21005 84TH AVE W1111111111 lill
15397
21005 84TH AVE W
I
APPLICATION
The City of Edmonds for EASEMENT NO . ..............................
STREET FILE SIDE SEWER PERMIT
7EW CONSTRUCTION REPAIRS LID NO . .................. ASMT. NO . ........ ..........
OWNER .... ...... ...................... CONTRACTOR ...
........................... - ..................... PERMIT NO.
JOB ADDRESS ... ..... . ...... . --------- -- --------------------
4�
t's % cl�
LEGAL DESCRIPTION: LOT NO . .................... — ............... BLOCK NO . ............... L
..................
P=
--- ------------------------ ..................................................................... ---------------------------------------------------------------
NAME OF ADDITION .... �\P4 C�'<= M C:�> P—, V-� c--) . C��)
......................................................................................
Approved:
DATE ..... B, ............
1/ 11/75
01 STR FILE
November 2.6, 1980
MEMO TO: Architectural Design Board
FROM: Engineering Division
SUBJECT: COMMENTS FOR DECEMBER, 1980 A.D.B. MEETING
The Engineering Division has the following comments on the hearings
to come before the A.D.B.i
QONSENT',-AGENDA'*,,,
1. ADB-87-80 - Edmonds Chamber of Commerce - Review of gazebo at
th Avenue South.(BC)
Engineering has no comment on this item. I
2. ADB-15-78 - Fred Bryant - Review of chanqes to the exterior of
i 1-6 unit apartment building at 7815 218th St. S.W. (RML)
Engineering has no objection to these changes.
3. ADB-51-78 Jedco Company - Review of fence in conjunc�tion with 48
unit apartment complex on the west side of 21001, 21003,
and 21005 84th Avenue West.
Enaineering has no comment on this item.
4. ADB-91-80 City of Edmonds - Review of entrance addition for the
South Snohomish County Senior Center at 220 Railroad Ave.(CH)
Engineering has no comment on this item.
AGENDA
5. ADB-83-80 - Mr. & Mrs. E. Wise - Review of site, elevations and land-
scapina for condominium project at 528 Pine Street. (RMH)
Assuming that the variance required on this project is
aooroved,at the November 26th Board of Adjustment meeting,
the Engineering Division has the following requirements:
NOTICE:
Nb---warran-tv t ac-U-ra:C
The -information . shown on the attached
Map(s) was compiled for use by the City Of
Edmonds,, its Employees and Consultants.
Th,,e City of �Edm.qnds does not - wa rra nt the
on these
accuracy of anything set for.th
rnap(�_). Any person or entity -requesting a
copy should conduct an independent
m ation shown on
inquiry regarding the infor
I Ited to
tRe -m a p (s) , including, but not I'm
c lon of any sewer stub shown. Such
the lo' at'
sewer stubs may or may, not exist and may
or may not exist at the location shown.
Neither the City of Edmonds nor its
ernp-to-yee-s o-r off ice-rs *sha-H be 11a.b.-Ife for iffie
information given on this map(s)) nor for
tation provided based
any one represen
upon . said map(s).
�6_
CITY OF EDMONDS - SIDE SEWER 'PERMIT
WATER -SEWER DEPARTMENT
PERMIT 0,
Call 775-2525 for side sewer inspections BEFORE covering an, portion of the construction.
Inspection will be provided within 24 hours after requst. NO Sat., Sun., or holiday Inspections.)
ADDRESS LOCATION OF CONSTRUCTION ...... -ya
.... W� ........................................................ .......... . .....................................
PROPERTY LEGAL DESCRIPTION ....................... E. 160 9 c:F Tract 7 � B ock 1, Aldenmod 14mar it-] of;
.................................................................. I ......................... .............................. . ................
.................................................. . .......... . .......... . .................. excent..the.-q._2751 theranf
......... - --------- --
---------------------------------------------------------------- OWNER AND/OR BUILDER ---
CONTRACTOR'S NAME & ADDRESS ....... MM
............... . ...................... .................................. . ... ......................................... .........
------------------------------------------
Pk. ission is granted --------- ro'ebl-mry 4 ......... 1 1917, for repair and/or connection of a side SeWer to the city sanitary sewer
S�,St�m In accordance with *Ciiy' --- of ---- E --- dmon_d'_s ---- o_r'_d'inaacm
AV,ANTION IS CALLED TO THE FOLLOWING:
NOTE No. I —The owners of the property may obtain a permit to construct sewer inside property line. A licensed Side Sewer Contractor must be employed to construct
side sewer in street area. Do not cover any portion of sewer before it has been inspected.
NOTE No. 2—All work performed in city right-of-way requires an Invasion of RJght-of-Way Permit obtainable from the City Engineer's office.
NOTE No. 3—Obtain full information regarding Ordinance il.16.030 and Regulations governing side sewers when you get permit.
NOTE No. 4—Top of side sewer must have at least 30 inches coverage at property line and 12 inches inside property line; minimum grade of 2%. No bends in grade
sharper than 1/s will be permitted.
NOTE No. 5—Trenches in street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to Improper
work which may develop within one year of completion.
NOTE No. 6—It is unlawful to alter or do any other work than is provided for in the permit, or to do any work on the main sewer or Its appurtenances except to in-
sert the pipe into the wye.
DISAPPROVED 0 Date .... ........ &__ ............... By ------_------- Date ............. .... .... By -_------------ Date ............... . ................... By ................
APPROVED Date
21 .. ];?!� ..... .. ....
----------------- By----... . ..... . . . .. . .......................................................................................
Remarks: _R::mni'r n-nnrtmPnt
. .... ...... z ............... ... . ........................................ .................... . ....................................... . .............. . ...................................................
..................................................................... . ................................... .................................... . ............... ................................... . .......................................................
--- BOTH Permi opies MUST Be Signed By Owner of Firm Performing Construction PRIOR To Request For Inspection
U
.......................... hereby certify that the side sewer installation constructed under this permit
n)
F �' I = S
(9wner of Contracting Firm Gr ing Construction)
W--Installed,'In accordance with al—Ilov;ern�iIng ordinances of the City of Edmonds.
Datedthis ............................ day of ................................................................. 19 .........
V Check BEFORE you dig for: Water 0, Gas E], Telephone [], Power C], Sewer [3, Other E] Nt