ADA requirements are required to be 18'-0" by 8'-0" wide with a 5'-0" barrier free area that can be shared with an adjacent stall. The above requirements would indicate that a total dimension of 180'-6" is required and only 175'-0" is provided. John Bissell has determined that the additional 5'-6" can be taken out of the landscaped areas without having to take the plan to the Architectural Design Board for review. If you have any further questions, do nothesitate to contact Gordy to discuss this further at 771-0220. Sincerely, ez /1z - 14 James C. Walker, P.E. City Engineer GCH/JCW/sf PRIKOSKULDOC Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan 3 r -e (Df= Er-)IMC -JF-)S -260 GYM -�M-UU MC�"T" - NOM10MC-0. W- 060AC - C2083 771-0220 . P^X 4200) 771-0221 -r-e ORPIVSCES cpEP^Fl-rmm!"-r blip Work* � Planning Parke mrsid Recrontlart � Engimmerinp ophAhAum Pu f 66 -rE=-L.F-:C:�CloF01V-F:k CCYVIEER F�AOGIZ r4urvilBeFt C>F F-^C31=-S- (In=ludimo (--C�Neftr FtecIplents -T-oteoc>pier "gjmI:>or,: 4-14-11 — 0 -,7 4--- eC>UlPmE"-T-. A,utc,matic/Giro.up it. (2.3 rnInS-); <317-mug:> III if ttiore arm oLn Rorco1wornr. during trans;�n ssicn c)r documents are reaemped inc%Dmploto,. please c:mIl f206) 7-71-0220 and oLsk or Sander's -releco-pior Nurint:)-er: (206) 771-0221 FztF-- Ausuat 2.1; .2890 TRANSMISSION REPORT THIS DOCUMENT (REDUCED SAMPLE ABOVE) WAS SENT COUNT 2 *** SEND *** NO REMOTE STATION I.D. START TIME DURATION #PAGES COMMENT 1 206 441 0478 4-28-97 4:OOPM 1'27" TOTAL 0:01'27" 2 XEROX TELECOPIER 7020 M I STREET FILE CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT BACKFLOW DEVICE TEST REPORT kME OF-PRE.MISES A P L E w o 0,0 .._RV I Ct ADDRESS Lo /oo )CATION OF DEVICE VICE: Manufacturer Serial No. LBS. NE PRESSURE AT TIME OF TEST IESSURE DROP ACROSS FIRST CHECK VALVE LBS. CHECK VALVE NO. 1 CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE lITIAL- 1'. LEAKED 0 LEAKED 0 OPENED AT LBS. rEST 2. CLOSED TIGHT 2. CLOSED TIGHT W REDUCED PRESSURE 2. 'DID NOT OPEN 0 C LEANED 0 CLEANED 0 CLEANED C__1 REPLACED: REPLACED: REPLACED: J4 '.'�j SC ------------- 0 DISC ------------- El DISC -UPPER ---------------------- 0 .R SPRING ----------- 0 SPRING ----------- E) DISC.LOWER ---------------------- EJ E GUIDE --- 7 -------- 0 GUIDE ------------ F-I SPRING -------------------------- 0 P PIN RETAINER ----- 13 PIN RETAINER ----- 0 DIAPHRAGM, LARGE A HINGE PIN -------- 0 HINGE PIN -------- 13 UPPER ------------------------- 0 .1 SEAT ------------- El SEAT ------------- El LOWER -------------------------- 0 R DIAPHRAGM -------- 0 D*IAPHRAGM - ------- 0 DIAPHRAGM, SMALL s OTHER, DESCRIBE 0 OTHER, DESCRIBE --El UPPER ------------------------- 0 LOWER --------------- 0 SPACER, LOWER OTHER, DESCRIBE OPENED AT' LBS. FINAL rEST -CLOSED TIGHT ----- 0 CLOSED TIGHT ----- 11 REDUCED PRESSUK EMARKS: HE ABOVE.REPORT IS CERTIFIED TO E TRUE: f,-/ Ct d NI.TIAL TES'T PERFORMED BY )VaAl�,, OF 415 DATE ,F,PAIRED BY" DATE 144AL. TEST.. PERFORMED BY --DATE STREET FILE CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT BACKFLOW DEVICE TE.ST REPORT kME OF PRE� I SES ADDkESS )CAT ION OF'. DEVICE O;Ful 'VICE Manufacturer Fiodel fNE PRESSURE 'AT TIME OF TEST LBS. IESSURE DROP ACROSS FIRST CHECK VALVE NITIA L TEST ' R E P A I R S CHECK VALVE NO. I T.... LEAKED 0 2..:. CLOSED TIGHT CCEANED 0 REPLACED: DISC ------------- 0 SPRING ----------- 11 GU I , DE ------------ 11 P IN RETAINER ----- El ,.HINGE PIN -------- 0 SEAT ------------- 11 DIAPHRAGM -------- C1 :.OTHER, DESCRIBE 0 Size Serial NO. LBS. CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE /.I-. LEAKED ED J- OPENED AT J' - LBS. 0 2. CLOSED TIGHT A( REDUCrD PRESSURE 0 2. DID NOT OPEN CLEANED 1:1 CLEANED 'o REPLACED: DISC -------------- 13 SPRING ----------- El GUIDE ------------ El PIN RETAINER ----- 0 HINGE PIN -------- 11 SEAT ------------- 11 