Loading...
ENG COMPACTION REPORTa s s o c i a t e d e a r t h s c i e n c e s i n c o r p o rate d 911 Fifth Avenue Kirkland, Washington 98033 Phone: 425-827-7701 Fax: 425- 827-5424 www.aesgeo.com To: Bob & Kathy Waltz c/o Sound Design Group 1326 5th Ave., Suite_4.00 Seattle, WA, 98101 _ ATTN: Dan Malone AS REQUESTED BY: Client FIELD REPORT n Date Project Name 4/26/2018 Waltz Residence Location Municipality 1135 Viewland Way, Edmonds, WA, _ Edmonds Permit No. DO Permit No. Engineer/Architect Client/Owner Bob and Kathy Waltz General Contractor/Superintendent Smallwood / Shad Grading Contractor/Superintendent Shoreline / Bill THE FOLLOWING WAS NOTED: Upon client's request, AESI was onsite to obtain a materials sample to perform a modified Proctor test of utility backfill. Page 1 of 1 Project No. 160530EO02 Weather 70's, Sunr Report No. 1 Sample collection: AESI representative drove to site and discussed with the grading contractor future compaction tests as well as backfill materials for a sewer line to be installed from 12' Ave and Viewland Way running east to west on the south side of Viewland Way downhill to where Viewland Way crosses Olympic Drive. AESI obtained approximately 80lbs. of soil from a stockpile consisting of approximately 10 cubic yards of material located within the driveway at 1135 Viewland Way. The stockpile intended for utility backfill consisted of 5/8" minus crushed rock. AESI returned the sample to AESI Kirkland office for a modified Proctor test. AESI will return the following day (4/27/2018) to perform compaction testing following the completion of the Proctor test. Copies To: Distribution Date Mailed: v. 517 Field Rep: Steven Kuffel, Staff4Principol MAY 1 2018 Principal / PM: Bruce Blyton, P.E. This document is considered a DRAFT until signed or initialed by an AESIr oject Manager a s s o c i a t e d e a r t h s c i e n c e s i n c o r p o r a t e d 911 Fifth Avenue Kirkland, Washington 98033 Phone: 425-827-7701 Fax: 425- 827-5424 www.aesgeo.com TO: Bob & Kathy Waltz c/o Sound Design Group 1326 51h Ave., Suite 400 Seattle, WA, 98101 ATTN: Dan Malone AS REQUESTED BY: Client FIELD REPORT Date Project Name 4/27/2018 Waltz Residence Location Municipality 1135 Viewland Way, Edmonds, Page 1 of 2 Project No. 160530EO02 Weather WA, Edmonds 70's, Sun Permit No. DO Permit No. Report No. 2 Engineer/Architect Client/Owner Bob and Kathy Waltz General Contractor/Superintendent Smallwood / Shad Grading Contractor/Superintendent Shoreline / Bill THE FOLLOWING WAS NOTED: AESI was contacted by client to observe the backfill of a new sewer line. The newly installed and backfilled sewer line runs east to west downhill along the south side of Viewcrest Dr. where it connects to the existing sewer utility system running North to South along the East side of Olympic Ave. The trench for the sewer installation was up to 6' deep and a trench box was used during pipe installation. AESI observed the contractor place backfill in approximately 2' lifts which were then compacted using a hoepack attached to a medium size excavator. In the area immediately around the access manhole at the intersection of Olympic and Viewcrest , a jumping jack was used for compaction. The fill consisted of 5/8" minus crushed rock and was imported onto site using several dump trucks. Using a nuclear gauge, compaction tests were performed at -4' from subgrade and at subgrade. All tests performed were over 95% of maximum density, suitable for the installation and backfill of sewage utilities. Test results are summarized in Table 1 below. Test locations are shown on page 2. Table l: Sewer utility backfill compaction test results (See Figure I and Figure 2 for approximate location and depth) Test Number Test Location (see Figure 1) Depth (ft.) (See Figure 2) Total Density Test Density Moisture % Compaction % P/F 1 Sewer Line Backfill SG 132.5 127.1 6.5 96 P 2 Sewer Line Backfill -4 132.5 131.2 7.2 99 P 3 Sewer Line Backfill SG 132.5 129.8 6.9 98 P 4 Sewer Line Backfill 1 -4 132.5 1 127.7 1 6.9 1 97 P Copies To: Distribution MAY 1 1 2018 Date Mailed: v. 5.17 Field Rep: Steven Kuffel, StafZPnnapal�or Principal / PM: Bruce Blyton, P.E. This document is considered a DRAFT until signed or initialed by an AE5/ Pr ct Manager AESI FIELD REPORT To: Distribution Project Name: Waltz Residence Date: 04/27/18 Project No.: 160530EO02 Permit No. DCI No. NL t / 4, NL 1 / 4. LoLG 1 IUN L4. 1 UNNbMq' L r NUK I M. K/VVGL J tN I . N.M. 1 R ; Figure /: Approximate test locations for sewer utility backtill Figure 2: Approximate location and depth of compaction test for sewer utility backfill Copies To: Distribution Date Mailed: v. 5.17 Page 2 of 2 Field Rep: Steven Kuffel, Staff Geologist Principal / PM: Bruce Blyton, P.E. