Loading...
Engineering Comments-1CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425)771-0220 City Website: www.edmondswa.gov DATE: October 16, 2019 FROM: JoAnne Zulauf, Engineering Technician JoAnne.Zulauf@edmondswa.gov RE: Application #: BLD201911245 Project: Select Home Lot 5 - Single Family Residence Project Address: 9617 215th PI SW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.gov under Services/Permits and Development. GENERAL 1) Please submit a Side Sewer Permit Application form TESC 1) Please add note that plat tesc will be maintained during sfr construction or provide a tesc plan for the sfr. SEWER 1) Provide invert elevation at the sewer stub. STORM 1) There is a retaining wall between lot 5 and 6. It appears to be on lot 6, will the wall footing drain connect somewhere on Lot 5 or Lot 6. If lot 6, show on this plan. 2) Provide invert elevation for storm stub.