DIAPHRAGM — 11 OTHER, DESCRIBE --E] REPLACED: DISC.UPPER ---------------------- DISC.LOWER ---------------------- SPRI NG -------------------------- DIAPHRAGM, LARGE UPPER ------------------------- LOWER------------------------- DIARHRAGM, SMALL UPPER ------------------------- LOWER --------------- SPACER, LOWER OTHER, DESCRIBE FINAL OPENED AT LBS. TEST'. TIGHT ----- El CLOSED TIGHT ----- 11 REDUCED PRESSURE EMARK S rneD(af) HE ABOVE ftEPORT IS CERTIFIED T NI.TIAL TEST PERFORMED BY ,FPAIRED BY j;AAL.TEST.'PERFORMED BY E, TRUE: OF 0 F DATE PATE DAT E Is I 01i 0.1i STREET FILE CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT BACKFLOW DEVICE -TEST REPORT IME OF PRE'M . ISES INIJII-f tvda,,0 fl, 4-171 - `RVICE ADDRESS 6) 1? 91 Z7 )CATION OF.DEVICE �76 ga-�� :VICE-. 9vd F Manufacturer Model Ti7-z7e-- Serial No. fNE PRESSURE AT TIME OF TEST Z� LBS. ZESSURE DROP ACROSS FIRST CHECK VALVE LBS. CHECK VALVE NO. 1 CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE NITIAL 1 LEAKED E3 1. LEAKED 0 1. OPENED AT LBS. TEST 2. CLOSED TIGHT 2. CLOSED TIGHT REDUCED PRESSURE 4. DID NOT OPEN 0 CLEANED 0 CLEANED El CLEANED 0 '4% REP -*LACED: REPLACED: REPLACED: DISC ------------- 0 DISC ------------- 0 DISC.UPPER ---------------------- R -'..SPRING ----------- C1 SPRING ----------- 0 DISC.LOWER ---------------------- 0 E GUIDE ------------ 0 GUIDE ------------ FJ SPRING -------------------------- 0 P PIN RETAINER ----- 0 PIN RETAINER ----- 0 DIAPHRAGM ' LARGE A ."HINGE PIN -------- 0 HINGE PIN -------- 13 UPPER ------------------------- C3 SEAT ------------- El SEAT ------------- 13 LOWER ------------------------- 0 R DJAPHRAGM -------- El DIAPHRAGM— ------- 0 DIAPHRAGM, SMALL S OTHER, DESCRIBE El OTHER, DESCRIBE 0 UPPER ------------------------- 0 LOWER --------------- 0 SPACER, LOWER OTHER, DESCRIBE FINAL OPENED AT LBS. TEST CLOSED TIGHT ----- El CLOSED TIGHT ----- El REDUCED PRESSUK EkARKS: HE ABOVE'REPORT IS CERTIFIED TO NI-TIAL. TE-ST PERFORMED BY ,FPAIRED BY-.-, JAL JEST. P:.ERFORMED BY E: 'A,6e,;�O 0 F 5 7 OF__ DATE-S- /9/47 DATE DATE STRYE EO7 E DFM IOLN DES PUBLIC WORKS - EMINEERING ACTION REPORT SUSPENSE DATE: N? 3059 - Date: Time: )1.'0() PVJ File # Attachments: =Yes REQUESTOR: NAM: ADDRESS: / M 066 PHONE: REQUEST RECEIVED BY: TELEPHONE CONTACT IN OFFICE OTHER: RECEIVED BY: MM ACTION: p/�) t 14' 1-io -,2�11 i,?T id C�� r- 1 1 V� 1 m F- 0'r- L A 1 L All Concerned Notified Action Completed/File STREET FILE ie CITY OF EDMONDS PUBLIC WORKS DEPARTMENT BACKFLOW DEVICE TEST REPORT IME OF PREMISES 7RVICE ADDRESS C_1q_0 X9 Rolzl )CATION OF DEVICE (M /Z A5 *VICE:. A 7t_�S' X` �(3,2 7,5- Manufacturer Model Size Serial No. fNE PRESSURE AT TIME OF TEST LBS. IESSURE DROP ACROSS FIRST CHECK VALVE Ir LBS. CHECK VALVE NO. 1 CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE NITIAL 1. LEAKED C1 I.' LEAKED 0 1. OPENED AT LBS. TEST 2. CLOSED TIGHT 2. CLOSED TIGHT REDUCED PRESSURE ?1 'X, 2. DID NOT OPEN CLEANED 0 CLEANED 0 CLEAINED 0 REPLACED: REPLACED: REPLACED: OR DISC ------------- 0 DISC ------------- El DISC.UPPER ---------------------- SPRING ----------- 0 SPRING ----------- El DISC.LOWER ---------------------- E GUIDE ------------ 0 GUIDE ------------ El SPRING -------------------------- 0 P PIN RETAINER ----- E3 PIN RETAINER ----- 11 DIAPHRAGM, LARGE A HINGE PIN -------- 0 HINGE PIN -------- 13 UPPER ------------------------- 0 1 SEAT ------------- El SEAT ------------- 11 LOWER -------------------------- 0 R DIAPHRAGM -------- 11 DIAPHRAGM-; ------- 0 DIAPHRAGM, SMALL S OTHER, DESCRIBE 0 OTHER, DESCRIBE UPPER ------------------------- 0 LOWER --------------- 0 SPACER, LOWER OTHER, DESCRIBE FINAL OPENED AT LBS. TEST CLOSED �IGHT ----- CLOSED TIGHT ----- REDUCED PRESSURE EMARKS: HE ABOVE REPORT IS CERTIFIE NITIAL TEST PERFORMED BY _7�' EPAIRED BY V OAL TEST PERFORMED BY BE JRUE: 00?,3 OF /�47, Smod I91-M D A T E DATE OF DATE <41 0 STREET FILE 0 CITY OF EDMONDS PUBLIC WORKS DEPARTMENT BACKFLOW DEVICE TESI REPORi \ME OF PREMISES U106)10 -.RVICE ADDRESS, C) )CATION OF KVICE /Z— Ro /Z_ -:VICE: Manufacturer Model Serial No. !NE PRESSURE AT TIME OF TEST 45' LBS. �ESSURE DROP ACROSS FIRST CHECK VALVE LBS. CHECK VALVE NO. 1 CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE NITIAL 1. LEAKED 0 1. LEAKED. 