2019-0562 18 Firs Condominiums
DATE: October 28, 2019
TO: Dennis Titus
FROM: Donovan Akau, Plans Examiner
RE: Plan Check: BLD2019-0562
Project Address: 8614 238th Street SW
Scope: Deck repair
Please be advised that the building plans for the above referenced project have been disapproved for the purposes of
obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable
building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other
divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the
scope of this letter. Items that recur on this list appear in italics.
A complete review cannot be performed until the revised plans/documents, including a written response in
itemized letter format indicating where the ‘clouded’ or otherwise highlighted changes can be found on the
revised plans, have been submitted to a Permit Coordinator.
Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours
are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays.
Sheet S2.1:
Detail 3:
1. Indicates a typical framing plan. In this revision there are specific unit decks indicated by the clouding and
detail references on the plans that is being constructed by the Design professional Dennis Titus. There are
other units that are not identified as part of this revision. Are these decks to be constructed as per the plans
stamped and signed by Dennis Titus? Please clarify/correct this on the plans.
2. Indicates that there are (2) 2x4 HF#2 being used as a typical post located at the storage area on the deck for
this project. On page 6 of the Calculation packet the second floor deck detail indicates (3) 2x4 HF stud to be
used. This is not found on the plans. Clarify/correct this on the plans so that each floor is noted on the plans
with the detail of the member size and connections to be used to include the detail as how the 2x4 studs are to
be fastened to each other.
3. Indicates as double rim at the storage wall and a single rim located opposite wall that run parallel to each
other. There is no detail as to the connection of the double rims to the structure. Provide a detail as to how the
double rim is to be attached on the plans.
4. It appears that the 2 x10 HF#2 @16” of are running perpendicular to the existing building and are being used
as the new floor joists for this project. There is no detail as to the ledger and its attachments that may be the
support of the new 2 x 10 floor joists being used for this project. Please clarify/correct this on the plans.
5. The pressure treated 4x 10 appears to fail at the maximum bending stress. Please take into consideration of
the incising of the 4x10 as part of the wood beam calculation. Please clarify/correct this on the plans and
calculation packet.
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
Page 2 of 2
General:
6. Provide information on the plans that the fasteners that are being used for the connection of PT member meet
the requirements of Section R317.3.1 IRC.
Upon review of the resubmitted documents, additional comments may be generated.
Sincerely,