4117_001ROD NOVION
Architact
10.12.2018
Project address: -915 PINE STREET
RE� �LANO USE GOMMENTS- -RESPONSE- - BLD201,81,036.
1. Sheet A-1.0
a. In Project Notes, remove note under Height stating "5' Additional roof (4/12
slope)".
NOTE REMOVED
b. Remove the 'exi�rMg house TBR' dashed Wilines. Show and label the access
easement crossing Future Lot 2 and identify the area of the easement.
EXISTING HOUSE REMO VED AND THE A CCESS EASEMENT IS IDENTIFIED.
c. Structural lot coverage is shown for both the existing lot and future condition of Lot 2.
Verify those areas are correct, particularly the lot area of Future Lot 2 after the access
easement area is subtracted out. Per ECDC 21.15.110: "Coverage means the total
ground coverage of all buildin.9sor structures on a site measured from the ouLsWeof
external walls or -supporting, members -or from a point twD -and one-half feet in from
the outside edge of a cantilevered roof, whichever covers the greatest area."
ADJUSTED THE LOT AREA TO EXCLUDE THE EASEMENT AREA. VERIFIED THE
LO T CO VER CAL CULA TIONS. ALL BLDG AREAS ARE INCL UDED EXCEPT ROOF
OVERHANGS THATARE Z50R LESS.
d. A smalt second story deck is shown encroaching: into the, west setback area,. While
roof eaves may project into a required setback up to 30", the code does not have an
exception for 2nd story decks. Please remove that portion of the deck that
encroaches into the setback and verify that all roof eaves project only a maximum of
30" into a required setback.
REMOVED THE DECK PORTION(S) THAT ARE INTO SETBACKS AND HA VE
DIMENSIONED THE CRITICAL OVERHANGS. SHEETA-1. 0 AND A-4. 0
e. Because the west deck must be reduced, the height calculations will need to be
updated. Reposition height corners PI and P4 and update the 'average grade
calculation' box as necessary.
AVG. GRADE POINTS AND CALCULATIONS ARE REVISED. A-1.0 & A-4.0
RESUB
OCT I � 2018
BtJILDING DEPARTMEW
CiTY OF EDMONDS
October 12, 2018
2. Sheet A-4.0
a. Update the average original grade, maximum.allowed height, and proposed
height as necessary if any changes resuft from the -height calculation change on
Sheet A-I-.O,.
THE CALCULATIONSAND ELEVATION AVERAGE ORIGINAL GRADESARE UPDATED.