0 1. OPENED AT LBS. TEST 2. CLOSED TIGHT 2. CLOSED TIGHT X REDUCED —PRESSURE 0 2. DID NOT OPEN CLEANED 0 CLEANED El CLEA."IED 0 FIR REPLACED: DISC ------------- 0 REPLACED: DISC ------------- El REPLACED: DISC -UPPER ---------------------- 11 SPRING ----------- El SPRING ----------- 0 DISC.LOWER ---------------------- EJ E GUIDE ------------ 11 GUIDE ------------ 0 SPRING -------------------------- C3 P PIN RETAINER ----- C3 PIN RETAINER ----- 0 DIAPHRAGM, LARGE A HINGE PIN -------- El HINGE PIN -------- 0 UPPER ------------------------- C3 I SEAT ------------- El SEAT ------------- E3 LOWER ------------------------- 0 R DIAPHRAGM -------- 0 DIAPHRAGM— ------- El DIAPHRAGM, SMALL S OTHER, DESCRIBE 13 OTHER, DESCRIBE UPPER ------------------------- 0 LOWER --------------- 0 SPACER, LOWER OTHER, DESCRIBE FINAL OPENED AT LBS. TEST CLOSED TIGHT ----- C1 CLOSED TIGHT ----- El REDUCED PRESSURE EMARKS: HE ABOVE REPORT IS CERTIFIED I NITIAL TEST PERFORMED BYA iAIRED BY �AL TEST PERFORMED BY BE TRUE: ae3 OF Te-Ho4 L /�)/57 0/-5--DAT E DATE OF DATE Ll 0 STREET FILE CITY OF EDIVIONDS CIVIC CENTER - EDMONDS. WASHINGTON 98020 (206) 775-2525 COMMUNITY DEVELOPMENT DEPARTMENT Mr. Fred A. Babb Edmonds School District 3800 196th Street S.W. Lynnwood, WA 98036 ADDRESS CHANGE HARVE H. HARRISON `�'-FCEAIVED MAYOR OC'T 1-51979 Vir. Ut tur)jjc vV0rjjS October 11, 1979 1'1� Per your request, the Building Division has assigned 20100-8-4�tli-,Av—enue W��-sti as the address for the LMaplewo-Qd Handicapped vh-i— C We are notifying the City's Utility Billing office and it will be the school district's responsibility to notify other interested parties. If we may be of further assistance please contact the Building Division. 4. ()-Q�� HAROLD REEVES Acting Building Official HR/mt CC: Utility Billing CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering C. April 12,2000 Reid -Middleton & Associates 728-134'hStreet SW, Suite 200 Everett, WA 98204 Attn: Allan R. Morgan, PE GARY HAAKENSON MAYOR SUBJECT: Improvements to The Maplewood School at 20100-84' Avenue West (ADB-99-209) (PC 00-M Dear Mr. Morgan, The Engineering Division reviewed your revised civil site design submittal of March 21, 2000. The review team notes the following revisions/corrections. Please contact the review team members directly for questions regarding their comments. Ma1yanne Zukowski. Lraf ic Engineer at ( -0220. Ext. 32 -425)771 The notations are copiedfrom the 2128 review letter. The italicized notes in parentheses indicate completeness comments, while the bold notes reflect my comments from the 3121 submittal. Please also see copies of redlinedplans and redlined responses on copy ofyour 3117 letter. Stormwater Report and Calculations Revise/correct storm drainage report and calculations as noted. (March 21 submittal not complete) a. The narrative as supplied in the revised report is adequate for the map area request. As a minimum requirement, the following hydraulic calculations listed need to be added to the report from the original request. The control structure #1 is for the design of the entire site to show the release rates and detention performance for the site. The hydraulic calculations need to verify the actual performance of the (2) detention systems to verify peak stages of the capacity for the design parameters. b. Control structure #2 - run the level pool analysis for the wet pond for the developed site