Loading...
WG Clark - Edmonds Waterfront Center Mechanical PermitW.G.CIARK CONSTRUCTION CO. October 29, 2019 Ms. Kristin johns Senior Permit Coordinator City of Edmonds 121 Sth Ave. North Edmonds, WA 98020 RE: Mechanical and Kitchen Equipment Division of Responsibilities Dear Kristin: It appears that we are having an issue with the mechanical permit for the Edmonds Waterfront Center due to the division of responsibilities between our Mechanical Subcontractor (Emerald Aire) and the Clients kitchen equipment supplier (Smith & Greene). Listed below is the responsibility matrix for the two scopes of work. I am hoping that this will clear up the permit issue for Emerald Aire and give focus to the kitchen equipment supplier to confirm what their permit needs to cover. Emerald Aire Permit Responsibilities: 1. Rated grease duct from the hood to the roof. Welded metal shaft with ceramic fire blanket to meet the rating. 2. Emerald Aire will install the roof top MUA and exhaust fan units for the cooking hood (cooking hood supplied and installed by Smith & Greene). 3. HVAC system complete. Smith & Greene Permit Responsibilities: 1. Provide and install cooking hood and Ansul system (connects to grease duct provided by Emerald Aire). 2. Provide and install kitchen equipment (walk-in box, kitchen equipment, dishwasher, etc.). I am hoping that this division of responsibilities listed above is adequate to help determine the responsibility matrix for the permitting at the Edmonds Waterfront Center. The division in scope listed above is the result of the clients (Edmonds Senior Center) choosing a supplier/scope that requires two subcontractors to perform distinct and separate scopes of work relating to the cooking hood and cooking hood exhaust systems. Please review and contact me with your response or questions. CC: Emerald Aire Smith & Greene File 1945 Yale Place East Seattle, WA 98102 phom 206.624.5244 www.wgclark.com