DATE: December 30, 2019
TO: Kayla Nichols, Select Homes Inc.
FROM: Kevin Bloomfield, Plans Examiner
RE: Plan Check: BLD 2019-1321
Project Address: 16531 13th Ave W
Scope: New SFR
Thank you for submitting your plans to the City of Edmonds for review. We have completed an
initial review of the project mentioned above. For this project to move forward a few items will
need to be addressed.
Once a revised set of plans, including a written response to the list of the items contained in this
letter are resubmitted, we can complete the review. Some items may require a review by other
divisions, such as Planning, Engineering, or Fire and will be noted as such.
Resubmittals can be made at the Development Services Department on the 2nd Floor of City
Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on
Wednesdays.
To complete the review the following items will need to be addressed:
Sheet A5:
Calculations appear to conflict with the drawings in the following areas:
1. 24.5’ G.L.B. at left side of plans page is not in the calc pack. Please calculate and add to the
calc pack.
2. 15.5’ G.L.B. between dinning and great room states 18” on plans, however calc pack shows
15”, which appears to be undersized. Please recalculate and revise as needed.
3. 7’ 4x10 right side of plans does not show point load in the calculation package. Please add
point load and recalculate.
4. 19’ G.L.B. at garage door not in calculations please revise and add to calc package.
Please review all calculations to assure they match the plans.
Sheet A6:
5. The laundry room on the second floor will need to account for makeup air considering the
appliances contained within. G2439.5 (614.6) Makeup Air Installations exhausting more
than 200 cfm (0.09 m3/s) shall be provided with makeup air. Where a closet is designed for
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
Page 2 of 2
the installation of a clothes dryer, an opening having an area of not less than 100 square
inches (0.0645 m2) for makeup air shall be provided in the closet enclosure, or makeup
air shall be provided by other approved means.
Sheet A8:
6. Note for efficiency credit 1A states U-Value of .28. The energy calculation package states
.30. Please change energy calculations package to reflect the .28 requirement.
7. Plans state the home energy credits used are 1A (with a fenestration factor of .28), 3A, 5A
and 5C and the chart states a fenestration U-Factor of .30. However the calculations package
reflects 3A, 4, 5A and 5B. Please revise plans or calculations to match and represent the
credits you are satisfying.
Sheet G1:
8. Stair detail should include Guard and Rail Restrictions. The maximum clearances are noted
on the plans.
Please review the complete calculations package to assure all beams are included in the package.
If you need any clarification or have any questions at all, please feel free to call anytime.
Kevin Bloomfield