discharge at the 100-year, 24-hour event with the release rate of the 10-year, 24-hour event. Use the elevation of the top of the dead storage as the base line to check the peak stage. Show the actual detention design used with this oriflce design. c. Control structure #1 - run the level pool analysis for the pipe detention system for the developed site through the system. Show the actual detention system design used with this orifice design. Please clarify in the - report how water will flow through 3960 LF of pipe at 0%. If this is designed to pressure flow, provide those ' calculations. It is unknown if the intent is for the 36- inch pipe under the swale to be part of the detention calculations. Please clarify how CB #8 is to function in the system performance of detention. d. Flow splitter structure - The plans and the report calculations do not match for the baffle weir sizing and elevations. e. Swale — Please provide the 100-year capacity analysis as previously noted. Incorporated August 11, 1890 Sister City - Hekinan, Japan Allan R. Morgan, PE Reid -Middleton & Associates April 12,2000 Page 2 f. There is an inconsistency in the detention calculations for the maximum wet surface design. See redlines in the report and on the plans. g. The responses from the Reid Middleton letter dated March 17, 2000 need to be added within the report, as they clarify the design assumptions. Within the report, show the hydraulic calculations on the system network that includes a map of the catchment areas (sub -basins). (Not complete; can limit to (2) ana lysis; see report.) * Assumptions and design constraints need to be shown for both control structures, flow splitter design and temporary sedimentation pond. (Temporary sedimentation pond not done; need iffunctioningfor rainy season) a. The temporary sedimentation pond needs the hydraulic . calculations for sizing during the construction activities. Please use the 10-year event. * There are three swale areas shown, or two swales and a ditch/culvert system. Please state as part of the network design criteria, hydraulic calculations for biofiltration and capacity, (not done) and show on the schematic. Comment in the narrative the performance as a complete system (in reportplease). a. The comments from the Reid Middleton letter dated March 17, 2000 need to be incorporated into the report. * All invert elevations need to be consistent with the plans. (Not done), a. The flow splitter design and the control structure #2 (See redlines in the report and on the plans.) b. CB's and swale are noted under Stormwater Plans and are marked as redlines on the plans. * Provide the engineering soil analysis and design for the infiltration/storage facility. Include the separate hydraulic calculations that work within the network. (Not done) Discuss any subsurface impacts to the adjacent properties. Show potential overflow impacts from system failure or oversaturation. Address the clogging potential of fines from sand filling the rock voids. (Not done) Discuss the possibility of this interaction sealing the soil strata preventing longer-tenn infiltration. Provide preventative design measures, maintenance procedures and discuss how inspection should be made on the maintenance schedule. a. The Reid Middleto n letter dated March 17, 2000 narrative that addresses this needs to be added to the report. The overflow route still needs to be defined for impacts to adjacent properties. Verify that the hydraulic calculations were checked for maximum HGL at control structures from the wet pond to the outfall. (Not done; see #2) a. The request for the (2) hydraulic analysis will show this parameter. Stormwater Plans The swale does not show detail for TESC or function for TESC. Show grade and catch points. Unable to identify erodability, velocity, capacity or need for