ResponseMarch 16, 2020 DONOVAN AKAU City of Edmonds Building Division 121 5th Ave. N Edmonds, WA 98020 Plan Check: Project Address Project: Dear Mr. Akau: BLD2020-0241 9327 217TH ST SW ACJ HOLD INGS/PHAYSITH- INTERIOR REMODEL In response to your plan review comments in a letter dated March 5, 2020, we respectively submit the following itemized response to your questions: 1. Please identify where the Whole House Mechanical ventilation is to be located and how this will be achieved on the set of plans. It is apparent that a continuous fan rating 50 CFM is to be installed in the Laundry room. There is concern that the fan along with other mechanical appliances in that room may affect the proper Combustion air requirements. Table 1507.3.3 (1) and 1507.3.3(2), 2015 IRC. The plans were revised to illustrate the construction of the proposed deck and its supporting elements. The knee brace details were added. To illustrate the continuation of the load transfers from the deck to joists and columns, then continuing to the footing, and the connection hardware, the nail size and spacing were called out on the drawings Sections C on Drawing 4. 2. Please provide a cross-section detail from the foundation to the roof/attic showing the R values that meets the 2015 WSEC. New structure Cross -Section "E" was created on drawing sheet #1. The Section cut was added to the basement plan view on drawing sheet #3. In addition, the insulation with R- values that meet the 2015 WSEC was called out on Cross -Section E. Sheet 2: 3. Provide a fastening schedule as how the (4) 1.75" x 20" LVL 2.0E are to be connected to each other on the set of plans for this project The manufacturer catalog was reviewed to obtain the fastening schedule for the roof ceiling girder. The use of (3) rows 1/2" diameter bolts at 24" o.c. stagger every 8" was called out on plan drawing sheet #2. 4. Provide a detail for the +40" guard rail located at the covered porch at the main entrance. Section R312, 2015 IRC. The handrail per sectionR312, 2015 IRC and R311.7.8 IRC details and sections were provided on drawing sheet #1. In addition, the Section Detail was called out on drawing sheet #2 Sheet 3: 5. It appears that the opening at the existing bearing wall has been enlarged for the door way to the Laundry room. Please provide a detail(s) for the construction of the new opening or provide a detail(s)/calculations from the FOR as to the construction of the new opening that will support the loads that are imposed on the opening and how it will be supported. The opening head was analyzed to accommodate the existing floor dead and live loads from the kitchen and hallway above that spanning over the Laundry room. The Revision 2 calculations package was provided. The opening head size for the doorway was called out of plan drawing sheet #3. 6. It is apparent that a new opening has been installed in the existing bearing wall for the new walk in closet. Please provide a detail(s) for the construction of the new opening or provide a detail(s)/calculations from the FOR as to the construction of the new opening that will support the loads that are imposed on the opening and how it will be supported. The opening head was analyzed to accommodate the existing floor dead and live loads. The opening head size was called out of plan drawing sheet #3. 7. It appears that laundry area has been created in the basement. Please clarify/correct this on the plans. The laundry room was created. The "LAUNDRY' room named was placed on the plan drawing sheet #3. 8. Please indicate on the plans the appliances that are to be gas or electric. Should these mechanical appliance be gas please provide a detail as to how the outdoor Combustion Air requirements will be achieved. Section G2407.6 (304.6) 2015 IRC The appliance is electric. The electric appliances were called out on plan on drawing sheet #2. 9. The fan that has been provided in the laundry that may be used for the whole house ventilation is insufficient per table 1507.3.3(1) or if intermittent please provide the factors and the size of the fan that is/may be used for the whole house mechanical ventilation. Please keep in mind that if this fan is a component of the whole house ventilation that it may affect the gas fueled appliances. See table 1507.3.3(2) The whole -house ventilation was adjusted to match the ventilation table. The whole house location was specified on plan drawing sheet #2. The electric heat furnace was utilized and provided on plan drawing sheet #3. Sheet 4: 10. It appears that there are conflicting information that is being provided from the table "Ventilation for all group private dwelling single and multiple" and the verbiage that is being used for the whole house ventilation. Please clarify this on the plans. The whole house ventilation location was specified on plan drawing sheet #2. The Ventilation Table note with extra words was removed on drawing sheet #4. 11. It appears that the appliances are gas, based on the Energy credits that have been chosen for this project. Please indicate on the plans the appliances that are gas/electric. Should these mechanical appliance be gas, please provide a detail as to how the outdoor Combustion Air requirements will be achieved in the laundry/mechanical room or correct the Energy credits chosen and make corrections on the plans. Section G2407.6 (304.6) 2015 IRC The electric appliance heat pump was utilized and revised on drawing sheets #3 and 4. In addition, the Energy credit was revised to reflect the contractor's last-minute changes. This concludes our response to the plan checks' comments. Please feel free to call me at (425)-891-5111 for any further questions or clarifications. Sincerely, Khoa Nguyen, Project Design Engineer