Loading...
3828_001C 1ERUkW MAKING A DIFFERENCE DATE: February 27, 2020 TO; City of Edmonds, Plan Review, Engineering Division FROM: Pat Pearson, Chermak Construction, Project Developer RE- Application #: BLD20190731 Project: Szwec Residence Addition Project Address: 700 7 th Ave S 1. WSEC R406 ENERGY CREDIT 5a All showerhead and kitchen sink faucets installed in the house shall be rated at 1.75 GPM or less. All other lavatory faucets shall be rated at 1.0 GPM or less as noted on page 2. See attached Spec Sheets. 2. HEATING WSEC R403.7.1 See notes on page 2. Bathroom to be heated by one (1) 1500 waft forced air electric heater plus 200 s.f. of in floor electric radiant cable rated at 2400 wafts. Storeroom to be heated by one (1) 750 watt electric baseboard. 3. Pages 7 & 8 LEGIBILITY Pages have been recopied from original document. 425.776.1367 - 655 Edmonds Way - Edmonds, Washington 98020 - CHERM C1 11 NU O�: F. bj, 4. DATE: TO: FROM: RE: City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 February 7, 2020 Chermak Construction/ Pat Pearson Donovan Akau, Plans Examiner Plan Check: BLD2019-0731 Project Address: 700 71 Avenue South Scope: Addition of Master Bathroom Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, includhig a written respollse in itemized letter forinat indicatin? where the 'clouded' or otlier%yise Ilip dited clianpes can be found on the 111iL revised plans, have been submitted to a Permit Coordinator. Resubnrittals must be made at the Development Services Department on the 21 Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. General: 1. It appears that the required WSEC credit for this project has not been provided for this project. Please provide the credit requirement, and how it this going to be achieved. R406 WSEC 2. It appears that this project exceeds the maximum total installed heating capacity of 2Kw for the new addition. Please make corrections. Section R403.7. 1. 3. It is difficult to read the darkened areas of the notes on pages 7 and 8. Please make corrections to plans so that it is legible (easier to read). Upon review of the resubmitted documents, additional comments may be generated. Sincerely. Donovan Akau