5 Corners Reservoir Recoat - Punchlist 10.29.20St.
PROJECT PUNCHLIST 10/29/2020
PROJECT NAME:
CONTRACT NO.:
Five Corners Reservoir Recoating Project
E5KA
Owner:
Contractor:
City of Edmonds
Redside Construction LLC
121 Fifth Avenue North
600 Winslow Way E Suite #237
Edmonds, WA 98020
Bainbridge Island, WA 98110
No.
litern
I Location
Description
1.5 MG Tank Interior (After Tank is Drained October 2020)
Spot treat corrosion at the bolted flange interface
A-2 10-inch
between the Tideflex valve and the elbow. Add Pyrox
Diameter Inlet
1
1. 5 MG Tank Inlet
G- 10 insulated washers and sleeves at each fastener
Piping
after swapping TIdeflex valve on Inlet with NSF-61
Replacement
TIdeflex valve on 1. 5 MG tank o verfib w pipe.
A-2 10-inch
Spot treat corrosion at the bolted flange interface
Diameter Inlet
2
1. 5 MG Tank Inlet
between the elbow and the spool. Confirm or add
Piping
Pyrox G- 10 sleeves at each fastener.
Replacement
A- 18.2 Recoat
Spot treat corrosion at all columns and column bases
3
1. 5 MG Tank Columns
Reservoir Interior
where corrosion Is evident.
A- 18.2 Recoat
Spot treat minor areas of corrosion on tank wall
4
1. 5 MG Tank Walls
Reservoir Interior
where corrosion is evident
1.5 MG Tank Exterior
A-3 10-Inch
Diameter Overflow
5
1. 5 MG Tank 0 verflo w
Spot treat corrosion.
Piping with Baffle
Cone Replacement
A -4 Man way Bolt
At manway gasket interfaces repair damaged coaling,
1. 5 MG Tank 24-inch and
6
and Gasket
prep and recoat, Replace damaged gaskets. Provide
36-inch Man ways
Replacement
adequate cure time before closing man way.
A- 19.5 Recoat
7
1. 5 MG Tank Vent
Spot treat corrosion along roof vent flange.
Reservoir Exterior
A- 19.5 Recoat
8
1. 5 MG Tank Fain ters Lug
Spot treat minor area of corrosion at painters lug.
Reservoir Exterior
Embedded Blast Media and
A- 19.5 Recoat
9
Debris on 1. 5 MG Tank Wall
Sand out blast media and debris and reapply topcoat.
Reservoir Exterior
and Appurtenances
3.0 MG Tank Exterior
B- 16.5 Recoat
10
3. 0 MG Tank Roof
Spot treat minor areas of corrosion on roof
Reservoir Exterior
B- 16.5 Recoat
I I
3. 0 MG Tank Roof Hatch
Spot treat areas of corrosion on roof hatch.
Reservoir Exterior
B- 16.5 Recoat
Spot treat minor area of corrosion on bottom rung of
12
3. 0 MG Tank Ladder
Reservoir Exterior
ladder.
B- 16.5 Recoat
13
3 0 MG Tank Man way
Spot treat minor area of corrosion on man way.
Reservoir Exterior
ff the damage is to bare metal, prep surface, prime
Trade Damage on 3. 0 MG
B- 16.5 Recoat
with Macropoxy 64 and finish with HS Polyurethane. ff
14
Tank Ladder and Sampling
Reservoir Exterior
the damage Is to final coaling, prep surface and apply
Box Lid
finish coat.