checkdams. (Put a note 2% max on TESCplans) Show all pipe calls and invert elevations, including culverts and pipe outfalls. (Missed one at bldging; see plans) Allan R. Morgan, PE Reid -Middleton & Associates April 12, 2000 Page 3 a. See sheet C6.0 for redline items that need to be detailed or verified for gravity flow. Please note that the landscape plans show different pipe sizes and crossings for the pedestrian bridges. Please provide a note on the plans that references those details or show the pipe sizes. On the TESC plans, add a note the maximum of 2% for the diversion swales. Show where pipes and catchments drain to and from. (Missed swale to pond — problem in elevations) The biofiltration swale does not infiltrate as sediment pond drains to it. (Resp I onse ok taken offline) CB#7 — complete the detail design for all elevations, flow directions, angles and structure type. (Not done) a. Flow splitter detail. This is not complete. The detail shows a type 1 and a type 2. It is important to verify that the angles and the pipe sizes will fit, and that the contractor knows all elevations and the intended flow directions. Profile the storm system showing matching systems, pipe inlet and outlet elevations, utility crossings and minimum cover. (Not done; requiredfor allprojects) a. Not complete and a requirement for all development projects. Clarify by detail the pipe system under the swale. (OK.) a. Not complete; the engineer will need to verify the grades as shown on the redlines and verify the cover on this crossing. Check the structure notes.for completeness and clarity. (OK — missed control structure a. Add control structure #1 and verify gravity on all systems. Show the invert elevations of the infiltration/storage facility. (OK but 0%) a. See comments on No. 1 with regard to a 0% elevation for this system. b. Please note there are redlines on the plan sheets that are duplicates of the first submittal package. Note also the storm plans reference the landscaping plans for the pond planting detail, and the landscape plans reference the civil plans. * Provide additional information on baffle detail. (Still incomplete) * Provide information on the detention pond control structure in the design report. (Not complete) Specify planting material for pond. (Plans say landscape plans; landicape plans say see civil.) Clarify water surface elevation for pond. (See reportfor 410?) See comments in the design report regarding detention field. (Not done) Traffic Plans Show right-of-way impacted area during construction activities and proposed restoration area for the TCP with the required right-of-way construction permit. (Need this commitmentfor ROW damage) a. The right of way impacts to the adfacent street need to be shown on the commitment to repair J damages during construction activities. Allan R. Morgan, PE Reid -Middleton & Associates April 12, 2000 Page 4 * Provide easement or deed for pedestrian access. (Not done) a. Easement or deeded right of way has not been submitted for the re-routing of the sidewalk area. * Provide detail for island by bus pullout. (Not done) a. The detail as provided for the median at the bus pullout location is not per the agreement at ADB. This needs to be a surface that can be driven over such as C curb or striping. It needs to address the limits in height and drainage impacts to the street area. Landscaping and wall was not approved in the ADB process. Curbing at southwest comer of parking area conflicts with the three directions. (OK as long as it is noted.) Utilities — Jim Waite, WaterlSewer Sul2ervisor at (425) 771-0235, Ext, 64 0 Replace indicated fire hydrant assemblies with hydrants that meet current Edmonds standards. 0 Add valve clusters as shown. 