Loading...
2018-1659 Senior Center Mechanical-Rainbow Page 1 of 2 DATE: March 21, 2019 TO: Edmonds Senior Center Daniel Johnson Email: danielrjohnson@gmail.com FROM: Leif Bjorback, Building Official RE: Plan Check: BLD2018-1659 Project: Mechanical for Edmonds Senior Center Project Address: 220 Railroad Avenue During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses to each comment, and submit revised plans/documents to a permit coordinator in the Development Services Department. Please respond to the following review comments from Rainbow Mechanical. City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 Rainbow Consulting Mechanical Engineering Steven Rainbow, PE 336 NW 50th Street, Seattle, WA 98107 Phone 206.235.6002 www.rainbowconsulting-me.com steven@rainbowconsulting-me.com March 20, 2019 Mr. Leif Bjorback Building Official City of Edmonds 121 Fifth Avenue North Edmonds, Washington 98020-3145 Subject: Edmonds Waterfront Center BLD2018-1659 Mechanical Permit Review 01 I have received and reviewed the above referenced project for conformance with the following codes, as adopted and amended by the State of Washington and the City of Edmonds: 2015 International Mechanical Code (IMC) 2015 Washington State Energy Code, WAC 51-11 (WSEC) The comments listed below only apply to the documents submitted with the building permit application for the mechanical and plumbing reviews : 1. Sheet M1.2: Indicate that the type I hood exhaust and make-up air system include a demand ventilation system that meets the requirements of WSEC C403.2.7.1. In addition, please clarify or indicate where this is called out on sheet M5.2. 2. Sheets M1.2 and M5.2: Per WSEC C403.2.7.1, indicate that the type I hood is built in compliance with UL710. 3. Sheet M2.1: WSEC C403.6, requires that for office spaces, “outdoor air shall be provided to each occupied space by a dedicated outdoor air system (DOAS) which delivers 100 percent outdoor air without requiring operation of the heating and cooling system fans for ventilation air delivery.” The plans indicate that outdoor air is not directly ducted to each office space; the outdoor air is ducted from the ERV(s) to the supply air discharge air plenum mounted to the ducted heat pump fan coil unit (s). In order to meet the intent of the code, when the space setpoint is satisfied, the fan coil unit(s) shall be off and only the DOAS system shall be energized and delivering a specific amount of air to each office. Please review the design and verify that it can meet the intent of the code: the required outside air for each office should be noted on the plans and a separate balancing report provided for the condition when only the DOAS is operational. 4. Sheet M2.1: The dryer exhaust duct(s) appear to be missing from the plans. Update or clarify plans. 5. Sheet M2.2: The plans indicate that the corridors are being utilized as a return air duct. IMC 601.2 does not allow the use of corridors as a return air path in a tenant space over 1,000 square feet. Adjust design as required. 6. Sheet M4.0: Per IMC 506.5.3, Exhaust Fan Mounting, indicate that the upblast grease exhaust fan shall be hinged. Edmonds Waterfront Center BLD2018-1659 Mechanical Review 01 March 20, 2019 Page 2 of 2 Rainbow Consulting Mechanical Engineering Steven Rainbow, PE 336 NW 50th Street, Seattle, WA 98107 Phone 206.235.6002 www.rainbowconsulting-me.com steven@rainbowconsulting-me.com 7. Please provide an interior elevation view looking at the cookline indicating the appliances, walls, ceiling, hood and ducts. Indicate wall and ceiling construction and any required flashing. Indicate elevations of the hood and ceiling and distances from the hood to the cooking surfaces. 8. The Captive Aire plans included in the permit submittal include an inline exhaust fan KB20, which I cannot find on sheet M2.1 or M2.2. Please review and clarify as required. 9. The natural gas piping is not included in these plans and is assumed to be covered under a separate permit. If you have any questions or require additional clarification on any of the items contained in this letter, please email me at steven@rainbowconsulting-me.com or contact me directly at 206-235-6002. Sincerely, Rainbow Consulting LLC Steven Rainbow, PE cc: Douglas Beck, Beck & Associates, PLLC, beckpllc@msn.com