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager a s s o c i a t e d e a r t h s c i e n c e s incorporated 911 Fifth Avenue Kirkland, Washington 98033 Phone: 425-827-7701 Fax: 425- 827-5424 www.aesgeo.com To: Bob & Kathy Waltz c/o Sound Design Group 1326 51h Ave., Suite 400 Seattle, WA, 98101 ATTN: Dan Malone AS REQUESTED BY: Client FIELD REPORT Page 1 of 2 Date j Project Name Project No. 5/02/2018 Waltz Residence 160530EO02 Location Municipality Weather 1135 Viewland Way Edmonds 1; 60's, Sunny Permit No. DCI Permit No. Report No. NA 3 Engineer/Architect Client/Owner Bob and Kathy Waltz General Contractor/Superintendent Smallwood / Shad Grading Contractor/Superintendent Shoreline Construction/ Bill THE FOLLOWING WAS NOTED: Associated Earth Sciences, Inc. (AESI) was on site at the contractor's request for part-time geotechnical observation and testing. While on site we spoke with Bill of Shoreline Construction. Sewer Main: Prior to AESI's arrival the contractor had excavated a trench 7 feet deep for the sewer main line in Viewland Way and laid approximately 80 feet of sewer line. While we were on site the contractor set structure SSMH #2 and connected it to the sewer line. The trench was backfilled with 5/8" minus crushed rock. The backfill was placed in lifts and compacted after every lift with a hoe pack until it was firm and unyielding. AESI used a portable nuclear density gauge to take tests in the backfill. The test results are shown in the table below and the test locations are shown on the sewer plan on page 2. AESI will return tomorrow for additional observation and testing. . Test No. Location Depth (ft) Proctor OMC %MC DID (pcf) % Compaction li 1 Sewer main surface 132.5 7.5 9.4 126.5 95 P 2 Sewer main -4 132.5 7.5 8.4 129.8 98 P Copies To: Distribution Date Mailed: v. 5.17 Field Rep: David Bair MAY 1 1 2018 Principal / PM: Bruce Blyton, P.E. This document is considered a DRAFT until signed or initialed by an AESI Principal or Pr ect Manager AESI FIELD REPORT I 1 i MIN - To: Distribution Date: 05/03/18 1 III I� I I I I I t l l i l w l I l j l 1 1 1 1 1 rb Project Name: Waltz Residence Project No.: 160530E002 I I t Page 2 of 2 A 1 _ aie- ccam�.w,, --1�— SSMN iEf e indicates test nundw and approximate test location 20 o a m a Copies To: Date Mailed: v. 5.17 Distribution Field Rep: David Bair Principal / PM: Bruce Blyton, P.E. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager a s s o c i a t e d e a r t h s c i e n c e s i n c o r p o r a t e d FIELD REPORT Page 1 of 1 911 Fifth Avenue Date Project Name Project No. Kirkland, Washington 98033 3 MAY 18 { Waltz Residence 160530EO02 Phone: 425-827-7701 Location i Municipality Weather Fax: 425-827-5424 1135 Viewland Way Edmonds 60's Sunny www.aesgeo.com Permit No. ! SDCI Permit No. Report No. NA 4 _ Engineer/Architect TO: Bob & Kathy Waltz c/o Sound Design Group CG Engineering/Sound Design Group__ 1326 5th Ave., Suite 400 Client/owner Bob and Kathy Waltz Seattle, WA, 98101 ATTN: Dan Malone General Contractor/Superintendent Smallwood / Shad _ Earthwork Contractor/Superintendent AS REQUESTED BY: General Contractor Shoreline Construction/ Jeff THE FOLLOWING WAS NOTED: We were on site for construction monitoring of earthwork activities. While on site, we met with Jeff from Shoreline Construction, Chris from the City of Edmonds and spoke with Shad from Smallwood. Side Sewer: Upon our arrival, the earthwork contractor informed us they were still in the process of installing the side sewer line from the main line in Viewland Way at station 3+22. We observed the depth of cover for the about 20 feet run of side sewer line ranged from 10 to 6 feet, from main to clean out. The contractor backfilled and compacted the side sewer trench line with 5/8 inch minus crushed rock in 2 to 3 feet lifts with a hoe pac mounted on an excavator. We performed two in place density readings on the compacted trench line backfill with results that ranged from 95 to 97% of the maximum dry density. We were able to penetrate from 2 to 4 inches into the surface of the compacted lifts with a 1/2 inch diameter probe rod. Conclusion: We informed both the general and earthwork contractors the side sewer trench backf!II observed today met the 95% compaction criteria. The earthwork contractor informed us that they had completed the installation of the sewer main and side line, and would pave the street within a month. The general contractor also informed us they anticipate installation of the pin piles for the proposed residence within a month. Reading No. Location Depth (ft) Max DID (pcf) DID (pcf) MC (%) Compact (%) Pass/Fail 1 Side Sewer, Near Main -4 132.5 125.3 9.5 95 Pass 2 Side Sewer, Near Main -2 132.5 127.1 8.4 96 Pass 3 Side Sewer, Near Main 0 132.5 128.3 9.2 97 Pass R 571F-Cn Srn MR( SSM W/ W CASj IRON UM"'Ot C R 1/7' MO"'s R 705 ] (Ull VADIN GRMD RovERu. � w Readings 1 to 3 Copies To: Distribution Date Mailed: v.5.17 IE•lOR.O r ,l;al r I -I N(Vi 1 1/7. coP" TER SERVICE UM( i 141 (RACER WIRE ;• ° Iil Side Sewer Installed Today OW e. , IR IF ,r RVC f 2 Rs NSIf` _$W"R1, a776 Roe 1) - new 7184 _e .. Field Rep: Su-Kiet Lieu Principal / PM: Bruce Blyton, P.E. This document is considered a DRAFT until signed or initialed by an AE51 nncipal or Pr ject Manager