0 Revise note as indicated. When the revisions are complete, please return the attached redlined plans and report, together with three sets of. revised plans and three drainage reports for additional review. It will be necessary to provide a construction cost estimate for City staff to determine the amount of Engineering Divis ion fees. If you have any other questions, do not hesitate to contact me at (425) 775-7744. Sincerely, ORDON C. HYDE Development Services Engineer GCH/cmc Enclosures c: DST Edmonds School District Bassetti Architects (Ted Cameron); 71 Columbia, Suite 500; Seattle, WA 98104; (Fax) 206-340-9519 G:\ENGR\GORDY\92O9&DOC .1 '?1 C. 18913 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering February 2*, 2000 Reid -Middleton & Associates 728-134'h Street SW, Suite 200 Everett, WA 98204 Attn: Robert 0. Gafteland, PE SUBJECT: Improvements to the Maplewood School at 20100-84" Avenue West (AL)B..99-209) (]!C 00-M Dear Mr. Galteland: GARY HAAKENSON MAYOR The Engineering Division reviewed your civil site design. The review team notes the following revisions/corrections. Please contact the review team members directly for questions regarding their comments. • Revise/correct storm drainage report and calculations as noted. • Within the report, show the hydraulic calculations on the system network that includes a map of the catchment areas (sub -basins). • Assumptions and design constraints need to be shown for both control structures, flow splitter design and temporary sedimentation pond. • There are three Swale areas shown, or two swales and a ditch/culvert system. Please state as part of the network design criteria, hydraulic calculations for biofiltration and capacity, and show on the schematic. Comment in the narrative the performance as a complete system. 0 All invert elevations need to be consistent with the plans. Provide the engineering soil analysis and design for the infiltration/storage facility. Include the separate hydraulic calculations that work within the network. Discuss any subsurface impacts to the adjacent properties. Show potential overflow impacts from system failure or oversaturation. Address the clogging potential of fines from sand filling the rock voids. Discuss the possibility of this interaction sealing the soil strata preventing longer-terrn infiltration. Provide preventative design measures, maintenance procedures, and discuss how inspection should be made on the maintenance schedule. Verify that the hydraulic calculations were checked for maximum HGL at control structures from the wet pond to the outfalL • The Swale does not show detail for TESC or function for TESC. Show grade and catch points. Unable to identify erodability, velocity, capacity or need for checkdams. • Per detail, plastic is being used to cover stockpiled material. Route runoff so as not to impact downstream property owners. Incorporated August 11, 1890 Sister City - Hekinan, Japan Robert 0. Galteland, PE Reid -Middleton & Associates February 29, 2000 Page 2 • Provide construction sequence. (Is incomplete as shown on C2.2.) • Provide as part of construction sequence; parking to remain on site. TCP required during construction showing staging area. • Add street sweeping requirements to general notes. • Show that maximum depth of sedimentation pond is possible and need for safety considerations. • Protection fence as shown goes through the sedimentation pond. • Show tire wash area, or pad for large earthwork construction. • Show all pipe calls and invert elevations, including culverts and pipe outfalls. • Show where pipes and catchments drain to and from. • The biofiltration swale does not infiltrate as sediment pond drains to it. • Fence ballfield to restrict access. • Add soil stabilization note as attached. • Revise sedimentation pond section note as indicated. 0 Revise notes as indicated. • Address comments regarding elevations of swale. • Show how grading ties in with the final plan. • CB#7 — complete the detail design for all elevations, flow directions, angles and structure type. • Profile the storm system showing matching systems, pipe inlet and outlet elevations, utility crossings and minimum cover. • Clarify by detail the pipe system under the swale. • Finish the routing of CB#1 to existing CB#4. Show existing system. Check all existing invert elevations are shown. • Check the structure notes for completeness and clarity. • S�ow the invert elevations of the infiltration/storage facility. • Minimum cover on storm pipes is 24". • Provide additional information on baffle detail. • Provide information on the detention pond control structure in the design report. • Revise other details as indicated. Place riprap at pond inlet. Specify planting material for pond Clarify water surface elevation for pond. See comments in the design report regarding detention field. LnqOjc Plans • Show right-of-way impacted area during construction activities and proposed restoration area for the TCP with the required right-of-way construction permit. • Show where pedestrians are sent during construction. There is no walkway on the opposite side of the street. • Provide easement or deed for pedestrian access. • Provide detail for island by bus pullout. • Call out radii for high traffic load driveway detail. • Specify maximum slope of handicap ramps. Robert 0. Galteland, PE Reid -Middleton & Associates February 29, 2000 Page 3 • Revise radii as shown. • Curbing at southwest comer of parking area conflicts with the three directions. • Provide parking stall dimensions. • Provide stop bar for bus pullout. • Provide directional striping and signage for bus pullout. • Verify bus pullout dimensions with a turning template for school bus wheel locations 1 0 Wheel stops are required where parking spaces are adjacent to walkways. Mtki — Jim Waite. WaterlSewer Sgperyisor at (421) 771-0-23& LK& 649 • Remove the existing single check valve assembly. If the City is to maintain and own the water system, an easement must be provided. If the School District is to own the main, then a double detector check valve assembly must be installed at 200' St. S.W. and 84" Ave. W. • Existing 6" water main mu st be replaced with an 8" DI water main. • Replace indicated fire hydrant assemblies with hydrants that meet current Edmonds standards. • Add valves as ghown. • Add sewer cleanout as indicted. • Revise notes as indicated. When the revisions are complete, please return the attached redlined plans and report together with three sets of revised plans and three drainage reports for additional review. It will be necessary to provide a construction cost estimate for City staff to determine the amount of Engineering Division fees. If you have any other questions, do not hesitate to contact me at (425) 775-7744. Sincerely, GORDON C. HYDE Development Services Engineer GCH/cmc c: DST Edmonds School District Bassetti Architects (Ted Cameron); 71 Columbia, Suite. 500; Seattle, WA 98104; (fax) 206-340-9519 ILAENGRZORDYM09DOC -COMM. JOURNAL- DATE FEB-29-2000 *,k*,* TIME 13:59 *** P.01 MODE = MEMORY TRANSMISSION START=FEB-29 13:57 END=FEB-29 13:59 FILE NO.= 052 STN NO. COM ABBR NO. STATION NAME/TEL.NO. PAGES DURATION 001 OK a 92063409519 004/004 00:01'20" -CITY OF EDMONDS - -DE0 HER[.: DEPT 4257710221- CITY OF EDMONDS 121 Fifth Avenue North Edmonds, Washington 98020 FAX COVER SHEET To: Ted Cameron Bassetti Architects 71 Columbia, Suite 500 Seattle, WA 98104 Phone: Fax phone: 206-340-9519 CC: Date: Jebruary 29, 2000 Number of pages including cover sheet: 4 From: Gordy Hyde Development Services Engineer Engineering Division Phone: (425) 771-0220 Fax phone: (425) 771-0221 REMARKS. E] Urgent (] For your review [] Reply ASAF [—) Please comm nt Copy of letter regarding improvement to the Maplewood School.